Project Order Sample Clauses

Project Order. The terms of the Project Order shall be effective for seven (7) days after presentation to Client. In the event this Agreement is not executed by Client within the time identified, the Project Order, together with any related terms and conditions and deliverables, may expire or may be subject to amendment, change or substitution.
AutoNDA by SimpleDocs
Project Order. A form letter executed by the parties under a Contract, providing the Consultant with authorization to perform the services outlined therein and to assign Key Personnel noted therein to a specific classification under a project or projects. This document outlines the duties, the timeframe within which to complete, and the maximum amount that can be expended for the work ordered without additional approval by the Authority. Appendix A Maine Turnpike Authority Task/Project Order Task/Project #: Consultant Contact: Reference Code #: Consultant Firm Names: Accounting Project Key Code #: Address: Contract #: Vendor Customer #: MTA Contact: Date: Subject: Assignment of Work Per this Task/Project Order, XX is hereby authorized to perform Engineering Consultant services for: Project Name:
Project Order. A form letter executed by the parties under a Contract, providing the Consultant with authorization to perform the services outlined therein and to assign Key Personnel noted therein to a specific classification under a project or projects. This document outlines the duties, the timeframe within which to complete, and the maximum amount that can be expended for the work ordered without additional approval by the Authority.
Project Order. In accordance with the provisions of Owner’s RFQ #23-ODU-04-CCC Project Title: Project Code – PC#: General Project Description: (Brief Description) The Project Code (PC#) indicated above shall be included on all Project-related material and documents including, but not limited to, Notices, Change Orders, Submittals, Requests For Information, Requests For Quotes, Field Orders, minutes of meetings, correspondence, Schedule of Values and Certificate For Payment (CO-12), and test reports.
Project Order. Biofield and Oncophysics shall mutually agree to a written description of each Project (each, a "Project Order"). Each Project Order shall be in a form mutually satisfactory to Biofield and Oncophysics. Each Project Order shall set forth the protocols for the Project, and/or such other details of the Project as the parties shall deem appropriate or necessary. Each Project Order shall include a Project Budget (as hereinafter defined), and shall set forth the payment terms agreed to by the parties with respect to the Project. Except to the extent expressly stated otherwise therein, each Project Order shall be subject to all terms and conditions of this Agreement. Upon Oncophysics's receipt and written acceptance of a Project Order signed by Biofield with respect to a Project, Oncophysics shall perform the services specified therein in accordance with the Project Order. The cancellation of Project Orders shall be governed by the provisions of Section 10.
Project Order. This Project Order constitutes a “Project Order” under the Master Services Agreement effective as of August 6, 2012, entered into between Quintiles Commercial Europe Limited and Alimera (the “Master Agreement”), and is subject to all of the terms and conditions set forth in the Master Agreement (as though ____ replaced Quintiles Commercial in each and every location where Quintiles Commercial is referenced in the Master Agreement), which Master Agreement shall be incorporated into this Project Order by reference, except as may be otherwise expressly provided herein. Without limiting Clause 1.2.1 of the Master Agreement, all claims, actions, proceedings, investigations or litigation relating to or arising from or in connection with this Project Order, including the Services provided hereunder, may be dealt with solely by and between the Parties hereto.
Project Order. 1 will include, at a minimum, and require the delivery of full documentation to support the development of the initial business model concept for B-MS requested services, development of B-MS directed customization of the initial business plan, development of initial high level processes, work plans, required components for the initial 240 Programs and all presentations to B-MS and related consulting services. In addition, Project Order 1 will cover all consulting services and processes developed to date. The payment schedule, complete scope of services and activities will be specified in Project Order 1, which shall be submitted by the Company, and if acceptable to B-MS, approved in writing by B-MS prior to the final execution of this Agreement. The maximum payment for Project Order 1 will be One Million Dollars ($1,000,000).
AutoNDA by SimpleDocs
Project Order. 2 will include, at a minimum, and require delivery of documentation and prototypes for the design and approval by B-MS of detailed process, work plans, systems and organization structures for the opinion leader recruitment and management system, the broadcast scheduling and logistics system and the extranet website. In addition, Project Order 2 will include and provide full documentation of the design of detailed processes and work plans for broadcast execution, content management, training plans and curriculum design for B-MS sales force, Co-Pilots, Concierges and other necessary personnel related to the initial 240 programs, delivery of the database cross-match of the POL membership to B-MS's T2001 database, services in preparation and support for Neuroscience Opinion Leader training and services related to the Plan of Action meetings for the Neuroscience/Infectious Disease/Dermatology (NID) sales force, as well as, detailed work plans for all activities related to the 240 programs and execution of activities related to retaining staff to implement the 240 Program roll-out. The payment schedule, complete scope of Services and related activities will be specified in Project Order 1, which shall be submitted by the Company and if acceptable to B-MS approved in writing by B-MS prior to the final execution of this Agreement. The maximum payment for Project Order 2 will be Four Million Dollars ($4,000,000).

Related to Project Order

  • Product Orders Product orders submitted by the Representative shall be deemed to be an offer to purchase by the purchaser, and are subject to final approval and acceptance by Ilios at its Home Office in Waltham, Massachusetts.

  • Project Oversight Inspection and acceptance of the Work shall be performed by Xxxxxx Xxxxxx, Construction Manager of the Planning, Development & Facilities Department of the District. The architect for the Project is not applicable to this project, and the Project Manager on the Project is Xxxxxx Xxxxxx, (“Project Manager”)

  • Project Agreements Provided that where the company commences work on a project where a site agreement exists to which the company is contractually obligated or where a site agreement exists between the union and the client or their agent that provides for higher rates of pay and conditions, the conditions contained in any such site agreement will take precedence over this Agreement for the duration of the project.

  • Project Overview Project Title [Drafting note: ARENA to complete. Insert full long name in accordance with ARENA’s naming convention] i.e. [GMS Number] [Powerworks, voltage control on the Pacific Islands Study] [GMS Number] [study/ project/ fellowship/ scholarship/ R&D Project] Contract Number [Drafting note: ARENA to complete – to be obtained from ARENA’s GMS] Recipient [Drafting note: Recipient to insert full legal name and ABN] Guidelines and policies Advancing Renewables Program – Program Guidelines, 2020 (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/XXXXX_XXX_Xxxxxxxxxx_XX_Xxxxxx_Xxxxx_XXXXX.xxx) ARENA Variation Policy (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/xxxxx-xxxxxxx-xxxxxxxxx-xxxxxxxxx-xxxxxx.xxx) ARENA Report Writing Guidelines (xxxxx://xxxxx.xxx.xx/xxxxxx/0000/00/xxxxx-xxxxxx-xxxxxxx-xxxxxxxxxx.xxx)

  • Project Agreement The Parties hereto have signed the Project Agreement, in counterpart, on the dates indicated below. Original Signed by 04-09-09 Xxxxxx Xxxxx Date Deputy Minister Natural Resources Canada Original Signed by 05-08-09 Xxxxx Xxxxxxxxx Date President Canadian Environmental Assessment Agency Original Signed by 04-08-09 Xxx Xxxxxxxx Date Chairman & Chief Executive Officer Canada-Newfoundland and Labrador Offshore Petroleum Board Original Signed by 19-08-09 Xxxxxx Xxxxxxxxx Date Deputy Minister Fisheries and Oceans Canada Original Signed by 18-08-09 Xxxxxx Xxxxxxxxxxx Date Deputy Minister Transport Canada Original Signed by 08-08-09 Xxx Xxxxxxx Date Deputy Minister Environment Canada Original Signed by 05-08-09 Xxxxxxx Xxxxxxx Date Deputy Minister Industry Canada Annexes Annex I Xxxxx Chart: Target Timelines for the Federal Review for the Project Annex II Key Milestones and Service Standards for the Environmental Assessment Annex III Canada-Newfoundland and Labrador Offshore Petroleum Board: Roles, Responsibilities, Key Milestones and Service Standards Annex IV Fisheries and Oceans Canada: Roles, Responsibilities, Key Milestones and Service Standards Annex V Transport Canada: Roles, Responsibilities, Key Milestones and Service Standards Annex VI Environment Canada: Roles, Responsibilities, Key Milestones and Service Standards Annex VII Industry Canada: Roles, Responsibilities, Key Milestones and Service Standards Annex VIII Other Government Departments and Agencies: Roles and Responsibilities Annex I Xxxxx Chart: Target Timelines for the Federal Review for the Project Xxxxx XX Key Milestones and Service Standards for the Environmental Assessment Description/Activity Lead Support As Needed Service Standard/ Completion Date Post the Notice of Commencement of the EA on the CEAR C-NLOPB RAs, CEA Agency Completed – March 6, 2009 Public Comment Period on the Proposed Scope C-NLOPB RAs, CEA Agency Completed – May 22, 2009 Announce Availability of Participant Funding CEA Agency Completed – April 22, 2009 Finalize Proposed Scope following Public Review Period RAs CEA Agency Coincident with submission of Comprehensive Study Track Report Submit Comprehensive Study Track Report to Minister of the Environment C-NLOPB RAs, CEA Agency Completed – June 18, 2009 Make EA Track Decision Minister of the Environment CEA Agency Completed – July 22, 2009 Award Participant Funding CEA Agency Coincident with posting of the Notice of the Minister’s EA Track Decision Post the Final Scope on the CEAR C-NLOPB RAs, CEA Agency Within five days following the Minister’s Track Decision Submit Draft Comprehensive Study Report (CSR) Proponent Determined by the Proponent Public Comment Period on the Draft CSR CEA Agency Eight weeks following receipt of the Draft CSR Review Draft CSR RAs FAs, CEA Agency Eight weeks following receipt of draft CSR Analyze Public Comments and Submit Federal Response to Proponent RAs FAs, CEA Agency Three weeks from the close of the Public Comment Period on Draft CSR Submit Revised CSR Proponent Determined by the Proponent Review Proponent’s Response to Comments on Draft CSR and direct Proponent to finalize CSR RAs FAs, CEA Agency 21 days from receipt of Proponent’s response Submit Final CSR Proponent Determined by the Proponent Approve Final CSR RAs FAs, CEA Agency 21 days from receipt of Final CSR Submit CSR to Minister of RAs FAs, Following the approval of the Final Description/Activity Lead Support As Needed Service Standard/ Completion Date the Environment CEA Agency CSR Public Comment Period on the Final CSR CEA Agency RAs, FAs 30 days following approval of the Final CSR Post Notice and Analysis of Public Comments on the Final CSR on the CEAR CEA Agency RAs, FAs Coincident with the posting of the Minister’s EA Decision Statement Post Notice of Minister of the Environment’s EA Decision CEA Agency 35 days from the close of the Public Comment Period on the Final CSR Post Course of Action Decisions on the CEAR C-NLOPB CEA Agency Within four weeks of Minister’s EA Decision Xxxxx XXX Canada-Newfoundland and Labrador Offshore Petroleum Board Roles, Responsibilities, Key Milestones and Service Standards EA • Participate in meetings with other federal/provincial authorities as appropriate; • Review and comment on the EA work plan, public participation plan and communications plan; • Review and provide input into the CSR; • Provide expert advice with respect to C-NLOPB’s mandate under the Atlantic Accord Implementation Act (AAIA); • Take course of action decision following the Minister of the Environment’s EA decision; • Provide input into the follow-up and monitoring programs relative to C-NLOPB’s areas of regulatory responsibilities and areas of interest as required; and • Work with other RAs and FAs to ensure implementation of mitigation measures and those aspects of the follow-up program related to C-NLOPB’s areas of regulatory responsibilities and areas of interest under the AAIA as required. Regulatory • Participate in meetings with other federal/provincial authorities as appropriate; • Undertake any required activities related to C-NLOPB’s regulatory responsibilities under the AAIA as required to support C-NLOPB’s regulatory decisions; and • Conduct monitoring, inspections, audits and investigations to support its regulatory decisions as required. Note: The following milestones represent the key activities associated with the regulatory process for the Project and are not intended to reflect the entire work plan schedule associated with this Project. Furthermore, these milestones may need to be adjusted as additional information is made available. MILESTONE ACTIVITIES/DESCRIPTION LEAD SERVICE STANDARD Liaise with Proponent regarding relevant issues associated with preparation of a Development Plan (DP) and Canada- NL Benefits Plan (BP) pursuant to the AAIA C-NLOPB liaises with Proponent regarding issues relevant to preparation of a complete DP and BP, in consideration of the C-NLOPB’s February 2006 Development Plan Guidelines and its February 2006 Canada-NL Benefits Plan Guidelines C-NLOPB Ongoing Announce public review process for review of DP and BP C-NLOPB will determine, in consideration of the Project Description and the Minister of the Environment’s EA track decision, the most appropriate public review process for review of the DP and the BP. C-NLOPB In a timely manner following Minister of the Environment’s EA track decision Submission of Development Plan and Canada-NL Benefits Plan Proponent provides C-NLOPB with a complete DP and BP supported by such documents as are necessary, including but not limited to an Environmental Impact Statement (EIS) and a Socio-Economic Impact Statement. The CSR and its associated documentation shall fulfil the requirements for an EIS. Proponent Dependent upon the Proponent Refer/Publish DP and BP If Public Review Body appointed under the AAIA, file DP and BP documentation with it for review. Otherwise, publish DP and BP for public comment. C-NLOPB 1 day after application submission Publication of AAIA Public Review Body report If appointed, Public Review Body publishes report AAIA Public Review Body No later than 270 days from referral of DP and BP, or such shorter period as the C-NLOPB may determine C-NLOPB staff finalize proposed DP, BP decisions C-NLOPB staff finalize proposed DP and BP decisions, ensuring appropriate consideration of Public Review Body report, and reflection of Minister of the Environment’s EA Decision C-NLOPB 30 days from the later of: publication of the Public Review Body report OR the Minister of the Environment’s EA Decision C-NLOPB Board makes DP, BP decisions C-NLOPB Board Members consider the proposed decisions. C-NLOPB finalizes its decisions respecting the DP and the BP; submits DP decision to Minister of Natural Resources Canada and NL Minister of Natural Resources C-NLOPB 60 days from finalization of proposed DP, BP decisions Approve/reject DP decision Minister of NRCan and NL Minister of Natural Resources approve or reject the C-NLOPB DP decision. AAIA prescribes 30-day maximum period for this activity. NL Minister of Natural Resources, Minister of NRCan No later than 30 days from submission by C-NLOPB of DP decision Announce, publish DP and BP decisions C-NLOPB publishes DP and BP decisions following receipt of approval from Ministers of Natural Resources C-NLOPB Within 5 days of receipt of approval from both Ministers Annex IV Fisheries and Oceans Canada Roles, Responsibilities, Key Milestones and Service Standards EA • Participate in meetings with other federal/provincial authorities as appropriate; • Review and comment on the EA work plan, public participation plan and communications plan; • Review and provide input into the CSR; • Provide expert advice with respect to DFO’s mandate under the Fisheries Act and aquatic species under the Species at Risk Act, where appropriate; • Take a course of action decision following the Minister of the Environment’s EA decision; • Provide input into the follow-up and monitoring programs relative to DFO’s areas of regulatory responsibilities and areas of interest under the Fisheries Act and aquatic species under the Species at Risk Act as required; and • Work with other RAs and FAs to ensure implementation of mitigation measures and those aspects of the follow-up program, related to DFO’s areas of regulatory responsibilities and areas of interest under the Fisheries Act and aquatic species under the Species at Risk Act as required. Regulatory • Participate in meetings with other federal/provincial authorities as appropriate; • Prepare regulatory work plan; • Undertake any required activities related to DFO’s mandate under the Fisheries Act and aquatic species under the Species at Risk Act as required, to support DFO’s regulatory decisions. Note: The following milestones represent the key activities associated with the regulatory process for the Project and are not intended to reflect the entire work plan schedule associated with this Project. Furthermore, these milestones may need to be adjusted as additional information is made available. MILESTONE ACTIVITIES/DESCRIPTION LEAD SERVICE STANDARD Receipt from Proponent of an application for a Subsection 35(2) Fisheries Act authorization DFO receives application from the Proponent for authorization of impacts to fish and fish habitat under subsection 35(2) of the Fisheries Act complete with adequate plans, maps, reports and data to support the review. This may include a Fish Habitat Compensation Proponent Dependent on timing of the submission of the application by the Proponent. The application should be received in conjunction with the draft CSR. Plan/Strategy to support the Fisheries Act review. DFO response to Proponent regarding impacts to fish and fish habitat and the Fish Habitat Compensation Plan/Strategy (if provided) DFO reviews the application package (including proposed Fish Habitat Compensation Plan/Strategy and associated financial security, if applicable), for adequacy, to support the Fisheries Act review. DFO requests further information, if required, to proceed with review of the application (and the CSR, if reviews are concurrent). DFO Concurrent with review of the CSR if application is received during the CSR review. Receipt of additional information from Proponent DFO receives additional information from Proponent Proponent Dependent on timing of the submission of additional information by Proponent DFO response to Proponent regarding Receipt/Review of the Fish Habitat Compensation Plan DFO notifies Proponent that the Fish Habitat Compensation Plan is acceptable DFO Within 60 days of receipt of an acceptable Fish Habitat Compensation Plan. Decision by DFO regarding Issuance of Subsection 35(2) Fisheries Act authorization If appropriate, DFO issues Fisheries Act authorization to Proponent for impacts to fish and fish habitat. DFO DFO issues an authorization contingent on the EA Course of Action Decision under paragraph 37(1)(a) of the CEAA. If the Minister of the Environment issues an environmental assessment decision statement under subsection 23(1) of the CEAA, to the effect that the Project is likely to cause significant environmental effects, DFO’s course of action must be approved by the Governor in Council. If this is the case and the course of action allows for the issuance of an authorization, then the following timelines will only apply once that approval is provided. DFO issues the authorization 90 calendar days after DFO makes its course of action decision. Issuance will be contingent upon receipt of an acceptable Fish Habitat Compensation Plan (including financial security) and the discharge of any legal Aboriginal consultation obligations associated with the authorization(s). Issuance of the authorization will also consider the Proponent’s timing needs for the authorization in that, should the authorization not be required until much later than the timeline above, DFO will issue it when it is appropriate. Annex V Transport Canada Roles, Responsibilities, Key Milestones and Service Standards EA • Participate in meetings with other federal/provincial authorities as appropriate; • Review and comment on the EA work plan, public participation plan and communications plan; • Review and provide input into the CSR;

  • Amendment of Material Documents No Loan Party will, nor will it permit any Subsidiary to, amend, modify or waive any of its rights under (a) any agreement relating to any Subordinated Indebtedness, or (b) its charter, articles or certificate of organization or incorporation and bylaws or operating, management or partnership agreement, or other organizational or governing documents, to the extent any such amendment, modification or waiver would be adverse to the Lenders.

  • Project Documents In addition to any other pertinent and necessary Project documents, the following documents shall be used in the development of the Project:

  • Construction Contract Documents The Construction Contract Documents shall consist of the plans and specifications prepared by the Engineer, and any addenda and change orders thereto, and the Owner-Contractor Agreement, all of which shall be compatible and consistent with this Agreement.

  • Supply Agreements For a period of three years from the consummation of the IPO, Odetics shall not unilaterally terminate or assign its guarantee obligation with respect to any supply agreement pursuant to which it has guaranteed the performance by ATL of ATL's obligations, unless such suppliers have consented to the termination or assignment of such guarantee.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.