Common use of Project Limits Clause in Contracts

Project Limits. The project limits include a QL B field investigation and corresponding designating of existing utilities within the project area along Main Street between 600 West and 300 East in Santaquin, Utah County, Utah. The project area can be seen in Figure 1 below. The designating of some individual utilities may extend beyond the noted ▇▇▇ project limits to include surface features or structures which are necessary to complete QL C alignments. Table 1 presents the utility owners listed by Blue Stakes of Utah as being present within or nearby the project area, along with the estimated lineal footages which are the basis for the Phase 1 cost estimate. Table 2 presents the proposed utility designating quality levels for the various facilities that are anticipated. Figure 1-Overview of project limits. Project limits are along Main Street, from 600 West to 300 East. Table 1. Utility Owners and Estimated Lineal Footages for the QL B Phase 1 Utility Designating Area, based on Blue Stakes of Utah for the project area. UDOT* Fiber, Traffic 12,500 Total 85,700 *Record information not available at the time of estimate. Table 2. Proposed designation of utilities for the subject project Phase I ▇▇▇ investigation. Storm Drain QL A at accessible inlets/outlets; QL C between accessible features N/A Sanitary Sewer QL A at accessible inlets/outlets; QL C between accessible features; QL D (based on available records from Santaquin City) Culverts QL A at accessible inlets/outlets; QL C between accessible features N/A Telecommunication QL B QL B Cable TV QL B QL B Natural Gas QL B QL B Traffic Signals QL B N/A ATMS QL B N/A Lighting QL B N/A Water Mains QL B QL B Buried Power QL B QL B Private sprinklers Not included in this scope of work; N/A Petroleum None anticipated Military Comm. None anticipated N/A ▇▇▇▇▇ (Water, Crude Oil, Natural Gas) Presently not included in this scope of work; however, ▇▇▇▇▇ encountered incidental to the field work will be noted. N/A Note: QL refers to the quality level as described in ASCE/CI 38-02 Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data.

Appears in 1 contract

Sources: Agreement for Professional Services

Project Limits. The project limits include a QL B field investigation area is located at the intersection of SH‐60 and corresponding designating of existing utilities within the project area along Main Street between 600 West and 300 East CR‐13 in SantaquinJohnstown, Utah County, UtahCO. The project area can be seen in Figure 1 below. The designating of some individual utilities may extend beyond the noted ▇▇▇ SUE project limits to include surface features or structures which are necessary to complete QL C alignments. Table 1 presents the utility owners listed by Blue Stakes of Utah Colorado 811 as being present within or nearby the project area, along with the estimated lineal footages which are the basis for the Phase 1 cost estimate. Table 2 presents the proposed utility designating quality levels for the various facilities that are anticipated. . Figure 1-Overview of project limits. Overall Project limits are along Main Street, from 600 West to 300 East. Area Table 1. Estimated Utility Owners and Estimated Lineal Linear Footages for within the QL B Phase 1 Utility Designating Areainvestigation areas. CDOT Electric, based on Blue Stakes Traffic 1,200 City of Utah for the project area. UDOT* ▇▇▇▇▇▇▇▇ Fiber, Traffic 12,500 Water 0 Civitas Resources Gas, Electric, Water 0 Consolidated Home Supply Ditch Irrigation 2,000 DCP Midstream Pipeline 1,100 Lumen Fiber, Telephone 5,350 Occidental Petroleum Pipeline 0 TDS Telecom Fiber, Telephone 1,400 Town of Johnstown Water, Sewer 5,250 Western Midstream Pipeline 0 Xcel Energy Electric, Gas 5,650 Total 85,700 21,950 *Record information not available at the time of estimate. Table 2. Proposed Targeted designation of utilities for the subject project Phase I ▇▇▇ SUE investigation. Storm Drain QL A at accessible inlets/outlets; QL C between accessible features N/A Sanitary Sewer QL A at accessible inlets/outlets; QL C between accessible features; features QL D (based on available records from Santaquin City) Culverts QL A at accessible inlets/outlets; QL C between accessible features N/A Telecommunication QL B QL B Cable TV QL B QL B Natural Gas QL B QL B Traffic Signals QL B N/A ATMS QL B None Anticipated N/A Lighting QL B N/A Water Mains QL B QL B Buried Power QL B QL B Private sprinklers Not included in this scope of work; however, identified surface facilities encountered incidental to the field work will be noted. N/A Petroleum None anticipated Anticipated Military Comm. None anticipated Anticipated N/A ▇▇▇▇▇ (Water, Crude Oil, Natural Gas) Presently not included in this scope of work; however, ▇▇▇▇▇ encountered incidental to the field work will be noted. N/A Note: QL refers to the quality level as described in ASCE/CI 38-02 Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data.A

Appears in 1 contract

Sources: Professional Services

Project Limits. The project limits include a QL B field investigation and corresponding designating of existing utilities within the project area along Main Timberline Road, from Mulberry Street between 600 West and 300 East to just south of ▇▇▇▇▇▇▇ Court in SantaquinFort ▇▇▇▇▇▇▇, Utah County, UtahColorado. The project area can be seen in Figure 1 below. The designating of some individual utilities may extend beyond the noted ▇▇▇ SUE project limits to include surface features or structures which are necessary to complete QL C alignments. Table 1 presents the utility owners listed by Blue Stakes of Utah Colorado 811 as being present within or nearby the project area, along with the estimated lineal footages which are the basis for the Phase 1 cost estimate. Table 2 presents the proposed utility designating quality levels for the various facilities that are anticipated. Figure 1-Overview : SUE Project Area. UMS, Inc. Page 5 8/18/2020 Utility Engineering Scope of project limits. Project limits are along Main StreetWork Timberline Road and Lincoln Avenue QL B Utility Designating Investigation Fort ▇▇▇▇▇▇▇, from 600 West to 300 East. Colorado Table 1. Utility Owners and Estimated Lineal Footages for the QL B Phase 1 Utility Designating Area, based on Blue Stakes of Utah for the project areaFootages. UDOT* Anheuser ▇▇▇▇▇ Inc. Sewer 650 Box Elder Sanitation District Sewer 950 CenturyLink Fiber, Traffic 12,500 Telco 1,450 City of Greeley Water, Sewer 0 Comcast CATV, Fiber 1,300 East Larimer County Water District Water 1,450 North Weld County Water District Water 1,450 Platte River Power Authority Electric, Fiber 1,300 Poudre Valley Rural Electric Assoc. Electric 0 Xcel Energy Electric, Gas 300 Total 85,700 11,550 *Record information not available at the time of estimate. Table 2. Proposed Targeted designation of utilities for the subject project Phase I ▇▇▇ SUE investigation. Storm Drain QL A at accessible inlets/outlets; QL C between accessible features N/A Sanitary Sewer QL A at accessible inlets/outlets; QL C between accessible features; QL D (based on available records from Santaquin City) features N/A Culverts QL A at accessible inlets/outlets; QL C between accessible features N/A Telecommunication QL B QL B Cable TV QL B QL B Natural Gas QL B QL B B, Traffic Signals QL B N/A ATMS QL B N/A Lighting QL B N/A Water Mains QL B B, C and D QL B B, Buried Power QL B QL B Private sprinklers Not included in this scope of work; N/A Petroleum None anticipated Military Comm. None anticipated N/A ▇▇▇▇▇ (Water, Crude Oil, Natural Gas) Presently not included in this scope of work; however, ▇▇▇▇▇ encountered incidental to the field work will be noted. N/A UMS, Inc. Page 6 8/18/2020 Utility Engineering Scope of Work Timberline Road and Lincoln Avenue QL B Utility Designating Investigation Fort ▇▇▇▇▇▇▇, Colorado Note: QL refers to the quality level as described in ASCE/CI 38-02 38‐02 Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data.

Appears in 1 contract

Sources: Work Order