Preparation of surface for strengthening canal sections/embankment. Prior to any earth fill placement, the surface to be occupied shall be cleared off all roots and vegetative matter of any kind and stripped to a suitable depth as directed by the Engineer-in-Charge. Normally, the depth of stripping shall vary from 7.5 cm to 20.00 cm. The depth to which top soil is stripped shall be adequate to removal all perishable material and any soil which may become unstable on saturation or may interface with development of proper bond between the existing surface and new embankments.
Appears in 31 contracts
Samples: www.mpwrd.gov.in, Agreement, Agreement
Preparation of surface for strengthening canal sections/embankment. Prior to any earth fill placement, the surface to be occupied shall be cleared off all roots and vegetative matter of any kind and stripped to a suitable depth as directed by the Engineer-in-in- Charge. Normally, the depth of stripping shall vary from 7.5 cm to 20.00 cm. The depth to which top soil is stripped shall be adequate to removal all perishable material and any soil which may become unstable on saturation or may interface with development of proper bond between the existing surface and new embankments.
Appears in 2 contracts
Samples: www.mpwrd.gov.in, www.mpwrd.gov.in