Power Requirements. 1. Four (4) 20 amp. 120 volts A.C. single phase 60 cycle circuits to be supplied, two (2) to stage left and two (2) to stage right. Each of these should have one (1) quad box on each circuits. 2. Each dressing room must have at least one (1) 20 amp. circuit.
Appears in 2 contracts
Sources: Technical Rider, Technical Rider