Planning Guidelines Sample Clauses

The Planning Guidelines clause establishes the standards and procedures that must be followed during the planning phase of a project or activity. It typically outlines requirements for developing project plans, timelines, resource allocation, and coordination among stakeholders. For example, it may specify the need for regular planning meetings, submission of detailed schedules, or adherence to regulatory requirements. The core function of this clause is to ensure that all parties have a clear, structured approach to planning, which helps prevent misunderstandings, delays, and resource mismanagement.
Planning Guidelines. The parties will develop a process for monitoring 18 compliance with planning guidelines by each school as well as a recommended 19 course of action when a school or work site is not in compliance.
Planning Guidelines. 2.1 The planning parameters for the Land Parcel: Land Parcel ST35A Lot No./Mk No. Lot 3688C / MK 11 Lot Area 11, 917.1 sqm #Land Area 11,167.7 sqm Location Sungei Tengah Road Land use/Zoning Agriculture Permitted Farm Type Vegetable Farming, excluding the production of bean sprouts *Building Height (Maximum) 60 m SHD Production Area (Minimum) 10,050.9 sqm ^Floor Area for ancillary uses (Maximum) 1,116.8 sqm # Land area excludes NParks’ green buffer and peripheral planting verge requirement. * SHD refers to Singapore Height Datum. Tenderers are to ensure that all buildings (inclusive of all structures and fixtures above the roof-top such as TV antennas, water tanks, lift motor rooms, cranes, maintenance equipment and lightning conductors), construction equipment and temporary structures, such as cranes, piling rig, etc within the Land Parcel should not exceed the stipulated height controls for the specific Land Parcel at all times. ^ Floor Area accounts for both outdoor and indoor floor areas. 2.2 The Successful Tenderer shall ensure that at least 90% of the Land Area shall be used for production and production-related purposes (herein referred to as “Production Area”).