Common use of Performance Guarantee Clause in Contracts

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat by the Town is contingent upon the Developer’s provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works’ estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Director of Engineering/Public Works, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 3 contracts

Samples: Subdivision Agreement, Subdivision Agreement, Subdivision Agreement

AutoNDA by SimpleDocs

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat by the Town is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s 's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s 's Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Director of Engineering/Town Public WorksWorks Director, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 2 contracts

Samples: Agreement, Subdivision Agreement

Performance Guarantee. In order to secure the construction and installation of the Public ImprovementsImprovements above-described for which the Developer is responsible, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx Gilpin County, which recording shall occur no later than ninety (90) days after the execution of this AgreementDecembex 0, 0998, furnish the TownCity, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town City is designated as beneficiary beneficiary, to secure the performance and completion of the Public Improvements, or the City may accept at its sole discretion some other form of security from the Developer in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, installed as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. C. The Developer agrees that approval of the final plat by the Town City is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this AgreementCity no later than December 1, 1998, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, City in the manner provided herein, herein shall negate the Town’s City's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town City Attorney. The Developer shall not start the any construction of any public or private improvement on the Property, Property including, but not limited to, staking, earth work, overlot grading grading, or the erection of any structure, temporary or otherwise, until the Town City has received and approved the irrevocable letter of credit; provided, however, this requirement shall not apply to the issuance of a bench excavation permit which is governed by City of Black Hawk ordinance. The City shall not issue a foundation excavation permit for the Property until such time as a CLOMR is issued for the Property. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s City's Director of Engineering/Public Works, and where appropriate the Manager of the District, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, Developer including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates estimates, and the Developer agrees to pay the actual costs Actual Costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town City reserves the right to review and adjust the cost estimates estimate on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, Index as published by the Engineering News Record. If the Town City adjusts the cost estimate estimated for the Public Improvements, the Town City shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town City with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town City with a new or amended letter of credit, the Town City may exercise the remedies provided for in Paragraph 6 paragraph 5 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town City shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph 9 paragraph 8 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town City may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town City may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, Improvements as the Town City deems appropriate. Upon completion of or performance of such improvements, conditions conditions, and requirements within the required time time, and the approval of the Town’s Director of Engineering/Public Works, ninety percent (90%) of the estimated costs of construction shall be released to the Developer within ten (10) days of acceptance by the City provided, however, the City shall issue an irrevocable letter of credit to retain through the Town in the amount of one (1) year warranty period at least twenty percent (20%) of the total cost of construction and installation costs of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement (Windsor Woodmont Black Hawk Resort Corp)

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat Final Plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat Final Plat by the Town is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s 's approval of the final platFinal Plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot over lot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s 's Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Director of Engineering/Town Public WorksWorks Director, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement

Performance Guarantee. In order to secure the construction and installation of the Public ImprovementsImprovements above-described for which the Developer is responsible, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx Gilpin County, which recording shall occur no later than ninety (90) days after the execution of this AgreementJune 1, 0000, furnish the TownCity, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town City is designated as beneficiary beneficiary, to secure the performance and completion of the Public Improvements, or the City may accept at its sole discretion some other form of security from the Developer in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, installed as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. C. The Developer agrees that approval of the final plat by the Town City is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this AgreementCity no later than June 1, 1998 in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, City in the manner provided herein, herein shall negate the Town’s City's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town City Attorney. The Developer shall not start the any construction of any public or private improvement on the Property, Property including, but not limited to, staking, earth work, overlot grading grading, or the erection of any structure, temporary or otherwise, until the Town City has received and approved the irrevocable letter of credit; provided, however, this requirement shall not apply to the issuance of a bench excavation permit which is governed by City of Black Hawk ordinance. The City shall not issue a foundation excavation permit for the Property until such time as a CLOMR is issued for the Property. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s City's Director of Engineering/Public Works, and where appropriate the Manager of the District, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, Developer including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates estimates, and the Developer agrees to pay the actual costs Actual Costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town City reserves the right to review and adjust the cost estimates estimate on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, Index as published by the Engineering News Record. If the Town City adjusts the cost estimate estimated for the Public Improvements, the Town City shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town City with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town City with a new or amended letter of credit, the Town City may exercise the remedies provided for in Paragraph 6 paragraph 5 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town City shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph 9 paragraph 8 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town City may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town City may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, Improvements as the Town City deems appropriate. Upon completion of or performance of such improvements, conditions conditions, and requirements within the required time time, and the approval of the Town’s Director of Engineering/Public Works, ninety percent (90%) of the estimated costs of construction shall be released to the Developer within ten (10) days of acceptance by the City provided, however, the City shall issue an irrevocable letter of credit to retain through the Town in the amount of one (1) year warranty period at least twenty percent (20%) of the total cost of construction and installation costs of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement (Windsor Woodmont Black Hawk Resort Corp)

Performance Guarantee. In order to secure the construction and installation of the Public ImprovementsImprovements above-described for which the Developer is responsible, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx Xxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the TownCity, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town City is designated as beneficiary beneficiary, to secure the performance and completion of the Public Improvements, or the City may accept at its sole discretion some other form of security from the Developer in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, installed as set forth in Exhibit C, to secure C which are estimated costs which may be increased at such time as the performance and completion Director of Public Works approves the construction documents for the Public Improvements. The Developer agrees that approval of the final plat by the Town City is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town City within ninety (90) days of the execution of this Agreement, Agreement in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, City in the manner provided herein, herein shall negate the Town’s City's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town City Attorney. The Developer shall not start the any construction of any public or private improvement on the Property, Property including, but not limited to, staking, earth work, overlot grading grading, or the erection of any structure, temporary or otherwise, until the Town City has received and approved the irrevocable letter of credit, except pursuant to a bench excavation permit duly issued by the City upon satisfaction of all City requirements for the issuance of a bench excavation permit and the posting of an irrevocable letter of credit for a bench excavation permit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s City's Director of Engineering/Public Works, Works based upon the construction documents for the Public Improvements as set forth in Exhibit C. approved by the Public Works Director. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, Developer including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates estimates, and the Developer agrees to pay the actual costs Actual Costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town City reserves the right to review and adjust the cost estimates estimate on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, Index as published by the Engineering News Record. If the Town City adjusts the cost estimate estimated for the Public Improvements, the Town City shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town City with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town City with a new or amended letter of credit, the Town City may exercise the remedies provided for in Paragraph 6 paragraph 5 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town City shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph 9 paragraph 8 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town City may draw drawn on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town City may draw on the letter of credit and either hold such funds as security for performance of this Agreement Agreement, or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, Improvements as the Town City deems appropriate. Upon completion of or performance of such improvements, conditions conditions, and requirements within the required time time, and the approval of the Town’s Director of Engineering/Public Works, ninety percent (90%) of the estimated costs of construction shall be released to the Developer within ten (10) days of acceptance by the City provided, however, the City shall issue an irrevocable letter of credit to retain through the Town in the amount of one (1) year warranty period at least twenty percent (20%) of the total cost of construction and installation costs of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement (Isle of Capri Black Hawk Capital Corp)

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat by the Town is contingent upon the Developer’s provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s 's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works’ estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Director of Engineering/Public Works, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements. Nuisance Conditions. The Developer agrees to prevent the existence of any nuisances by way of its construction activities, as nuisances are defined by Title 6 of the Parker Municipal Code, and as referenced in Title 11 of the Parker Municipal Code. In the event the authorized inspector/designated Town authority determines that a nuisance exists, the Developer shall be subject to the provisions set forth in Parker Municipal Code Sections 11.12.040 and 11.12.050, regarding the abatement of nuisances and the cost assessed for the abatement thereof. In addition to the provisions above, if the nuisance is not abated or an abatement plan is not submitted to the satisfaction of the Town, the Town may, upon thirty (30) days’ notice under this Agreement, exercise the right to draw upon the performance guarantee specified in paragraph 12 of this Agreement. The Town may draw on the performance guarantee in order to pay the cost of abating the nuisance, including any expenses and penalties incurred under the Parker Municipal Code. The Town may exercise this right in addition to, or in lieu of, the withholding of permits and/or the withholding of certificates of occupancy. The right to draw on the performance guarantee shall be subject to the sole discretion of the Town, provided the Developer has received thirty (30) days' notice, as provided herein. The Town Planning Department and the Department of Engineering/Public Works shall be authorized to cease processing any land use or permit applications submitted by the same developer for the property that is contained within the same Planned Unit Development, until the nuisance is abated. This shall include, but not be limited to, acceptance of applications, sending referrals, scheduling meetings or hearings, or conducting reviews of projects.

Appears in 1 contract

Samples: Subdivision Agreement

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat by the Town is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s 's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s 's Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s 's Director of Engineering/Public Works, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat Final Plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat Final Plat by the Town is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s 's approval of the final platFinal Plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot over lot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s 's Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Director of Engineering/Town Public WorksWorks Director, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-two- year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement

AutoNDA by SimpleDocs

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat by the Town is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s 's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s 's Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works’ ’s estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Town Director of Engineering/Public Works, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement

Performance Guarantee. In order to secure the construction and installation of the Public ImprovementsImprovements above-described for which the Developer is responsible, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx Gilpin County, which recording shall occur no later than ninety (90) days after xxxx xfter the execution of this Agreement, furnish the TownCity, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town City is designated as beneficiary beneficiary, to secure the performance and completion of the Public Improvements, or the City may accept at its sole discretion some other form of security from the Developer in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, installed as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. C. The Developer agrees that approval of the final plat by the Town City is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town City within ninety (90) days of the execution of this Agreement, Agreement in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, City in the manner provided herein, herein shall negate the Town’s City's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town City Attorney. The Developer shall not start the any construction of any public or private improvement on the Property, Property including, but not limited to, staking, earth work, overlot grading grading, or the erection of any structure, temporary or otherwise, until the Town City has received and approved the irrevocable letter of credit; provided, however, this requirement shall not apply to the issuance of a bench excavation permit which is governed by City of Black Hawk ordinance. The City shall not issue a foundation excavation permit for the Property until such time as a CLOMR is issued for the Property. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s City's Director of Engineering/Public Works, and where appropriate the Manager of the District, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, Developer including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates estimates, and the Developer agrees to pay the actual costs Actual Costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town City reserves the right to review and adjust the cost estimates estimate on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, Index as published by the Engineering News Record. If the Town City adjusts the cost estimate estimated for the Public Improvements, the Town City shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town City with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town City with a new or amended letter of credit, the Town City may exercise the remedies provided for in Paragraph 6 paragraph 5 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town City shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph 9 paragraph 8 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town City may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town City may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, Improvements as the Town City deems appropriate. Upon completion of or performance of such improvements, conditions conditions, and requirements within the required time time, and the approval of the Town’s Director of Engineering/Public Works, ninety percent (90%) of the estimated costs of construction shall be released to the Developer within ten (10) days of acceptance by the City provided, however, the City shall issue an irrevocable letter of credit to retain through the Town in the amount of one (1) year warranty period at least twenty percent (20%) of the total cost of construction and installation costs of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement (Windsor Woodmont Black Hawk Resort Corp)

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat by the Town is contingent upon the Developer’s provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s 's approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works’ estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Director of Engineering/Public Works, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements. Nuisance Conditions. The Developer agrees to prevent the existence of any nuisances by way of its construction activities, as nuisances are defined by Title 6 of the Xxxxxx Municipal Code, and as referenced in Title 11 of the Xxxxxx Municipal Code. In the event the authorized inspector/designated Town authority determines that a nuisance exists, the Developer shall be subject to the provisions set forth in Xxxxxx Municipal Code Sections 11.12.040 and 11.12.050, regarding the abatement of nuisances and the cost assessed for the abatement thereof. In addition to the provisions above, if the nuisance is not abated or an abatement plan is not submitted to the satisfaction of the Town, the Town may, upon thirty (30) days’ notice under this Agreement, exercise the right to draw upon the performance guarantee specified in paragraph 12 of this Agreement. The Town may draw on the performance guarantee in order to pay the cost of abating the nuisance, including any expenses and penalties incurred under the Xxxxxx Municipal Code. The Town may exercise this right in addition to, or in lieu of, the withholding of permits and/or the withholding of certificates of occupancy. The right to draw on the performance guarantee shall be subject to the sole discretion of the Town, provided the Developer has received thirty (30) days' notice, as provided herein. The Town Planning Department and the Department of Engineering/Public Works shall be authorized to cease processing any land use or permit applications submitted by the same developer for the property that is contained within the same Planned Unit Development, until the nuisance is abated. This shall include, but not be limited to, acceptance of applications, sending referrals, scheduling meetings or hearings, or conducting reviews of projects.

Appears in 1 contract

Samples: Subdivision Agreement

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat Final Plat in the real estate records of Xxxxxxx County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s 's expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat Final Plat by the Town is contingent upon the Developer’s 's provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s 's approval of the final platplatFinal Plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot over lot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s 's Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works' estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Director of Engineering/Town Public WorksWorks Director, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-two- year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement

Performance Guarantee. In order to secure the construction and installation of the Public Improvements, the Developer shall, prior to recording the final plat in the real estate records of Xxxxxxx Douglas County, which recording shall occur no later than ninety (90) days after the execution of this Agreement, furnish the Town, at the Developer’s expense, with the performance guarantee described herein. The performance guarantee provided by the Developer shall be an irrevocable letter of credit in which the Town is designated as beneficiary in an amount equal to one hundred ten percent (110%) of the estimated costs of the Public Improvements to be constructed and installed, as set forth in Exhibit C, to secure the performance and completion of the Public Improvements. The Developer agrees that approval of the final plat by the Town is contingent upon the Developer’s provision of an irrevocable letter of credit to the Town within ninety (90) days of the execution of this Agreement, in the amount and form provided herein. Failure of the Developer to provide an irrevocable letter of credit to the Town, in the manner provided herein, shall negate the Town’s approval of the final plat. Letters of credit shall be substantially in the form and content set forth in Exhibit D, attached hereto and incorporated herein, and shall be subject to the review and approval of the Town Attorney. The Developer shall not start the construction of any public or private improvement on the Property, including, but not limited to, staking, earth work, overlot grading or the erection of any structure, temporary or otherwise, until the Town has received and approved the irrevocable letter of credit. The estimated costs of the Public Improvements shall be a figure mutually agreed upon by the Developer and the Town’s Director of Engineering/Public Works, as set forth in Exhibit C. If, however, they are unable to agree, the Director of Engineering/Public Works’ estimate shall govern after giving consideration to information provided by the Developer, including, but not limited to, construction contracts and engineering estimates. The purpose of the cost estimate is solely to determine the amount of security. No representations are made as to the accuracy of these estimates and the Developer agrees to pay the actual costs of all such Public Improvements. The estimated costs of the Public Improvements may increase in the future. Accordingly, the Town reserves the right to review and adjust the cost estimates on an annual basis. Adjusted cost estimates will be made according to changes in the Construction Costs Index, as published by the Engineering News Record. If the Town adjusts the cost estimate for the Public Improvements, the Town shall give written notice to the Developer. The Developer shall, within thirty (30) days after receipt of said written notice, provide the Town with a new or amended letter of credit in the amount of the adjusted cost estimates. If the Developer refuses or fails to so provide the Town with a new or amended letter of credit, the Town may exercise the remedies provided for in Paragraph 6 of this Agreement; provided, however, that prior to increasing the amount of additional security required, the Town shall give credit to the Developer for all required Public Improvements which have actually been completed so that the amount of security required at any time shall relate to the cost of required Public Improvements not yet constructed. In the event the Public Improvements are not constructed or completed within the period of time specified by Paragraph 9 of this Agreement or a written extension of time mutually agreed upon by the parties to this Agreement, the Town may draw on the letter of credit to complete the Public Improvements called for in this Agreement. In the event the letter of credit is to expire within fourteen (14) calendar days and the Developer has not yet provided a satisfactory replacement, the Town may draw on the letter of credit and either hold such funds as security for performance of this Agreement or spend such funds to finish the Public Improvements or correct problems with the Public Improvements, as the Town deems appropriate. Upon completion of performance of such improvements, conditions and requirements within the required time and the approval of the Town’s Director of Engineering/Public Works, the Developer shall issue an irrevocable letter of credit to the Town in the amount of twenty percent (20%) of the total cost of construction and installation of the Public Improvements, to be held by the Town during the two-year warranty period. If the Public Improvements are not completed within the required time, the monies may be used to complete the improvements.

Appears in 1 contract

Samples: Subdivision Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!