Patching Mortar Sample Clauses

Patching Mortar. Mix dry-pack patching mortar, consisting of 1 part portland cement to 2-1/2 parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing.
AutoNDA by SimpleDocs
Patching Mortar. E19.6.1 The patching mortar shall be made of the same cementitious material and of approximately the same proportions as used for the concrete, except that the coarse aggregate shall be omitted and the mortar shall consist of not more than one (1) part cement to two (2) parts sand by damp loose volume. White Portland Cement shall be substituted for a part of the grey Portland Cement on exposed concrete in order to produce a colour matching the colour of the surrounding concrete, as determined by a trial patch. The quantity of mixing water shall be no more than necessary for handling and placing.
Patching Mortar. Section 601.2(c)

Related to Patching Mortar

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Tandem Transit Traffic 12.1 As used in this Section, Tandem Transit Traffic is Telephone Exchange Service traffic that originates on CBB's network, and is transported through Verizon’s Tandem to the subtending End Office or its equivalent of another carrier (CLEC, ILEC other than Verizon, Commercial Mobile Radio Service (CMRS) carrier, or other LEC (“Other Carrier”). Neither the originating nor terminating customer is a Customer of Verizon. Subtending End Offices shall be determined in accordance with and as identified in the Local Exchange Routing Guide (LERG). Switched Exchange Access Service traffic is not Tandem Transit Traffic.

  • Leadwork Differential (a) Leadwork differential shall be defined as a differential for employees who have been formally assigned by their supervisor in writing, “leadwork” duties for ten (10) consecutive calendar days (or the equivalent thereof for alternate or flexible schedules) or longer provided the leadwork or team leader duties are not included in the classification specification for the employee’s position. Leadwork is where, on a recurring daily basis, the employee has been directed to perform substantially all of the following functions: to orient new employees, if appropriate; assign and reassign tasks to accomplish prescribed work efficiently; give direction to workers concerning work procedures; transmit established standards of performance to workers; review work of employees for conformance to standards; and provide informal assessment of workers’ performance to the supervisor.

  • Teaching Load Full teaching assignments shall normally include 12 course credit hours of scheduled teaching per academic quarter. A reassignment of duty, for the equivalent of 3 or 4 credit course, shall be provided during one term of the first academic year to all newly hired tenure track faculty to further their teaching, scholarship and service and to encourage faculty retention. Wherever possible the University will endeavor to arrange teaching schedules that avoid excessive numbers of preparations and recognize evening and/or off-campus assignments. Class sizes will be established and monitored by the appropriate academic xxxx in consultation with division chairs and affected faculty each term. The following equivalencies will be used in determining teaching assignments:

  • Lunch Breaks The lunch break will consist of a one-half hour (or one hour where scheduled) unpaid break taken mid-way during regular work day. In the event that an employee is required to work during his regular lunch period he shall be allowed a one-half hour lunch period between the hours of ll:30 a.m. and l:00 p.m., otherwise he shall be paid double time for working through said lunch period.

  • Grades of Service The Parties shall initially engineer and shall monitor and augment all trunk groups consistent with the Joint Process as set forth in Section 14.1 of this Attachment.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Shiftwork 38.1 Shift Penalties (Excluding Home Care Classifications)

  • Elements Unsatisfactory Needs Improvement Proficient Exemplary IV-A-1. Reflective Practice Demonstrates limited reflection on practice and/or use of insights gained to improve practice. May reflect on the effectiveness of lessons/ units and interactions with students but not with colleagues and/or rarely uses insights to improve practice. Regularly reflects on the effectiveness of lessons, units, and interactions with students, both individually and with colleagues, and uses insights gained to improve practice and student learning. Regularly reflects on the effectiveness of lessons, units, and interactions with students, both individually and with colleagues; and uses and shares with colleagues, insights gained to improve practice and student learning. Is able to model this element.

Time is Money Join Law Insider Premium to draft better contracts faster.