Outrigger Pads and Floats Sample Clauses

Outrigger Pads and Floats. Cranes with outriggers shall ensure that all outriggers are fully deployed, in contact with sound surface and maintain crane in level position. Outriggers must be set to remove equipment weight from the wheels. Outrigger and stabilizer blocking must be placed under the float/pad of the jack. Blocking must also be sufficient to sustain the loads and maintain stability and must be properly placed. Monolithic floats/supplemental pads shall be larger than the outrigger pads, of substantial material to withstand imposed loads and will be required under each outrigger pad regardless of the type of surface being set up on.
AutoNDA by SimpleDocs

Related to Outrigger Pads and Floats

  • FUND TRANSFER FACILITIES VIA TBS The Account Holder may apply, in accordance with the Bank’s prescribed procedure then prevailing and the Bank may, in its reasonable discretion, permit the Account Holder to operate such fund transfer facilities via the TBS, including without limitation, GIRO or direct debit banking system as may be made available by the Bank from time to time. The Account Holder acknowledges that the operation of such fund transfer facilities shall be subject to the relevant terms and conditions governing such facilities.

  • wire Unbundled ISDN Digital Loops These will be provisioned according to industry standards for 2-Wire Basic Rate ISDN services and will come standard with a test point, OC, and a DLR. NewPhone will be responsible for providing BellSouth with a Service Profile Identifier (SPID) associated with a particular ISDN-capable Loop and customer. With the SPID, BellSouth will be able to adequately test the circuit and ensure that it properly supports ISDN service.

  • Maintenance during Construction Period (i) During the Construction Period, the Contractor shall maintain, at its cost, the existing lane(s) of the Project Highway so that the traffic worthiness and safety thereof are at no time materially inferior as compared to their condition on Appointed Date, and shall undertake the necessary repair and maintenance works for this purpose; provided that the Contractor may, at its cost, interrupt and divert the flow of traffic if such interruption and diversion is necessary for the efficient progress of Works and conforms to Good Industry Practice; provided further that such interruption and diversion shall be undertaken by the Contractor only with the prior written approval of the Authority’s Engineer which approval shall not be unreasonably withheld. For the avoidance of doubt, it is agreed that the Contractor shall at all times be responsible for ensuring safe operation of the Project Highway. It is further agreed that in the event the Project includes construction of a bypass or tunnel and realignment of the existing carriageway, the Contractor shall maintain the existing highway in such sections until the new Works are open to traffic.

  • Unbundled Loop Concentration (ULC) System 2.5.1 BellSouth will provide to <<customer_name>> Unbundled Loop Concentration (ULC). Loop concentration systems in the central office concentrate the signals transmitted over local loops onto a digital loop carrier system. The concentration device is placed inside a BellSouth central office. BellSouth will offer ULC with a TR008 interface or a TR303 interface.

  • Availability Control Personal Data will be protected against accidental or unauthorized destruction or loss. Measures: • SAP employs regular backup processes to provide restoration of business-critical systems as and when necessary. • SAP uses uninterrupted power supplies (for example: UPS, batteries, generators, etc.) to protect power availability to the Data Centers. • SAP has defined business contingency plans for business-critical processes and may offer disaster recovery strategies for business critical Services as further set out in the Documentation or incorporated into the Order Form for the relevant Cloud Service. • Emergency processes and systems are regularly tested.

  • Wire Unbundled DS1 Digital Loop This is a designed 4-wire Loop that is provisioned according to industry standards for DS1 or Primary Rate ISDN services and will come standard with a test point, OC, and a DLR. A DS1 Loop may be provisioned over a variety of loop transmission technologies including copper, HDSL-based technology or fiber optic transport systems. It will include a 4-Wire DS1 Network Interface at the End User’s location.

  • Technical Security Controls 35 a. Workstation/Laptop encryption. All workstations and laptops that store PHI COUNTY 36 discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of 37 COUNTY either directly or temporarily must be encrypted using a FIPS 140-2 certified algorithm which 1 is 128bit or higher, such as AES. The encryption solution must be full disk unless approved by the 2 COUNTY.

  • Account Monitoring Merchant acknowledges that Servicer will monitor Merchant’s daily deposit activity. Servicer may upon reasonable grounds suspend disbursement of Merchant's funds for any reasonable period of time required to investigate suspicious or unusual deposit activity. Servicer will make good faith efforts to notify Merchant promptly following suspension. Servicer is not liable to Merchant for any loss, either direct or indirect, which Merchant may attribute to any suspension of funds disbursement.

  • MEASURING EQUIPMENT 1. Seller will maintain and operate, at its own, expense and at the point of delivery of gas hereunder, a meter or meters and other necessary equipment by which the volume of gas delivered hereunder shall be measured. Such meters and equipment shall remain the property of the Seller.

  • Data Integrity Control Personal Data will remain intact, complete and current during processing activities.

Time is Money Join Law Insider Premium to draft better contracts faster.