Operational Match Clause Samples

Operational Match. The Employer, to facilitate the Plan Administrator's correction of ACP test failures under Section 4.10(C), (or to lessen the degree of such failures), but only if the Plan is using Current Year Testing, may make Flexible Discretionary Match to the Plan ("Operational Match"), irrespective of whether the Employer in its Adoption Agreement has elected to provide for Flexible Discretionary Match. The Employer will provide to the Plan Administrator at the time of contribution written instructions for the allocation of the Operational Match. Allocation of any Operational Match will be limited to some or all NHCEs who are ACP Participants under Sections 4.11(A). The Operational Match may not be allocated in a manner to exceed the targeting limitations of Section 4.10(D). The Employer may allocate an Operational Match to any such NHCE Participants who are eligible to make (and who actually make) Elective Deferrals or Employee Contributions even if such Participants have not satisfied any eligibility conditions under Article II applicable to Matching Contributions or have not satisfied any allocation conditions under Section 3.06 applicable to Matching Contributions. Where the Plan Administrator disaggregates the Plan for coverage and for nondiscrimination testing under the "otherwise excludible employees" rule described in Section 4.06(C), the Employer also may limit the Operational Match allocation to those NHCEs in any disaggregated plan which actually is subject to ADP and ACP testing (because there are HCEs in that disaggregated plan). The Operational Match is subject to the instruction and notice provisions of Section 3.03(A)(2)(c).

Related to Operational Match

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Safety Objectives 55.1 The Parties recognise the potentially hazardous nature of the construction industry. To this end, the Parties to the Agreement are committed to continuous improvement in occupational health and safety standards through the implementation of an organisational framework which involves all Parties in protecting Employees’ health and safety. 55.2 In meeting these objectives, the Parties have agreed to consider a broad agenda through the consultative processes established by this Agreement. Such an agenda will include: (a) measures designed to include the safe operation of plant and equipment; (b) training issues including specific hazards, health and safety systems, and site induction; (c) management of occupational health and safety through a comprehensive approach which aims to control hazards at their source, reduce the incidence and costs of occupational injuries and illnesses; and (d) risk of fatigue (see clauses 38.5 and 38.6). 55.3 The Employer will comply with all relevant work health and safety legislation, including the OHS Act, workers compensation legislation, regulations, codes of practice and relevant and appropriate Australian and Industry Standards produced or recognised by WorkSafe Victoria.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority 3.2 The Authority may from time to time make changes to the KPIs measured as set out in paragraph 3.1 above and shall issue a replacement version to the Supplier. The Authority shall give notice In Writing of any such change to the KPIs measured and shall specify the date from which the replacement KPIs must be used for future reports. Such date shall be at least thirty (30) calendar days following the date of the notice to the Supplier.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.