NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): [Name and address] Notice to Construction Manager: [Name and address] With copies to: File [Name and address] *Persons signing for Construction Manager hereby swear and affirm that they are authorized to act on Construction Manager’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. THE CONSTRUCTION MANAGER: STATE OF COLORADO, acting by and through: REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS By: Legal Name of Contracting Entity ▇▇▇▇ ▇▇▇▇▇, P.E., Principal Representative Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By: STATE BUILDINGS PROGRAM State Architect (or authorized Delegate) Date: Name (print) Title By: ▇▇▇▇▇▇▇ ▇▇▇, R.A., Delegee Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized Delegate) By: ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ or ▇▇▇ ▇▇▇▇▇, Legal Counsel Date: C.R.S. § ▇▇-▇▇-▇▇▇ requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Construction Manager is not authorized to begin performance until such time. If Construction Manager begins performing prior thereto, the State of Colorado is not obligated to pay Construction Manager for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER’S OFFICE State Controller (or authorized Delegate) By: ▇▇▇▇▇▇▇ ▇▇▇▇, Delegee Date: ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (Attached) PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X ▇▇▇▇▇▇ AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (SEE PARAGRAPH 3.5.9) X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) I hereby certify: That I am the ______________________________________ and duly authorized representative of the firm of: and That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services and other services are accurate, complete, and current; and That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and That all such contract adjustments shall be made within one year following the end of this contract. CONSTRUCTION MANAGER Signature STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (attached) CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) D.1 Construction Manager’s Fee Proposal D.2 Certificate and Affidavit Regarding Unauthorized Immigrants D.3 Construction Manager’s Certificate of Liability Insurance ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the Principal Representative and prior to bidding) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS H.1 Guaranteed Maximum Price Documents, Drawings, and Specifications including Addenda and Modifications (when approved by the Principal Representative) H.2 Schedule of Bid Package Descriptions and Issuance Dates H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS I.1 Contract Document Drawings and Specifications (when approved by the Principal Representative) I.2 All Addenda and Modifications I.3 Schedule of Values (consistent with GMP Schedule of Values), include Labor Overhead (direct labor burdens) for each Subcontractor to be applied to all change orders and amendments; I.4 Allowance Schedule (consistent with GMP Allowance Schedule)
Appears in 1 contract
NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): [Name and address] Notice to Construction ManagerContractor: [Name and address] With copies to: File [Name and address] *Persons signing for Construction Manager Contractor hereby swear and affirm that they are authorized to act on Construction ManagerContractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. accepted THE CONSTRUCTION MANAGER: CONTRACTOR STATE OF COLORADO, acting by and through: REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS (Insert Name of Agency or IHE) By: Legal Name of Contracting Entity ▇▇▇▇ ▇▇▇▇▇, P.E., (Insert Name & Title of Principal Representative for Agency or IHE) Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By: By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: Name (print) Title By: ▇▇▇▇▇▇▇ ▇▇▇, R.A., Delegee Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized DelegateInsert Name of Authorized Individual) By: ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ or ▇▇▇ ▇▇▇▇▇, Legal Counsel Date: C.R.S. § ▇▇-▇▇-▇▇▇ requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Construction Manager Contractor is not authorized to begin performance until such time. If Construction Manager Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Construction Manager Contactor for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER’S OFFICE 'S OFFIC E State Controller (or authorized Delegate) By: ▇▇▇▇▇▇▇ ▇▇▇▇, Delegee Date: ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT STATE OF COLORADO (STATE FORM SC-6.5SC-6.21) CONTRACTOR’S BID (AttachedForm SBP-6.13) PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X ▇▇▇▇▇▇ AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (SEE PARAGRAPH 3.5.9) X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary STATE OF COLORADO CONSTRUCTION MANAGERCOLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS BID Institution/GENERAL CONTRACTOR Agency: Project No./Name: Bidder Acknowledges Receipt of Addenda Numbers: Bidder Anticipates Services outside the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid $ (CM/GCRefer to Bid Alternate Form SC-6.13.1 Attached, If Applicable) AGREEMENT Bidder’s Time of Completion
a. Time Period from Notice to Proceed to Substantial Completion:
b. Time Period from Substantial Completion to Final Acceptance:
c. Total Time of Completion of Entire Project (STATE FORM SC-6.5) I hereby certifya + b):
1. BID: That I am Pursuant to the ______________________________________ and duly authorized representative of the firm of: and That the wage rates and other factual unit costs supporting the compensation to be paid advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for these professional services the complete and other services are accurate, complete, and current; and That I understand prompt execution of everything described or shown in or reasonably implied from the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and That all such contract adjustments shall be made within one year following the end of this contract. CONSTRUCTION MANAGER Signature STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (attached) CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5)
D.1 Construction Manager’s Fee Proposal D.2 Certificate and Affidavit Regarding Unauthorized Immigrants D.3 Construction Manager’s Certificate of Liability Insurance ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the Principal Representative and prior to bidding) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS
H.1 Guaranteed Maximum Price Bidding Documents, Drawings, and Specifications including Addenda and Modifications (when approved by the Principal Representative)
H.2 Schedule of Bid Package Descriptions and Issuance Dates
H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS
I.1 Contract Document Drawings and Specifications (when approved by Specifications, for the Principal Representative) I.2 All Addenda work and Modifications
I.3 Schedule of Values (consistent with GMP Schedule of Values), for the base bid indicated above. Bidders should include Labor Overhead (direct labor burdens) for each Subcontractor to be applied to all change orders and amendments;
I.4 Allowance Schedule (consistent with GMP Allowance Schedule)taxes that are applicable.
Appears in 1 contract
NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: [Name and address] ▇▇▇▇ ▇▇▇▇▇, P.E._ With copies to (State Buildings Program (or Delegate) State of Colorado): [Name and address] ):
A. Notice to Construction ManagerContractor: [Name and address] ______________________ With copies to: File [Name and address] ______________________ ______________________ SIGNATURE APPROVALS: *Persons signing for Construction Manager Contractor hereby swear and affirm that they are authorized to act on Construction ManagerContractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. accepted THE CONSTRUCTION MANAGER: CONTRACTOR STATE OF COLORADO, acting by and through: REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS (Insert Name & Title of Agency or IHE) By: Legal Name of Contracting Entity ▇▇▇▇ ▇▇▇▇▇, P.E., Principal Representative Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By: By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: Name (print) Title By: ▇▇▇▇▇▇▇ ▇▇▇, R.A.RA, Delegee Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized Delegate) By: ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ or ▇▇▇ ▇▇▇▇▇, Legal Counsel Date: C.R.S. § CRS §▇▇-▇▇-▇▇▇ requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Construction Manager Contractor is not authorized to begin performance until such time. If Construction Manager Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Construction Manager Contactor for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER’S 'S OFFICE State Controller (or authorized Delegate) By: ▇▇▇▇▇▇▇ ▇▇▇▇, Delegee Date: ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-6.21) CONTRACTOR’S BID (AttachedForm SBP-6.13) PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X ▇▇▇▇▇▇ AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (SEE PARAGRAPH 3.5.9) X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-6.21) I hereby certify: That I am the ______________________________________ and duly authorized representative of the firm of: and That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services and other services are accurate, complete, and current; and That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and That all such contract adjustments shall be made within one year following the end of this contract. CONSTRUCTION MANAGER Signature STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR PERFORMANCE BOND (CM/GCForm SC-6.22) AGREEMENT (STATE FORM SC-6.5SC-6.21) LABOR AND MATERIAL PAYMENT BOND (Form SC-6.221) (STATE FORM SC-6.21) INSURANCE CERTIFICATE(S) (attached) CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5)
D.1 Construction Manager’s Fee Proposal D.2 Certificate SC-6.21) Certification and Affidavit Regarding Unauthorized Immigrants D.3 Construction Manager’s Certificate of Liability Insurance ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GCState Form UI-1), (required at contract signing prior to commencing work) AGREEMENT (STATE FORM SC-6.5SC-6.21) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-6.21) (when approved by The Contractor shall obtain and maintain, at its own expense and for the duration of the contract including any warranty periods under the Contract are satisfied, the insurance coverages set forth below. By requiring such insurance, the Principal Representative and prior shall not be deemed or construed to bidding) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved have assessed the risk that may be applicable to the Contractor its agents, representatives, employees or subcontractors under this contract. The insurance requirements herein for this Contract in no way limit the indemnity covenants contained in the Contract. The Principal Representative in no way warrants that the limits contained herein are sufficient to protect the Contractor from liabilities that might arise out of the performance of the work under this Contract by the Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS
H.1 Guaranteed Maximum Price DocumentsContractor, Drawingsits agents, representatives, employees, or subcontractors. The Contractor shall assess its own risks and Specifications including Addenda and Modifications (when approved if it deems appropriate and/or prudent, maintain higher limits and/or broader coverages. The Contractor is not relieved of any liability or other obligations assumed or pursuant to the Contract by the Principal Representative)
H.2 Schedule reason of Bid Package Descriptions and Issuance Dates
H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS
I.1 Contract Document Drawings and Specifications (when approved by the Principal Representative) I.2 All Addenda and Modifications
I.3 Schedule of Values (consistent with GMP Schedule of Values)its failure to obtain or maintain insurance in sufficient amounts, include Labor Overhead (direct labor burdens) for each Subcontractor to be applied to all change orders and amendments;
I.4 Allowance Schedule (consistent with GMP Allowance Schedule)duration, or types.
Appears in 1 contract
NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): [Name and address] Notice to Construction Manager: [Name and address] With copies to: File [Name and address] *Persons signing for Construction Manager hereby swear and affirm that they are authorized to act on Construction Manager’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. THE CONSTRUCTION MANAGER: STATE OF COLORADO, acting by and through: REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS By: Legal Name of Contracting Entity ▇▇▇▇ ▇▇▇▇▇, P.E., Principal Representative Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By: STATE BUILDINGS PROGRAM State Architect (or authorized Delegate) Date: Name (print) Title By: ▇▇▇▇▇▇▇ ▇▇▇, R.A., Delegee Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized Delegate) By: ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ or ▇▇▇ ▇▇▇▇▇, Legal Counsel Date: C.R.S. § ▇▇-▇▇-▇▇▇ requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Construction Manager is not authorized to begin performance until such time. If Construction Manager begins performing prior thereto, the State of Colorado is not obligated to pay Construction Manager for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER’S OFFICE State Controller (or authorized Delegate) By: ▇▇▇▇▇▇▇ ▇▇▇▇, Delegee Date: ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (Attached) SC-6.5 Rev. 7/2020 PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-SUB- CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-SUB- CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X ▇▇▇▇▇▇ AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (SEE PARAGRAPH 3.5.9) X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-SUBSTRUCTURE- OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) I hereby certify: :
a. That I am the ______________________________________ and duly authorized representative of the firm of: and :
b. That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services and other services are accurate, complete, and current; and and
c. That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and and
d. That all such contract adjustments shall be made within one year following the end of this contract. CONSTRUCTION MANAGER Signature OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM EXHIBIT C REQUEST FOR PROPOSAL STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM EXHIBIT D CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (attached) CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5)’S FEE PROPOSAL
D.1 Construction Manager’s Fee Proposal D.2 Certificate and Affidavit Regarding Unauthorized Immigrants D.3 Construction Manager’s Certificate of Liability Insurance ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the Principal Representative and prior to bidding) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS
H.1 Guaranteed Maximum Price Documents, Drawings, and Specifications including Addenda and Modifications (when approved by the Principal Representative)
H.2 Schedule of Bid Package Descriptions and Issuance Dates
H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS
I.1 Contract Document Drawings and Specifications (when approved by the Principal Representative) I.2 All Addenda and Modifications
I.3 Schedule of Values (consistent with GMP Schedule of Values), include Labor Overhead (direct labor burdens) for each Subcontractor to be applied to all change orders and amendments;
I.4 Allowance Schedule (consistent with GMP Allowance Schedule)Immigrants
Appears in 1 contract
NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): [Name and address] Notice to Construction ManagerDesign/Build Entity: [Name and address] With copies to: File [Name and address] *Persons signing for Construction Manager Design/Build Entity hereby swear and affirm that they are authorized to act on Construction ManagerDesign/Build Entity’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. THE CONSTRUCTION MANAGERDESIGN/BUILD ENTITY: STATE OF COLORADO, acting by and through: REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS (Insert Name & Title of Agency or IHE) By: Legal Name of Contracting Entity ▇▇▇▇ ▇▇▇▇▇, P.E., (Insert Name & Title of Principal Representative for Agency or IHE) Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By: STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: Name (print) Title By: ▇▇▇▇▇▇▇ ▇▇▇, R.A., Delegee (Insert Name of Authorized Individual) Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized Delegate) By: ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ or ▇▇▇ ▇▇▇▇▇, Legal Counsel (Insert Name of Authorized Individual) Date: C.R.S. § ▇▇-▇▇-▇▇▇ requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Construction Manager Design/Build Entity is not authorized to begin performance until such time. If Construction Manager Design/Build Entity begins performing prior thereto, the State of Colorado is not obligated to pay Construction Manager Design/Build Entity for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER’S 'S OFFICE State Controller (or authorized Delegate) By: ▇▇▇▇▇▇▇ ▇▇▇▇, Delegee (Insert Name of Authorized Individual) Date: ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-8.0) (Attached) PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X ▇▇▇▇▇▇ AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (SEE PARAGRAPH 3.5.9) X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-8.0) I hereby certify: That I am the ______________________________________ and duly authorized representative of the firm of: and That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services and other services are accurate, complete, and current; and That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and That all such contract adjustments shall be made within one year following the end of this contract. CONSTRUCTION MANAGER Signature STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-8.0) (attached) CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5)
D.1 Construction Manager’s Fee Proposal D.2 Certificate and Affidavit Regarding Unauthorized Immigrants D.3 Construction Manager’s Certificate of Liability Insurance ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GCSC-8.0) AGREEMENT (STATE FORM SC-6.5SC-8.0) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (OFFICE OF THE STATE FORM SC-6.5) (when approved by ARCHITECT STATE BUILDINGS PROGRAM PERFORMANCE BOND That the Contractor as Principal Representative and prior to bidding) hereinafter called “Principal,” and as Surety and hereinafter called “Surety,” a corporation organized and existing under the laws of are held and firmly bound unto the STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR acting by and through (CM/GCAGENCY OR INSTITUTION) AGREEMENT hereinafter called the “Principal Representative”, in the sum of Dollars (STATE FORM SC-6.5$ ) (when approved by for the payment whereof the Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS
H.1 Guaranteed Maximum Price Documentsand Surety bind themselves, Drawingstheir heirs, executors, administrators, successors and Specifications including Addenda assigns, jointly and Modifications (when approved severally, firmly, by the Principal Representative)
H.2 Schedule of Bid Package Descriptions and Issuance Dates
H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS
I.1 Contract Document Drawings and Specifications (when approved by the Principal Representative) I.2 All Addenda and Modifications
I.3 Schedule of Values (consistent with GMP Schedule of Values), include Labor Overhead (direct labor burdens) for each Subcontractor to be applied to all change orders and amendments;
I.4 Allowance Schedule (consistent with GMP Allowance Schedule)these presents.
Appears in 1 contract
Sources: Design/Build Lump Sum Agreement
NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): [Name and address] : Notice to Construction ManagerContractor: [Name and address] With copies to: File [Name and address] *Persons signing for Construction Manager Contractor hereby swear and affirm that they are authorized to act on Construction ManagerContractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. THE CONSTRUCTION MANAGER: STATE OF COLORADO, acting by and through: REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS accepted By: Legal Name of Contracting Entity ▇▇▇▇ ▇▇▇▇▇, P.E., (Insert Name & Title of Principal Representative for Agency or IHE) Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By: By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: Name (print) Title By: ▇▇▇▇▇▇▇ ▇▇▇, R.A., Delegee Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized Delegate) By: ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ or ▇▇▇ ▇▇▇▇▇, Legal Counsel Date: C.R.S. § ▇▇-▇▇-▇▇▇ requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Construction Manager Contractor is not authorized to begin performance until such time. If Construction Manager Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Construction Manager Contactor for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER’S 'S OFFICE State Controller (or authorized Delegate) By: ▇▇▇▇▇▇▇ ▇▇▇▇, Delegee Date: ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-6.21) (Attached) PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X ▇▇▇▇▇▇ AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (SEE PARAGRAPH 3.5.9) X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) I hereby certify: That I am the ______________________________________ and duly authorized representative of the firm of: and That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services and other services are accurate, complete, and current; and That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and That all such contract adjustments shall be made within one year following the end of this contract. CONSTRUCTION MANAGER Signature STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (attached) CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5)
D.1 Construction Manager’s Fee Proposal D.2 Certificate and Affidavit Regarding Unauthorized Immigrants D.3 Construction Manager’s Certificate of Liability Insurance ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-6.21) STATE OF COLORADO CONSTRUCTION MANAGEROFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS Institution/GENERAL CONTRACTOR (CMAgency: Colorado Mesa University/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by GZA Project No./Name: That the Contractor as Principal Representative and prior to bidding) hereinafter called “Principal,” and as Surety and hereinafter called “Surety,” a corporation organized and existing under the laws of are held and firmly bound unto the STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR acting by and through (CM/GCAGENCY OR INSTITUTION) AGREEMENT hereinafter called the “Principal Representative”, in the sum of Dollars (STATE FORM SC-6.5$ ) (when approved by for the payment whereof the Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS
H.1 Guaranteed Maximum Price Documentsand Surety bind themselves, Drawingstheir heirs, executors, administrators, successors and Specifications including Addenda assigns, jointly and Modifications (when approved severally, firmly, by the Principal Representative)
H.2 Schedule of Bid Package Descriptions and Issuance Dates
H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS
I.1 Contract Document Drawings and Specifications (when approved by the Principal Representative) I.2 All Addenda and Modifications
I.3 Schedule of Values (consistent with GMP Schedule of Values), include Labor Overhead (direct labor burdens) for each Subcontractor to be applied to all change orders and amendments;
I.4 Allowance Schedule (consistent with GMP Allowance Schedule)these presents.
Appears in 1 contract
NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): [Name and address] : Notice to Construction ManagerContractor: [Name and address] With copies to: File [Name and address] SC-6.21 Rev. 10/2021 Page 4 of 5 SIGNATURE APPROVALS: THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT *Persons signing for Construction Manager Contractor hereby swear and affirm that they are authorized to act on Construction ManagerContractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. accepted THE CONSTRUCTION MANAGER: CONTRACTOR STATE OF COLORADO, acting by and through: REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS By: Legal Name of Contracting Entity ▇▇▇▇ ▇▇▇▇▇▇▇▇, P.E.Interim Vice Chancellor, Admin & Finance, Principal Representative Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By: By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: Name (print) Title By: ▇▇▇▇▇▇▇ ▇▇▇, R.A.▇.▇., Delegee Date: ALL CONTRACTS MUST BE APPROVED DEPARTMENT OF LAW Attorney General (or authorized Delegate) By: ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ or ▇▇▇ ▇▇▇▇▇, Legal Counsel DateBY THE STATE CONTROLLER: C.R.S. § ▇▇-▇▇-▇▇▇ requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Construction Manager Contractor is not authorized to begin performance until such time. If Construction Manager Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Construction Manager Contactor for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER’S 'S OFFICE State Controller (or authorized Delegate) By: ▇▇▇▇▇▇▇ ▇▇▇▇, Delegee Date: SC-6.21 Rev. 10/2021 Page 5 of 5 STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT (STATE FORM SC-6.21) EXHIBIT A CONTRACTOR’S BID (Form SBP-6.13) and Labor Burden (Form SBP-6.18) STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT (STATE FORM SC-6.21) EXHIBIT B PERFORMANCE BOND (Form SC-6.22) STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT (STATE FORM SC-6.21) EXHIBIT C LABOR AND MATERIAL PAYMENT BOND (Form SC-6.221) STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT (STATE FORM SC-6.21) EXHIBIT D INSURANCE CERTIFICATE(S) (attached) STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT (STATE FORM SC-6.21) EXHIBIT F Building Code Compliance Policy: Coordination of Approved Building Codes, Plan Reviews and Building Inspections Reference policy dated 7/2018 on the Office of the State Architect Website: ▇▇▇▇▇ ▇▇ ://▇▇▇.▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER▇.▇▇▇/state-buildings/GENERAL CONTRACTOR (CMbuilding-codes and the Approved State Building Codes dated 7/2022. STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/GC) BID/BUILD AGREEMENT (STATE FORM SC-6.5SC-6.21) (Attached) PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X ▇▇▇▇▇▇ AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (SEE PARAGRAPH 3.5.9) X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary EXHIBIT G State Sales and Use Tax Forms STATE OF COLORADO CONSTRUCTION MANAGEROFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/GENERAL CONTRACTOR (CMBID/GC) BUILD AGREEMENT (STATE FORM SC-6.5SC-6.21) I hereby certify: That I am the ______________________________________ and duly authorized representative of the firm of: and That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services and other services are accurate, complete, and current; and That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and That all such contract adjustments shall be made within one year following the end of this contract. CONSTRUCTION MANAGER Signature EXHIBIT H Applicable Prevailing Wage Determinations (If Applicable) STATE OF COLORADO CONSTRUCTION MANAGEROFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/GENERAL CONTRACTOR (CMBID/GC) BUILD AGREEMENT (STATE FORM SC-6.5SC-6.21) EXHIBIT I Apprenticeship Utilization Certifications (attachedIf Applicable) CONSTRUCTION MANAGERSTATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM CONTRACTOR'S DESIGN/GENERAL CONTRACTOR (CMBID/GC) BUILD AGREEMENT (STATE FORM SC-6.5SC-6.21) EXHIBIT J UNIVERSITY INSURANCE REQUIREMENTS - A INSURANCE REQUIREMENTS (A) This insert applies to the following State Contracts: General Conditions of the Construction Contract Design/Bid/Build (SC-6.23)
D.1 , or Contractors Agreement Design/Bid/Build (SC-6.21), or Standing Order Contractor, or Construction Manager’s Fee Proposal D.2 Certificate and Affidavit Regarding Unauthorized Immigrants D.3 /General Contractor CM/GC (SC-6.4), or Design/Build Entity (SC-8.0). Design/Build Guaranteed Max SC 9.0 For purposes of this supplement “Contractor” as used herein shall mean, as appropriate to the State Contract form being used, Contractor, Standing Order Contractor, Construction Manager’s Certificate /General Contractor, or Design/Build Entity. The Contractor shall obtain and maintain, at its own expense and for the duration of Liability Insurance ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the contract including any warranty periods under the Contract are satisfied, the insurance coverages set forth below. By requiring such insurance, the Principal Representative and prior shall not be deemed or construed to bidding) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved have assessed the risk that may be applicable to the Contractor its agents, representatives, employees or subcontractors under this contract. The insurance requirements herein for this Contract in no way limit the indemnity covenants contained in the Contract. The Principal Representative in no way warrants that the limits contained herein are sufficient to protect the Contractor from liabilities that might arise out of the performance of the work under this Contract by the Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS
H.1 Guaranteed Maximum Price DocumentsContractor, Drawingsits agents, representatives, employees, or subcontractors. The Contractor shall assess its own risks and Specifications including Addenda and Modifications (when approved if it deems appropriate and/or prudent, maintain higher limits and/or broader coverages. The Contractor is not relieved of any liability or other obligations assumed or pursuant to the Contract by the Principal Representative)
H.2 Schedule reason of Bid Package Descriptions and Issuance Dates
H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS
I.1 Contract Document Drawings and Specifications (when approved by the Principal Representative) I.2 All Addenda and Modifications
I.3 Schedule of Values (consistent with GMP Schedule of Values)its failure to obtain or maintain insurance in sufficient amounts, include Labor Overhead (direct labor burdens) for each Subcontractor to be applied to all change orders and amendments;
I.4 Allowance Schedule (consistent with GMP Allowance Schedule)duration, or types.
Appears in 1 contract
NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): [Name and address] : Notice to Construction ManagerContractor: [Name and address] With copies to: File [Name and address] *Persons signing for Construction Manager Contractor hereby swear and affirm that they are authorized to act on Construction ManagerContractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted. accepted THE CONSTRUCTION MANAGER: CONTRACTOR STATE OF COLORADO, acting by and through: REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS (Insert Name of Agency or IHE) By: Legal Name of Contracting Entity ▇▇▇▇ ▇▇▇▇▇, P.E., (Insert Name & Title of Principal Representative for Agency or IHE) Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By: By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: Name (print) Title By: ▇▇▇▇▇▇▇ ▇▇▇, R.A., Delegee Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized DelegateInsert Name of Authorized Individual) By: ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ or ▇▇▇ ▇▇▇▇▇, Legal Counsel Date: C.R.S. § ▇▇-▇▇-▇▇▇ requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Construction Manager Contractor is not authorized to begin performance until such time. If Construction Manager Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Construction Manager Contactor for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER’S 'S OFFICE State Controller (or authorized Delegate) By: ▇▇▇▇▇▇▇ ▇▇▇▇, Delegee (Insert Name & Title of Authorized Individual) Date: ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5SC-6.21) (AttachedSTATE FORM SC-6.21) PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST STATE OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X ▇▇▇▇▇▇ AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (SEE PARAGRAPH 3.5.9) X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PROGRAM PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary That the Contractor as Principal and hereinafter called “Principal,” and as Surety and hereinafter called “Surety,” a corporation organized and existing under the laws of are held and firmly bound unto the STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR acting by and through (CM/GCAGENCY OR INSTITUTION) AGREEMENT hereinafter called the “Principal Representative”, in the sum of Dollars (STATE FORM SC-6.5$ ) I hereby certify: That I am for the ______________________________________ and duly authorized representative of the firm of: and That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services and other services are accurate, complete, and current; and That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and That all such contract adjustments shall be made within one year following the end of this contract. CONSTRUCTION MANAGER Signature STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (attached) CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5)
D.1 Construction Manager’s Fee Proposal D.2 Certificate and Affidavit Regarding Unauthorized Immigrants D.3 Construction Manager’s Certificate of Liability Insurance ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by payment whereof the Principal Representative and prior to bidding) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly, by the Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS
H.1 Guaranteed Maximum Price Documents, Drawings, and Specifications including Addenda and Modifications (when approved by the Principal Representative)
H.2 Schedule of Bid Package Descriptions and Issuance Dates
H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS
I.1 Contract Document Drawings and Specifications (when approved by the Principal Representative) I.2 All Addenda and Modifications
I.3 Schedule of Values (consistent with GMP Schedule of Values), include Labor Overhead (direct labor burdens) for each Subcontractor to be applied to all change orders and amendments;
I.4 Allowance Schedule (consistent with GMP Allowance Schedule)these presents.
Appears in 1 contract