NON- MRS ITEMS. 1 Cutting of Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 690 Rft P. Rft 2 Replacement of leakage house connections 23 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (WS) EZ WASA BID SHEET Name of Work: PROVIDING / LAYING OF WATER SUPPLY PIPELINE 3" I/D IN FRONT OF AL NOOR MASJID, DHOKE XXXX XXXX UC-22 WASA RAWALPINDI. Estimated Cost Rs. 312,700/- Xxxxxxx Money 6254/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C 1:2:4 450.00 Cft P.% Cft 12312.95 55408 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 675.00 Cft P.%o Cft 8403.10 5672 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 300.00 Rft P. Rft 197.35 59205 4 Making connection for new watersupply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 Nos. Each 3276.90 6554 5 Providing / fixing of Cast iron specials of BSS Class B complete. 40.00 Kgs P. Kg 130.15 5206 6 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 540.00 Cft P.%o Cft 2798.40 1511 7 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 585.00 Cft P.%o Cft 10128.20 5925 8 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 112.50 Cft P.% Cft 27346.20 30764 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 148.50 Cft P.% Cft 36557.40 54288 MRS Item Total (A) Rs:- 224534 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: eproc.punjab.gov.pk

AutoNDA by SimpleDocs

NON- MRS ITEMS. 1 Cutting of Concrete PCC / asphalt road for the laying of water supply pipeline Asphalt Road with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respectmachine complete. 690 400.00 Rft P. Rft 2 Replacement of leakage house connections 23 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (WSS&D) EZ WASA BID SHEET Name of Work: PROVIDING / AND LAYING OF WATER SUPPLY PIPELINE 3" I/D IN FRONT SEWER LINE AT INFRONT OF AL NOOR MASJID, DHOKE SAINT XXXX XXXX UC-22 STREET UC 15 WASA RAWALPINDI. Estimated Cost Rs. 312,700/- 490,200/- Xxxxxxx Money 6254/- 9804/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C Cement Concrete 1:2:4 450.00 Plain 177.74 Cft P.% Per % Cft 12312.95 55408 21885 2 Excavation of trenches Dismantling Cement Concrete 1:4:8 Plain 134.65 Cft Per % Cft 6156.50 8290 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all kind types of soilsoil except shingle, except cutting rock for water supply pipeline upto 5ftgravel and rock:-up to 0 - 7' depth 2692.97 Cft Per %0 Cft 12926.85 34812 4 Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Depth Wall B, including carriage of pipe from ground level including trimming dressing sidesfactory to site of work, leveling the beds of lowering in trenches to correct grade alignment and grade, jointing with rubber ring cutting pits for joints pipes where necessary, testing, etc. complete in all respect. 675.00 Cft P.%o Cft 8403.10 5672 3 P/L., Testing and disinfecting the high density polyethene pipeline (PN-8), 3complete.12" i/d 300.00 178.50 Rft Per Rft 756.60 135053 5 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 177.74 Cft Per % Cft 27346.20 48605 6 Pacca brick work other than building in cement sand mortar (1:4) complete. 131.35 Cft Per % Cft 36297.85 47677 7 Cement plaster (1:4) 1/2" thick 158.64 Sft P. Rft 197.35 59205 4 Making connection for new watersupply lines with the running main% Sft 3518.30 5581 8 Cement concrete plain including placing, including excavation of trench compacting, finishing and refilling curing complete: (1:2:4) 283.72 Cft Per % Cft 36557.40 103721 9 Providing and fixing, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. 3.00 Nos. Each 3276.90 6554 5 Providing / fixing of Cast iron specials of BSS Class B complete. 40.00 Kgs P. Kg 130.15 5206 6 11224.95 33675 10 Rehandling of earthwork earth work lead upto a single throw of xxxxx (80% of excavation) 540.00 XXXXX, Phorah or xxxxxx. 2444.95 Cft P.%o Per %0 Cft 2798.40 1511 7 6842 11 Transportation of earth all types when the total distance distance, including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 585.00 work, Upto 15 Miles. 560.41 Cft P.%o Per %0 Cft 10128.20 5925 8 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 112.50 Cft P.% Cft 27346.20 30764 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 148.50 Cft P.% Cft 36557.40 54288 16257.20 9111 MRS Item Xxxx Total (A) Rs:- 224534 455251 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: eproc.punjab.gov.pk

NON- MRS ITEMS. 1 Cutting of Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 690 600 Rft P. Rft 2 Replacement connections of leakage house connections 23 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (WS) EZ WASA BID SHEET Name of Work: PROVIDING / LAYING OF 3" (90MM) 4" (110MM) WATER SUPPLY PIPELINE 3" I/D IN FRONT OF AL NOOR MASJIDAT COL. YOUSAF COLONY, DHOKE XXXX XXXX UC-22 AL-MUSLIM STREET UC 27, WASA RAWALPINDI. Estimated Cost Rs. 312,700/- 1,088,800/- Xxxxxxx Money 6254/- 21776/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C 1:2:4 450.00 1545.00 Cft P.% Cft 12312.95 55408 190235 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 675.00 1125.00 Cft P.%o Cft 8403.10 5672 9453 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 300.00 250.00 Rft P. Rft 197.35 59205 49338 4" i/d 780.00 Rft P. Rft 299.75 233805 4 Making connection for new watersupply lines with the running main, including excavation P/F of trench and refilling complete, but excluding cost sluice valve of pipe and specials, etcBSS Class B complete in all respect. Upto 64" dia 2.00 i/d 3.00 Nos. Each 3276.90 6554 20006.55 60020 5 Providing / fixing of Cast iron specials of BSS Class B complete. 40.00 293.50 Kgs P. Kg 130.15 5206 38199 6 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 540.00 900.00 Cft P.%o Cft 2798.40 1511 2798.26 2518 7 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 585.00 1770.00 Cft P.%o Cft 10128.20 5925 10128.32 17927 8 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 112.50 386.25 Cft P.% Cft 27346.20 30764 27346.24 105625 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 148.50 509.85 Cft P.% Cft 36557.40 54288 36558.82 186395 MRS Item Total (A) Rs:- 224534 893515 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: eproc.punjab.gov.pk

NON- MRS ITEMS. 1 Cutting of Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 690 620 Rft P. Rft 2 Replacement of leakage house connections 23 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (WS) EZ PP-13 WASA BID SHEET Name of Work: PROVIDING / LAYING REPLACEMENT OF WATER SUPPLY 2" PIPELINE INTO 3" I/D IN FRONT OF AL NOOR MASJID, DHOKE XXXX XXXX UC-22 PIPELINE AT STREET NO. 3&4 XXXXXX MARKET NEW XXXXXX X XXXXX UC 75 WASA RAWALPINDI. Estimated Cost Rs. 312,700/- 452,100/- Xxxxxxx Money 6254/- 9042/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C 1:2:4 450.00 483.75 Cft P.% Cft 12312.95 55408 11209.45 54226 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 675.00 1290.00 Cft P.%o Cft 8403.10 5672 7647.00 9865 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 300.00 430.00 Rft P. Rft 197.35 59205 196.10 84323 4 Making connection for new watersupply water supply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 4.00 Nos. Each 2976.60 11906 5 P/F of sluice valve of BSS Class B complete in all respect. 3" i/d 2.00 Nos. Each 3276.90 6554 5 16750.30 33501 6 Providing / fixing of Cast iron specials of BSS Class B complete. 40.00 160.00 Kgs P. Kg 130.15 5206 6 123.05 19688 7 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 540.00 1032.00 Cft P.%o Cft 2798.40 1511 7 2547.60 2629 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 585.00 741.75 Cft P.%o Cft 10128.20 5925 8 10244.40 7599 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 112.50 161.250 Cft P.% Cft 27346.20 30764 9 27697.40 44662 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 148.50 212.850 Cft P.% Cft 36557.40 54288 37004.60 78764 MRS Item Total (A) Rs:- 224534 347163 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: eproc.punjab.gov.pk

NON- MRS ITEMS. 1 Cutting of Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 690 2060 Rft P. Rft 2 Replacement connections of leakage house connections 23 34 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (WS) EZ WASA BID SHEET Name of Work: PROVIDING / LAYING /FIXING OF 3" (90MM) WATER SUPPLY PIPELINE 3" ILINE & P/D IN FRONT F OF AL NOOR MASJIDSLUICE VALVE AT MUSLIM TOWN, DHOKE XXXX XXXX UC-22 JINNAH STREET, TRANSFORMER CHOWK, UC 27 WASA RAWALPINDI. Estimated Cost Rs. 312,700/- 275,600/- Xxxxxxx Money 6254/- 5512/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C 1:2:4 450.00 360.00 Cft P.% Cft 12312.95 55408 11209.45 40354 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 675.00 720.00 Cft P.%o Cft 8403.10 5672 7647.00 5506 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 300.00 240.00 Rft P. Rft 197.35 59205 196.10 47064 4 Making connection for new watersupply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 Nos. Each 3276.90 6554 5 2976.60 5953 6 Providing / fixing of Cast iron specials of BSS Class B complete. 40.00 63.00 Kgs P. Kg 130.15 5206 6 123.05 7752 7 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 540.00 576.00 Cft P.%o Cft 2798.40 1511 7 2547.60 1467 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 585.00 504.00 Cft P.%o Cft 10128.20 5925 8 10244.40 5163 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 112.50 90.000 Cft P.% Cft 27346.20 30764 9 27697.40 24928 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 148.50 118.800 Cft P.% Cft 36557.40 54288 37004.60 43961 MRS Item Total (A) Rs:- 224534 198899 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: eproc.punjab.gov.pk

AutoNDA by SimpleDocs

NON- MRS ITEMS. 1 Cutting of Concrete PCC / asphalt road for the laying of water supply pipeline Asphalt Road with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respectmachine complete. 690 282.00 Rft P. Rft 2 Replacement of leakage house connections 23 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (WSS&D) EZ WASA BID SHEET Name of Work: PROVIDING / AND LAYING OF WATER SUPPLY PIPELINE 3" I/D IN FRONT OF AL NOOR MASJID, DHOKE XXXX XXXX UC-22 SEWER LINE AT F-BLOCK FROM F-290 TO F-294 F-BLOCK UC 13 WASA RAWALPINDI. Estimated Cost Rs. 312,700/- 475,700/- Xxxxxxx Money 6254/- 9514/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C Cement Concrete 1:2:4 450.00 Plain 317.32 Cft P.% Per % Cft 12312.95 55408 39071 2 Excavation of trenches Dismantling Cement Concrete 1:4:8 Plain 211.55 Cft Per % Cft 6156.50 13024 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all kind types of soilsoil except shingle, except cutting rock for water supply pipeline upto 5ftgravel and rock:-up to 0 - 7' depth 2221.24 Cft Per %0 Cft 12926.85 28714 4 Supply and filling of sand under floor and around the pipe i/c leveling, manual compaction, complete in all respct. Depth 93.84 Cft Per % Cft 3919.20 3678 5 Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from ground level including trimming dressing sidesfactory to site of work, leveling the beds of lowering in trenches to correct grade alignment and grade, jointing with rubber ring cutting pits for joints pipes where necessary, testing, etc. complete in all respect. 675.00 Cft P.%o Cft 8403.10 5672 3 P/L., Testing and disinfecting the high density polyethene pipeline (PN-8), 3complete.12" i/d 300.00 136.50 Rft Per Rft 756.60 103276 6 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 211.55 Cft Per % Cft 27346.20 57851 7 Pacca brick work other than building in cement sand mortar (1:4) complete. 162.87 Cft Per % Cft 36297.80 59118 8 Cement plaster (1:4) 1/2" thick 138.81 Sft P. Rft 197.35 59205 4 Making connection for new watersupply lines with the running main% Sft 3518.30 4884 9 Cement concrete plain including placing, including excavation of trench compacting, finishing and refilling curing complete: (1:2:4) 224.47 Cft Per % Cft 36557.40 82060 10 Providing and fixing, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. 3.00 Nos. Each 3276.90 6554 5 Providing / fixing of Cast iron specials of BSS Class B complete. 40.00 Kgs P. Kg 130.15 5206 6 11224.95 33675 11 Rehandling of earthwork earth work lead upto a single throw of xxxxx (80% of excavation) 540.00 XXXXX, Phorah or xxxxxx. 1937.74 Cft P.%o Per %0 Cft 2798.40 1511 7 5423 12 Transportation of earth all types when the total distance distance, including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 585.00 work, Upto 15 Miles. 812.37 Cft P.%o Per %0 Cft 10128.20 5925 8 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 112.50 Cft P.% Cft 27346.20 30764 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 148.50 Cft P.% Cft 36557.40 54288 16257.20 13207 MRS Item Xxxx Total (A) Rs:- 224534 443980 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: eproc.punjab.gov.pk

NON- MRS ITEMS. 1 Cutting of Concrete PCC / asphalt road for the laying of water supply pipeline Asphalt Road with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respectmachine complete. 690 280.00 Rft P. Rft 2 Replacement of leakage house connections 23 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. Contractor Dy. Director (WSS&D) EZ WASA BID SHEET Name of Work: PROVIDING / AND LAYING OF WATER SUPPLY PIPELINE 3" I/D SEWER LINE IN FRONT OF AL NOOR MASJIDMOHALLAH LANE NO. 13, DHOKE XXXX XXXX UC-22 SADIQ TOWN ADYALA ROAD UC XXXXX SYEDAN WASA RAWALPINDI. Estimated Cost Rs. 312,700/- 498700/- Xxxxxxx Money 6254/- 9974/- Time Limit 30 Days Name of Contractor S. No. Description of Items Qty. Unit Rate Amount A. MRS Xxxxx 1 Dismantling of P.C.C Cement Concrete 1:2:4 450.00 Plain 227.86 Cft P.% Per % Cft 12312.95 55408 11209.45 25542 2 Excavation of trenches Dismantling Cement Concrete 1:4:8 Plain 227.86 Cft Per % Cft 5604.70 12771 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all kind types of soilsoil except shingle, except cutting rock for water supply pipeline upto 5ftgravel and rock:-up to 0 - 7' depth 1754.52 Cft Per %0 Cft 11770.45 20651 4 Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Depth Wall B, including carriage of pipe from ground level including trimming dressing sidesfactory to site of work, leveling the beds of lowering in trenches to correct grade alignment and grade, jointing with rubber ring cutting pits for joints pipes where necessary, testing, etc. complete in all respect. 675.00 Cft P.%o Cft 8403.10 5672 3 P/L., Testing and disinfecting the high density polyethene pipeline (PN-8), 3complete.18" i/d 300.00 102.00 Rft Per Rft 1184.25 120794 5 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 227.86 Cft Per % Cft 27697.40 63111 6 Pacca brick work other than building in cement sand mortar (1:4) complete. 99.84 Cft Per % Cft 35561.90 35505 7 Cement plaster (1:4) 1/2" thick 104.84 Sft P. Rft 197.35 59205 4 Making connection for new watersupply lines with the running main% Sft 3289.75 3449 8 Cement concrete plain including placing, including excavation of trench compacting, finishing and refilling curing complete: (1:2:4) 325.72 Cft Per % Cft 37004.60 120531 9 Providing and fixing, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. 3.00 Nos. Each 3276.90 6554 5 Providing / fixing of Cast iron specials of BSS Class B complete. 40.00 Kgs P. Kg 130.15 5206 6 11087.75 33263 10 Rehandling of earthwork earth work lead upto a single throw of xxxxx (80% of excavation) 540.00 XXXXX, Phorah or xxxxxx. 1351.56 Cft P.%o Per %0 Cft 2798.40 1511 7 2547.60 3443 11 Transportation of earth all types when the total distance distance, including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 585.00 work, Upto 15 Miles. 858.68 Cft P.%o Per %0 Cft 10128.20 5925 8 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 112.50 Cft P.% Cft 27346.20 30764 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 148.50 Cft P.% Cft 36557.40 54288 16658.40 14304 MRS Item Xxxx Total (A) Rs:- 224534 453365 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: eproc.punjab.gov.pk

Time is Money Join Law Insider Premium to draft better contracts faster.