Nepal Component Sample Clauses

Nepal Component. Background and Objective Since 2014, UN-Habitat Regional Office for Asia and the Pacific (UN-Habitat ROAP) has been implementing the ‘Water for Life Nepal’ campaign, with the objective of improving the water quality and conditions of the traditional water reservoirs and river stretches in the Kathmandu Valley area on a long term. After the Nepal earthquake in April 2015, it was decided by the Board of Directors (of the Donor) that this project be shifted to ‘Emergency Assistance for Nepal’ and focus on relief and humanitarian support for the most affected communities. Additional cash donations collected from the local governments, partner private sector companies, and citizens groups were added to this project. This emergency component was called the ‘Emergency winterization project’ where durable iron stoves and foam mattresses were delivered to over 700 households. In this phase 2016-2017, the project will continue to address and improve water quality in various water bodies around Kathmandu area and additionally the Terai region which face even larger water related challenges by use of sustainable technology called ‘Aqualift’, which is a bacterial formula developed by Aquaservice Inc. in Fukuoka City. The technology is not only low-cost, it is low maintenance and easy to be treated and maintained by the communities in Nepal, and moreover it has proven to be safe and very effective in improvement of various water bodies including rivers, lakes, waste water treatment facilities, and septic tanks in Japan as well as Laos, Myanmar, Sri Lanka and other countries through UN-Habitat projects. The project will work with the local governments who will mobilize the schools and the communities to initiate water and sanitation awareness building and clean-up campaigns. ■Nepal Component Budget: USD15,000 (UN exchange rate $1@JPY104.50 as of July 2016) ■Implementation strategies and activities The project will be implemented jointly by UN-Habitat Nepal Office, CIUD (Center for Integrated Urban Development, local NGO), local governments and universities in Nepal, and by technical assistance from Aquaservice Inc., the producer of the bio formula. The implementation will cover Kathmandu and several other municipalities. ■Implementation period: 21 months from June 2016 to March 2018

Related to Nepal Component

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the ▇▇▇▇▇ Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/▇▇▇▇▇▇▇ KXM-550, GE Grid Solutions KOTEF ▇▇▇.▇▇, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.