Models module deployment Clause Samples

Models module deployment. The optimization problem defined for the cogeneration plant needs the prediction of the PV panels generated power. This will be the only prediction model included in the module that will be deployed in the same way that it
Models module deployment. There is not a specific Models module in the Oud-Heverlee deployment of the MUSE GRIDS Cloud. As discussed in the previous section the PV models for power prediction are substituted by the Belgian ▇▇▇ ▇▇▇▇ forecaster service. No other models devoted to prediction are needed in this demo to be integrated in the optimization problem. For the programming of the predictive and optimal control algorithm, also the battery model is needed. As explained in section 4.4 for the Osimo demo this simple model will be included in the control algorithm to define the so called boundary conditions of the optimization problem.

Related to Models module deployment

  • Deployment If the Tenant is deployed with a military unit for a period of not less than 90 days.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Software Development Software designs, prototypes, and all documentation for the final designs developed under this agreement must be made fully transferable upon direction of NSF. NSF may make the software design, prototype, and documentation for the final design available to competitors for review during any anticipated re-competition of the project.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.