Miscellaneous Materials Sample Clauses

Miscellaneous Materials. 1. There may be occasions when County may request Contractor to supply materials to complete a project such as drain or pipe.
AutoNDA by SimpleDocs
Miscellaneous Materials. Add the following new set of bullets: The laser printer(s) and/or color printer(s) needed for this project will be obtained for Department use through a statewide lease agreement and not as part of the Equipment Package contract item. A total of ( See "a" in Project Specific Details) Laser Printer (s) and ( See "b" in Project Specific Details) Color Printer (s) will be leased for the project. Provide compatible toner cartridges for each laser printer and compatible ink jet cartridges for each color printer indicated above, as required. The exact make and model of laser printer and/or color printer being used on the project will not be known until the start of work. For cost estimating purposes, toner cartridges and/ or ink jet cartridges furnished must be usable with the type of printer specified in Section 609.2(d)3. and Section 609.2(d)4., as applicable. Project Specific Details:
Miscellaneous Materials. Liquid nitrogen for TEM and other materials provided by UCI to be billed at current UCI rate.
Miscellaneous Materials. Revise to read as follows: 1103.11MISCELLANEOUS MATERIALS—
Miscellaneous Materials. A. General: Provide materials and types of fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation.
Miscellaneous Materials. .1 Fall arrest system:
Miscellaneous Materials. 4. Preparation of detailed engineering package in mutually agreed upon format, including:
AutoNDA by SimpleDocs
Miscellaneous Materials. (a) Miscellaneous materials shall be of the type specified on the drawings or as accepted by the Contract Administrator.
Miscellaneous Materials. A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.
Miscellaneous Materials. A. There may be occasions when County may request Contractor to supply materials to complete a project such as traffic loops, special subgrade material, utility covers, or manholes covers and rings.
Time is Money Join Law Insider Premium to draft better contracts faster.