Loading and Weight Sample Clauses

Loading and Weight. The contents of a container must be at or below the height of the container. This is necessary to ensure that the Sanitation Service driver can safely cover and secure the load and prevent spillage during the loading process of the container. Customer shall not overload the container and understands that the maximum legal weight limit for each container is ten (10) tons. If overloaded, Customer shall be responsible for unloading container to legal weight. Customer acknowledges being informed that filling a container approximately one-third (1/3) full (approximately ten (10) cubic yards) with heavy material such as shingles, dirt, concrete, brick, gravel, etc., will reach the weight limit of the container. All fees, fines and/or citations paid by the City of Yukon due to over-weight filling of a container will be charged back to the Customer.
AutoNDA by SimpleDocs
Loading and Weight. The contents of a container must be at or below the height of the container. This is necessary to ensure that the Sanitation Service driver can safely cover and secure the container, and the contents therein, and prevent spillage during the loading process of the container. Customer shall not overload the container and understands that the maximum legal weight limit for each container is ten (10) tons. If over the maximum legal weight limit, Customer shall be responsible for unloading the container to legal weight. Customer acknowledges being informed that filling a container approximately one-third (1/3) full (approximately ten (10) cubic yards) with heavy material such as shingles, dirt, concrete, brick, gravel, etc., will reach the weight limit of the container. All fees, fines, and/or citations paid by the City of Yukon due to a container being burdened beyond the legal weight limit shall be charged back to the Customer, and Customer agrees to pay said fees, fines, and/or citations.

Related to Loading and Weight

  • PACKING AND SHIPMENT (a) Unless otherwise specified, all Work is to be packed in accordance with good commercial practice.

  • PACKING AND SHIPPING a. Seller shall pack the goods and materials to prevent damage and deterioration. Unless otherwise set forth in this Contract, Seller shall package the goods in accordance with the requirements of Boeing Document D37522-6 “Supplier Packaging”. Buyer may charge Seller for damage to or deterioration of any goods resulting from improper packing or packaging.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Packaging and Shipping 3.1 Seller shall properly xxxx, xxxx, ship and route the Products in accordance with the requirements of Timken and the carriers and in accordance with all applicable laws and regulations, or if there are no stated requirements, in accordance with best commercial practices designed to prevent loss or damage due to weather, transportation and other causes.

  • Packaging and Shipment All articles are to be packed in accordance with sound commercial practices to obtain the lowest transportation rates unless otherwise specified in the NETAPP purchase order and comply with requirements of common carriers. Shipments will be valued so as to obtain the lowest transportation rate and must be made by NETAPP's choice of common carrier if specified in the purchase order. Transportation insurance for loss or damage will not be purchased by NETAPP unless specifically directed. Excess transportation costs resulting from failure to comply with the provisions of this paragraph will be debited to Seller's account. Unless otherwise specified in the NETAPP purchase order, packaging must conform to NETAPP's specifications and should be constructed for handling with a mechanical device. A complete packing list specifying NETAPPs applicable purchase order number, quantity of Goods shipped, and part number shall be enclosed with all shipments hereunder. Seller shall mark each container with necessary lifting, loading and shipping information, including the NETAPP purchase order number, date of shipment, and name and address of consignor and consignee. Seller shall bear the expense of any premium transportation charges unless otherwise agreed. Prepaid transportation charges appearing on Xxxxxx's invoice must be supported by a paid freight bill and bill of lading.

  • METERING AND BILLING Metering requirements and billing procedures shall be set forth in the AEC rate schedule(s) applicable to the electric service account assigned to the location where the Generating Facility is connected.

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. Purchaser may buck out cull material when necessary to produce pieces meeting Utilization Standards. Such bucked out material shall contain a minimum amount of sound wood, not in excess of the net scale in percentage of gross scale, or based on the merchantability factor, whichever is stated in A2. If necessary to assess extent of defect, Purchaser shall make sample saw cuts or wedges. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Load A term that refers to either a consumer of Energy or the amount of demand (MW) or Energy (MWh) consumed by certain customers. Load Serving Entity (“LSE”). Any entity, including a Municipal Electric System and a Cooperatively Owned Electric System, authorized or required by law, regulatory authorization or requirement, agreement, or contractual obligation to supply Energy, Capacity and/or Ancillary Services to retail customers located within the NYCA, including an entity that takes service from the ISO to supply its own Load within the NYCA; provided, however, that such entity has obtained all governmental authorizations necessary to serve Load in the NYCA.

  • Loading and Unloading The Hiree is responsible for the loading and unloading of the store hired.

Time is Money Join Law Insider Premium to draft better contracts faster.