LIST MODE Sample Clauses

LIST MODE. You can open a list of the current set of games in three different ways: • With the Dataset | List command from the main menu • By pressing [F5] • By selecting the Open list command in the local menu. The lines in this list are the game headers, and the current game is highlighted with a blue frame. Use the arrow keys, the green arrows on the toolbar, or the mouse to move along the list. You can also jump to the desired game by entering its number on the keyboard. Sometimes you can see small letters next to the numbers.
LIST MODE. You can open a list of the current set of games in three different ways: With the Dataset | List command from the main menu By pressing [F5] By selecting the Open list command in the local menu. The lines in this list are the game headers, and the current game is highlighted with a blue frame. Use the arrow keys, the green arrows on the toolbar, or the mouse to move along the list. You can also jump to the desired game by entering its number on the keyboard. Sometimes you can see small letters next to the numbers. a stands for games supplied with at least one annotation or diagram; v stands for games supplied with at least one variation; c stands for commented games with both text annotations (and/or diagrams) and variations; p stands for games started from a specific position. Look at the Order of fields in list section. The Selected window shows the displayed columns. If there is a column you don’t want to see, move it to the Not selected window. In order to do this, click on the unnecessary item in the Selected window and press the button. If you would like to hide all the items, press the button. The and buttons will do the opposite. To change the order of columns, click on one or several items and move them with the and buttons. In the General, Chessboard settings, Field options, Chess notation and Start notation from sections you can set many different options to modify the list accordingly. When you open a new list, its appearance will depend on the options set in the Tools | Options | List window. To copy the options you have set for the active window to the other lists, press the Copy to global options button. Y ou can quickly enter some value for a header field to all the current dataset games. To do this, ▇▇▇▇ this column by clicking on the column header, select Tools | Fill in the local menu, and the Fill pattern window will appear. Click on the Source line, then on the button with 3 dots on the right, and the Select from library … of base … window will appear. Select the necessary value that will be copied into the Fill pattern window, and press OK.

Related to LIST MODE

  • HOT LIST PRICING At any time during this Contract, Supplier may offer a specific selection of Equipment, Products, or Services at discounts greater than those listed in the Contract. When Supplier determines it will offer Hot List Pricing, it must be submitted electronically to Sourcewell in a line-item format. Equipment, Products, or Services may be added or removed from the Hot List at any time through a Sourcewell Price and Product Change Form as defined in Article 4 below. Hot List program and pricing may also be used to discount and liquidate close-out and discontinued Equipment and Products as long as those close-out and discontinued items are clearly identified as such. Current ordering process and administrative fees apply. Hot List Pricing must be published and made available to all Participating Entities.

  • CONTRACT EXHIBIT I PREFERRED PRICING AFFIDAVIT This preferred-pricing affidavit is entered into in accordance with section 216.0113, F.S., and as required by Contract No. 80101507-21-STC-ITSA (“Contract”) between (“Contractor”) and the Department of Management Services. As the person authorized by Contractor to sign this affidavit, I attest that the Contractor is in full compliance with the preferred-pricing clause of the Contract. Contractor’s Name: By: Signature Printed Name/Title Date: STATE OF COUNTY OF Sworn to (or affirmed) and subscribed before me this day of , by Vendor Name: FEIN# Vendor’s Authorized Representative Name and Title: Address: City, State, and Zip code: Phone Number: ( ) - E-mail: CORPORATE SEAL (IF APPLICABLE) (Print, Type, or Stamp Commissioned Name of Notary Public) [Check One] Personally Known OR Produced the following I.D.

  • DESCRIPTION OF CONTRACT MODIFICATION This contract modification is made in accordance with Exhibit E-Revised-1, Contractual Terms and Conditions, Section 22. CHANGES, to be made part hereof for all pertinent purposes. The changes are as follows:

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass ▇▇▇▇▇▇. In addition to runoff conveyance, the grass ▇▇▇▇▇▇ also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off- site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12- inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1-2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after Waukesha County accepts verification of construction from the project engineer.

  • DISTRIBUTION OF CONTRACTOR PRICE LIST AND CONTRACT APPENDICES Contractor shall provide Authorized Users with electronic copies of the Contract, including price lists and Appendices, upon request. Contract Updates will be handled as provided in Appendix C – Contract Modification Procedures.