IS CHANGED TO Sample Clauses

IS CHANGED TO. 3. The RE may require 3 color paper copies of the tabular reports, as specified in 153.03.02.2, and a printed network diagram (PERT) on 36 × 22-inch sheets detailing the activity relationships.
AutoNDA by SimpleDocs
IS CHANGED TO. 1. A copier with automatic document feed, 15 pages per minute copy speed, variable reduce/enlarge capability, and letter, legal, and ledger size capabilities. Erase the copier hard drive before removing the copier from the field office and provide the RE with a certification stating that the copier hard drive has been erased. THE FOLLOWING IS ADDED:
IS CHANGED TO. 2. For the Department’s fiber optic network, obtain and complete the fiber optic markout request form as specified in the Special Provisions. Submit a fiber optic markout request form to the Traffic Operations location specified in the Special Provisions for the markout. The Traffic Operations will complete the markout within 15 days of the receipt. Provide the RE a copy of the markout, and maintain the markout until construction operations in the vicinity of the Department’s fiber optic network are completed. Fiber Optic Markout Form is available at: xxxx://xxx.xxxxx.xx.xx/transportation/eng/elec/ITS/requests.shtm Bureau of Traffic Operations, North Region (TOCN) 000 Xxxxx Xxxxx Elmwood Park, NJ 00000-0000 Telephone: 000-000-0000
IS CHANGED TO. 5. Temporary Crash Cushion. Install inertial barrier systems as specified in 611.03.01. Install temporary compressive crash cushions as specified in 611.03.02. Immediately repair or replace crash cushions that become damaged or become inoperable. Begin repair or replacement of the temporary crash cushion within 1 hour of receiving notice of damage from the Department. Ensure that workers assigned to such repair or replacement work continuously until the temporary crash cushion is repaired or replaced. If the Contractor fails to respond to a damage notification and begin work within 1 hour of notification, or does not continue to work until the temporary crash cushion is repaired or replaced, the Department, will require closure of the adjacent live lane. Xxxx occupancy charges will be imposed as specified in 108.08 for the period of time the adjacent lane is closed. Should the Department have to respond to a repair with its own forces because of a Contractor’s lack of response to a damage notification, the Contractor agrees to pay the Department a sum of $3,000 for costs of mobilizing its forces and equipment. In addition, the Contractor must pay the Department the actual cost of material used for the repair and pay the actual costs of police traffic protection. Maintain an adequate number of replacement parts to repair damaged units at all times. Keep the areas in front, atop, and around the crash cushions clear of snow accumulation of more than 4 inches in depth. Upon removal of the crash cushion, cut anchor bolts at least 3 inches below the surface of the surrounding roadway. Repair HMA pavement as specified in 401.03.03. Repair concrete pavement as specified in Section 452.
IS CHANGED TO. 2. For the Department’s fiber optic network, Obtain and complete the fiber optic markout request form as specified in the Special Provisions. Submit a fiber optic markout request form to the Traffic Operations location specified in the Special Provisions for the markout. The Traffic Operations will complete the markout within 15 days of the receipt. Provide the RE a copy of the markout, and maintain the markout until construction operations in the vicinity of the Department’s fiber optic network are completed. Fiber Optic Markout Form is available at: xxxx://xxx.xxxxx.xx.xx/transportation/eng/elec/ITS/requests.shtm Bureau of Traffic Operations, North Region (TOCN) 000 Xxxxx Xxxxx Elmwood Park, NJ 00000-0000 Telephone: 000-000-0000 Bureau of Electrical Maintenance, North Region 000 Xxxxxxx Xxxxx Mt. Arlington, NJ 00000-0000 Telephone: 000-000-0000 FOR WEIGH IN MOTION AND TRAFFIC VOLUME SYSTEMS CONTACT: Bureau of Safety and Data Development – Technology Section PO Box 600 Trenton, NJ 08625 000-000-0000 FOR ROADWAY WEATHER INFORMATION SYSTEMS CONTACT: Bureau of Maintenance Engineering & Support - Electrical Section PO Box 600 Trenton, NJ 08625 000-000-0000 THE SECOND PARAGRAPH IS CHANGED TO: Protect and support existing Department electrical and ITS facilities and ensure that there is no interruption of service. Use hand tools only while working within two feet of the fiber optic network. At least 30 days before beginning the work, submit a plan to the RE for approval showing the method of support and protection. When access to Traffic Operation Centers, communication hubs, ITS cabinets or any other ITS facilities is required to perform work, submit a request for access to ITS facilities. Ensure that the request for access is made at least five working days before any work is scheduled, using the online form as specified in the Special Provisions. xxxx://xxx.xxxxx.xx.xx/transportation/eng/elec/ITS/access.shtm THE FOURTH PARAGRAPH IS CHANGED TO: Access within railroad right-of-way is restricted. Before beginning work within the railroad ROW or on railroad facilities, obtain the railroad’s written approval for access, the method of construction, and the schedule of the work. Provide a copy of the submittal and approval to the RE. Comply with the railroad’s requirements for working within the railroad right-of-way. THE FOLLOWING IS ADDED TO THE SIXTH PARAGRAPH Ensure that the work is performed following the railroad’s access and safety restrictions.
IS CHANGED TO. (1) 4 multi-line touch-tone telephones and 3 telephone lines for use with the telephones installed as directed and operational in the Field Office and other facilities specified.
IS CHANGED TO. 2. For the Department’s fiber optic network, Obtain and complete the fiber optic markout request form as specified in the Special Provisions. Submit a fiber optic markout request form to the Traffic Operations location specified in the Special Provisions for the markout. The Traffic Operations will complete the markout within 15 days of the receipt. Provide the RE a copy of the markout, and maintain the markout until construction operations in the vicinity of the Department’s fiber optic network are completed. Fiber Optic Markout Form is available at: xxxx://xxx.xxxxx.xx.xx/transportation/eng/elec/ITS/requests.shtm Bureau of Traffic Operations, North Region (TOCN) 000 Xxxxx Xxxxx Elmwood Park, NJ 00000-0000 Telephone: 000-000-0000 Bureau of Traffic Operations, South Region (TOCS) 1 Executive Campus-Route 70 West Cherry Hill, NJ 00000-0000 Telephone: 000-000-0000
AutoNDA by SimpleDocs
IS CHANGED TO. 3. The Contractor has satisfactorily executed and delivered to the RE all documents, including federal form FHWA-47 “Contractor’s Statement of Materials and Laboraccording to 23CFR 635, certifications, and proofs of compliance required by the Contract Documents, it being understood that the satisfactory execution and delivery of documents, certificates, and proofs of compliance is a requirement of the Contract. pavement structure. The combination of pavement, base courses, and when specified, a subbase course, placed on a subgrade to support the traffic load and distribute it to the roadbed (see Figure 101-1). These various courses are defined as follows:
IS CHANGED TO. 2. For the Department’s fiber optic network, Obtain and complete the fiber optic markout request form as specified in the Special Provisions. Submit a fiber optic markout request form to the Traffic Operations location specified in the Special Provisions for the markout. The Traffic Operations will complete the markout within 15 days of the receipt. Provide the RE a copy of the markout, and maintain the markout until construction operations in the vicinity of the Department’s fiber optic network are completed. Fiber Optic Markout Form is available at: xxxx://xxx.xxxxx.xx.xx/transportation/eng/elec/ITS/requests.shtm Bureau of Traffic Operations, North Region (TOCN) 000 Xxxxx Xxxxx Elmwood Park, NJ 00000-0000 Telephone: 000-000-0000 Bureau of Electrical Maintenance, North Region 000 Xxxxxxx Xxxxx Mt. Arlington, NJ 00000-0000 Telephone: 000-000-0000 FOR WEIGH IN MOTION AND TRAFFIC VOLUME SYSTEMS CONTACT: Bureau of Safety and Data Development – Technology Section PO Box 600 Trenton, NJ 08625 000-000-0000 FOR ROAD WEATHER INFORMATION SYSTEMS CONTACT: Bureau of Maintenance Engineering & Support - Electrical Section PO Box 600 Trenton, NJ 08625 000-000-0000

Related to IS CHANGED TO

  • Status Change Upon the termination of the Optionee’s Employment, this Option shall continue or terminate, as and to the extent provided in the Plan and this Agreement.

  • Corporate Change Seller shall advise Purchaser in writing of the opening of any new chief executive office, or the closing of any such office, of any Seller Party and of any change in any Seller Party’s name or the places where the books and records pertaining to the Purchased Asset are held not less than fifteen (15) Business Days prior to taking any such action.

  • Address Change Client shall notify Sapphire Check if Client changes its name or address.

  • Termination for Market Change (a) In the event of delay or interruption under B8.33, exceeding 90 days, and Contract has not been modified to include replacement timber, this contract may be terminated upon election and written notice by Purchaser, if (i) a rate redetermination for market change under B3.33 shows that the appraised weighted average Indicated Advertised Rate of all Included Timber remaining immediately prior to the delay or interruption has been reduced through a market change by an amount equal to or more than the the weighted average Current Contract Rate, or (ii) the appraised value of the remaining timber is insufficient to cover the adjusted base rates as determined under B3.33.

  • Change in Status ‌ In the event of any substantive change in its legal status, organizational structure, or fiscal reporting responsibility, Contractor will notify HCA of the change. Contractor must provide notice as soon as practicable, but no later than thirty (30) calendar days after such a change takes effect.

  • Corporate Changes Neither Borrower nor any Subsidiary shall change its corporate name, legal form or jurisdiction of formation without twenty (20) days’ prior written notice to Agent. Neither Borrower nor any Subsidiary shall suffer a Change in Control. Neither Borrower nor any Subsidiary shall relocate its chief executive office or its principal place of business unless: (i) it has provided prior written notice to Agent; and (ii) such relocation shall be within the continental United States. Neither Borrower nor any Subsidiary shall relocate any item of Collateral (other than (x) sales of Inventory in the ordinary course of business, (y) relocations of Equipment having an aggregate value of up to $150,000 in any fiscal year, and (z) relocations of Collateral from a location described on Exhibit C to another location described on Exhibit C) unless (i) it has provided prompt written notice to Agent, (ii) such relocation is within the continental United States and, (iii) if such relocation is to a third party bailee, it has delivered a bailee agreement in form and substance reasonably acceptable to Agent.

  • Termination After Change in Control Sections 9.2 and 9.3 set out provisions applicable to certain circumstances in which the Term may be terminated after Change in Control.

  • Termination After Change of Control In the event that, before the expiration of the TERM and in connection with or within one year of a CHANGE OF CONTROL (as defined hereinafter) of either one of the EMPLOYERS, the employment of the EMPLOYEE is terminated for any reason other than JUST CAUSE or is terminated by the EMPLOYEE as provided in Section 4(a)(ii) above, then the following shall occur:

  • Change in Effective Control A Change in Effective Control occurs if, over a twelve (12) month period: (i) a person or group acquires stock representing thirty percent (30%) of the voting power of the corporation; or (ii) a majority of the members of the board of directors of the ultimate parent corporation is replaced by directors not endorsed by the persons who were members of the board before the new directors’ appointment, as defined in Treasury Regulations §1.409A-3(i)(5)(vi).

  • Change in Name Give Lender written notice immediately upon forming an intention to change its name, state of organization or form of business organization.

Time is Money Join Law Insider Premium to draft better contracts faster.