Identified Needs Clause Samples

Identified Needs. The engineering of an electrical vehicle is similar to that of a conventional vehicle in many ways. The particular needs we want to address in this section concern the analysis and synthesis of electrical power consumption, current analysis, power architecture analysis, cable length analysis, component cost analysis and component count analysis. This needs to be supported both statically and dynamically. Other possible FEV-related analyses include: • Insulation analysis, to examine overall resistance and voltage compliance • RESS short circuit analysis • Charging inlet voltage analysis • Transient voltage analysis, e.g. for accidental discharge of capacitors into accessible parts of the EV • Range analysis, to determine maximum range of the EV given the battery capacity and electricity consumption of auxiliary components • Power analysis in key-off mode, to prevent excessive discharge due to vehicle equipment operating in standby mode • Powered braking analysis, to ensure correct braking operation in depleted-power scenarios Constraints can be linked to EAST-ADL and AUTOSAR elements. The mode element defines where the constraint is applicable, and it is possible to analyse the total set of constraint in each mode. To find an average or total measure, the result can be considered in steady state where the modes change according to the behavioral definition. Below we will discuss what this means for each type of constraint studied.

Related to Identified Needs

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

  • Orally Administered Anticancer Medication In accordance with RIGL § 27-20-67, prescription drug coverage for orally administered anticancer medications is provided at a level no less favorable than coverage for intravenously administered or injected cancer medications covered under your medical benefit.

  • CLASSIFICATIONS AND WAGE RATES A current list of Field job classifications and applicable wage rates for the Nevada Irrigation District are set forth in the District Wage Schedule.

  • Payment for Labor and Materials (a) Borrower will promptly pay when due all bills and costs for labor, materials, and specifically fabricated materials ("LABOR AND MATERIAL COSTS") incurred in connection with the Property and never permit to exist beyond the due date thereof in respect of the Property or any part thereof any lien or security interest, even though inferior to the liens and the security interests hereof, and in any event never permit to be created or exist in respect of the Property or any part thereof any other or additional lien or security interest other than the liens or security interests hereof except for the Permitted Encumbrances. (b) After prior written notice to Lender, Borrower, at its own expense, may contest by appropriate legal proceeding, promptly initiated and conducted in good faith and with due diligence, the amount or validity or application in whole or in part of any of the Labor and Material Costs, provided that (i) no Event of Default has occurred and is continuing under the Loan Agreement, the Note, this Security Instrument or any of the other Loan Documents, (ii) Borrower is permitted to do so under the provisions of any other mortgage, deed of trust or deed to secure debt affecting the Property, (iii) such proceeding shall suspend the collection of the Labor and Material Costs from Borrower and from the Property or Borrower shall have paid all of the Labor and Material Costs under protest, (iv) such proceeding shall be permitted under and be conducted in accordance with the provisions of any other instrument to which Borrower is subject and shall not constitute a default thereunder, (v) neither the Property nor any part thereof or interest therein will be in danger of being sold, forfeited, terminated, canceled or lost, and (vi) Borrower shall have furnished the security as may be required in the proceeding, or as may be reasonably requested by Lender to insure the payment of any contested Labor and Material Costs, together with all interest and penalties thereon.

  • Identification of Goods Identification of the goods shall not be deemed to have been made until both Buyer and Seller have agreed that the goods in question are to be appropriate to the performance of this Agreement.