Timing analysis tooling Sample Clauses

Timing analysis tooling. A first version of a timing analysis gateway was developed in the context of the EDONA project xxxx://xxx.xxxxx.
AutoNDA by SimpleDocs

Related to Timing analysis tooling

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • COMPENSATION ANALYSIS After the expiration of the second (2nd) Renewal Term of this Agreement, if any, a Compensation Analysis may be performed. At such time, based on the reported Total Gross Revenue, performance of the Concession, and/or Department’s existing rates for similarly- performing operations, Department may choose to increase the Concession Payment for the following Renewal Term(s), if any.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously. Annex 6 - Appendix 4

  • Test Samples The Contractor is responsible for providing Samples of sufficient size for test purposes and for coordinating such tests with the Work Progress Schedule to avoid delay.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • Testing/Trouble Reporting 1.15.1 TWTC will be responsible for testing and isolating troubles on Network Elements. TWTC must test and isolate trouble to the AT&T network before reporting the trouble to the Network Elements Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from AT&T at the time of the trouble report, TWTC will be required to provide the results of the TWTC test which indicate a problem on the AT&T network. Version: 4Q06 Standard ICA 11/30/06

Time is Money Join Law Insider Premium to draft better contracts faster.