Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 38 contracts
Samples: Draft Contract Agreement, Draft Contract Agreement, Draft Contract Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the licence granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority Government shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 9 contracts
Samples: Concession Agreement, Concession Agreement, Concession Agreement
Geological and archaeological finds. 10.7.1 It is expressly agreed that mining, geological or archaeological rights do not form part of the lease granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 7 contracts
Samples: Draft Concession Agreement, Draft Concession Agreement, Draft Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the rights granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights right or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rightsright, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses expense incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 6 contracts
Samples: Concession Agreement, Concession Agreement, Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the license granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure ensure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 5 contracts
Samples: Concession Agreement, Model Concession Agreement, Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the licence granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable from xxx.xxxxxx.xxx Downloaded expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority Government shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 5 contracts
Samples: Concession Agreement, Concession Agreement, Agreement
Geological and archaeological finds. 8.8.1 It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority Employer or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority Employer forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the AuthorityEmployer. It is also agreed that the Authority Employer shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 4 contracts
Samples: Procurement and Construction Agreement, And Construction Agreement, Contract Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the licence granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority MOR or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority MOR forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the AuthorityMOR. It is also agreed that the Authority MOR shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 3 contracts
Samples: Model Agreement, Model Agreement, Model Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, ,fossils, ,antiquities, structures or other remnants or things either of particular ,structuresorotherremnantsorthingseitherofparticular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 3 contracts
Samples: Contract Agreement, Draft Contract Agreement, Draft Contract Agreement
Geological and archaeological finds. 10.8.1 It is expressly agreed that mining, geological or archaeological rights do not form part of the license granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Project Site shall vest in and belong to the Authority or the concerned Government Authority Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Authority Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Authority Instrumentality within a reasonable period.
Appears in 2 contracts
Samples: Concession Agreement, Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the license granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority Government or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall xxxxxxxx inform the Authority forthwith of the discovery thereof and comply with such instructions as the Authority or the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.The Parties further agree as under:
Appears in 2 contracts
Samples: Concession Agreement, Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the Authority or the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 2 contracts
Samples: Procurement and Construction Agreement, And Construction Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, ,fossils, ,antiquities, structures or other remnants or things either of particular ,structuresorotherremnantsorthingseitherofparticular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by Drafit Contract Agreement the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.. Drafit Contract Agreement Page 57 of 148 Article 9
Appears in 2 contracts
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the licence granted to the Service Provider under this Agreement with the Contractor for the Works, and the Contractor Service Provider hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Contracting Authority or the concerned Government Instrumentality. The Contractor Service Provider shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Contracting Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Service Provider hereunder shall be reimbursed by the Contracting Authority. It is also agreed that the Authority Government shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.. CLAUSE 11
Appears in 1 contract
Samples: Project Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the Lease Rights granted to the Lessee under this Agreement with the Contractor for the Works, and the Contractor Lessee hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site Land Parcel shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor Lessee shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 1 contract
Samples: Substitution Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor Concessionaire for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the Authority or the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 1 contract
Samples: Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the license granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority Government or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the Authority or the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.The Parties further agree as under:
Appears in 1 contract
Samples: Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the licence granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Contracting Authority or the concerned Government InstrumentalityAuthority. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Contracting Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality Authority may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Contracting Authority. It is also agreed that the Authority Government shall procure that the instructions hereunder are issued by the concerned Government Instrumentality Authority within a reasonable period.
Appears in 1 contract
Samples: Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures Structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority Employer or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority Employer forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed here by confirmed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the AuthorityEmployer. It is also agreed that the Authority Employer shall procure make all endeavors that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 1 contract
Samples: Epc Contract Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular ofparticular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.. Improvement and widening to two lane with paved shoulder of road from Km 21.100 to Km
Appears in 1 contract
Samples: Draft Contract Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under orunder the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen work men or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such withsuch instructions as the concerned Government Instrumentality may reasonably give for givefor the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred anyreasonable expensesincurred by the Contractor hereunder shall be reimbursed by the bythe Authority. It is also agreed that the Authority shall procure that the instructions hereunder here under are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 1 contract
Samples: nhidcl.com
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of the license granted to the Contractor under this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the Authority or the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government - Instrumentality within a reasonable periodperiod so as to enable the Contractor to continue its Construction Works with such modifications as may be deemed necessary.
Appears in 1 contract
Samples: Contract Agreement
Geological and archaeological finds. 8.8.1 It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 1 contract
Samples: And Construction Agreement
Geological and archaeological finds. β It is expressly agreed that mining, geological or archaeological rights do not form part of the licence granted to the Concessionaire under this Agreement with the Contractor for the Works, and the Contractor Concessionaire hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor Concessionaire shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor Concessionaire hereunder shall be reimbursed by the Authority. It is also agreed that the Authority Government and/ or GOI shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period. .
Appears in 1 contract
Samples: Concession Agreement
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.. km 25.552 to km 27.500 of NH-37A (New NH-715) in the State of Assam on EPC Mode Aug. 2020
Appears in 1 contract
Samples: nhidcl.com
Geological and archaeological finds. It is expressly agreed that mining, geological or archaeological rights do not form part of this the Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority KDA or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority KDA forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. XX X. It is also agreed that the Authority KDA shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.
Appears in 1 contract
Samples: Epc Agreement