Galvanized Sample Clauses

Galvanized. Steel Sheet: Hot-dip, zinc-coated steel sheet complying with ASTM A 653/A 653M, G60 (Z180) coating designation.
Galvanized. Attic ventilation None and solid soffit with 6" overhang. Interior divide walls 2 x 8 T&G PVC Planking Hallway walls 2 x 4 Frame with PPD with 3/8" backing and SS nails and trims. CONCRETE SPECIFICATIONS: Shallow footings 8" x 12" Footer. 6" perimeter stem wall with 3' OC vertical #3 rebar and 2 horizontal #3 rebar. Two horizontal rebar one below and one above grade. Vertical rebar to be 3' OC #3. Floors 3 1/2" to 4" thick Footings and pit walls and floors to be 3000PSI concrete and walk floors to be 3500PSI concrete. All flush pits 16" in depth sloped as per customer request. ELECTRICAL SPECIFICATIONS: 1-200 amp main interior 42 space panel. 206 22W McGill lights 206-120V duplex receptacles at Owner's option and 2-220V receptacles at Owner's option. Other electrical to ventilation, heaters and feed systems as required. All electrical in carlon or equal. PLUMBING SPECIFICATIONS: All plumbin▇ ▇▇ ▇e PVC. One run of 2" mainline with pressure reducers for nipple drops and 1" hi-volume line with 4 drops per room.
Galvanized steel PV module support and racking system support posts shall be removed and disposed off-site by an approved facility.
Galvanized steel 8D nails shall be used when placing structural-use panels, and galvanized steel 16D when placing furring strips. Galvanized self-tapping No.10 screws, 2 ½ inches long, with gimlet point should only be used when it becomes necessary to anchor a furring strip directly to corrugated roofing where there is not an existing rafter underneath to anchor into. All fasteners shall be installed every twenty-four (24) inches on center along the panel or furring strip. Corrugated roofs may require 3 1/2 –inch fasteners. The Contractor shall furnish and install fasteners of sufficient length to ensure a good connection.
Galvanized. Attic ventilation Ridge vents and solid soffit 16" overhang. Air chamber inlet room As per standard specifications Curtain openings Screened but bird wire and interior base of hog panel galvanized. CONCRETE SPECIFICATIONS: Shallow footings 6" x 36" trenched. 24" x 6" perimeter stem wall with 3' OC vertical #3 rebar and 2 horizontal #3 rebar. Two horizontal rebar one below and one above grade. Vertical rebar to be 3' OC #3. Floors 3 1/2" to 4" thick Footings and pit walls and floors to be 3000PSI concrete and walk floors to be 3500PSI concrete. Wire mesh in all floor areas. All flush pits 16" -24" in depth sloped as per customer request. ELECTRICAL SPECIFICATIONS: 1-200 amp main interior 42 space panel. 100 22W McGill lights with florescent fixtures 4 rows of 12, 3 120V receptacles at Owner's option and 1-220V receptacles at Owner's option. Other electrical to ventilation, heaters and feed systems as required. All electrical in carlon or equal. PLUMBING SPECIFICATIONS: All plumbin▇ ▇▇ ▇e PVC. 2" PVC mainline. Soaker system in breeding squares. 6 runs of 1" high volume line with 4 drops per line. 2 boiler drains. 6" recycle line with one drop per pit.
Galvanized. Attic ventilation Ridge vents and vented soffit 12" overhang. Floor covering Commercial tile OWNER'S color choice-Office Vinyl base trims. All front office areas and rest rooms and shower areas. Floor covering Storage area, AI lab and utility room unpainted concrete. CONCRETE SPECIFICATIONS: Footings 6" x 36" Footing. Two horizontal rebar one below and one above grade. Vertical rebar to be 3' OC #3. Floors 3 1/2" to 4" thick All concrete to be 3500PSI concrete. One exterior 6' x 4' stoop areas with boot scraper. ELECTRICAL SPECIFICATIONS: 150 amp main interior 30 space panel to handle office area. 14-4' 4 tube fluorescent lights in office/AI area. 2-8' 2 tube fluorescent lights in boot room. 14-4' 2 tube fluorescent lights in bathroom, shower rooms, utility room and rest rooms. Incandescent lights in storage/utility areas. 1-exterior 175w security fixture at building entrance. All electrical outlets in shower areas and bathrooms to be ground fault interruption style. Standard residential wiring codes. PLUMBING SPECIFICATIONS: All plumbing to be PVC installed and vented as required to meet codes. Larger Shop drain with grate 12" x 12". Septic system and drain field by OWNER.
Galvanized after finishing the machining and marking, all parts of iron and steel will be galvanized through hot dip according to ASTM A 153 standard.
Galvanized. Steel Items: Plated steel fasteners complying with ASTM B 633, Class Fe/Zn 25 for electrodeposited zinc coating.
Galvanized. ASTM A36, hot-dip zinc coated per ASTM A153, Class C or mechanically

Related to Galvanized

  • Platby In consideration for the proper performance of the Study by Institutionin compliance with the terms and conditions of this Agreement, payments shall be made in accordance with the provisions set forth in Attachment A, with the last payment being made after the Site completes all its obligations hereunder, and IQVIA has received all properly completed CRFs and, if IQVIA requests, all other Confidential Information (as defined below. DrugDev will receive Site invoices and process payments unless otherwise agreed. Any queries regarding Institution invoices or payments should be directed to ▇▇▇▇▇▇▇ at the contact details outlined in Attachment A. V souvislosti s řádným plněním Studie Poskytovatelem, a to v souladu s podmínkami a ustanoveními této Smlouvy, budou poskytovány platby dle podmínek a ustanovení definovaných v Příloze A, přičemž poslední platba bude uskutečněna poté, co Místo provádění klinického hodnocení splní a dokončí veškeré závazky, jež mu vyplývají z této Smlouvy, a IQVIA obdrží veškeré řádně vyplněné CRF a, bude-li tak IQVIA vyžadovat, veškeré další Důvěrné informace (ve smyslu níže uvedené definice). Nebude-li ujednáno jinak, faktury bude Místo provádění klinického hodnocení zasílat společnosti DrugDev, která je bude proplácet. Veškeré dotazy ohledně faktur Místa provádění klinického hodnocení nebo plateb je třeba směřovat na společnost DrugDev, jejíž kontaktní údaje jsou uvedeny v Příloze A.

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • WATERBEDS The Tenant: (check one)

  • As-Built Plans Within thirty (30) days after completion of Tenant’s Changes requiring the submission of plans to Landlord, Tenant shall furnish to Landlord a complete set of “as-built” plans and specifications.