Front End Loader Sample Clauses
The 'Front End Loader' clause defines the requirements and responsibilities related to the use of front end loaders on a project site. It typically outlines who is responsible for providing, operating, and maintaining the equipment, as well as any safety or operational standards that must be met. For example, the clause may specify that only qualified personnel may operate the loader and that regular inspections are required. The core function of this clause is to ensure safe and efficient use of heavy machinery, thereby minimizing the risk of accidents and clarifying operational responsibilities between parties.
POPULAR SAMPLE Copied 1 times
Front End Loader. Supply a high performance 250 HP front end loader with bucket capacity of at least 2 CUM.
Front End Loader. The cost of permits or licences required to drive a front end loader will be paid by the Company.
Front End Loader. The candidate will demonstrate their ability to properly load a dump truck. They will be judged on how they place the truck, how they enter the stockpile, the angle of their bucket, whether they spin the loader tires, how full the bucket is, and how the load looks when they are finished loading.
Front End Loader. When a Heavy Equipment Operator (HEO) is not available, due to operational need to load trucks in Streets Operations yards and a Street Maintenance Worker, Grounds Maintenance Worker, or Equipment Operator, who is qualified, is assigned to load their truck with a front end loader, with approval of management, they will be set-up to HEO pay. The upgrade will be paid for a minimum of one (1) hour; thereafter, actual pay will be in one- tenth (1/10) hour increments. If a qualified Street Maintenance Worker, Grounds Maintenance Worker, or Equipment Operator, is assigned to load their truck with a front end loader at the Asphalt Plant, with approval of management, they will be set-up to Asphalt Plant Operator (APO) pay. The upgrade will be paid for a minimum of one (1) hour; thereafter, actual pay will be in one-tenth (1/10) hour increments.
Front End Loader. All work associated with the operation of front end loading within a worksite and including general duties.
Front End Loader. Supply a high performance 250 HP front end loader with bucket capacity of at least 2 CUM. Hour 19 Batch Machin (Concrate Mixer) 200 liters: Supply a high performance one bag tilting drum concrete mixer with driver (operator) to the construction site, according to the specification and complete satisfaction of the office engineer. Day 20 Excavator Works for Excavation and Back filling Hour Pamir Handpump SN Unit Item Name Specs Photo 1 pcs (Pamir Handpump) T-bar handle Stronger Heavy-Duty Handle, Includes Ball Bearing with different pints and hosting to be used in this handpump part instead of plating bearings. With Adjustable nut to allow the adjustment with desirable handle length. With minimum stroke length 225mm. 2 pcs (Pamir handpump) Long pedestal Pedestal, long, 16kg 3 pcs (Pamir handpump) pump rod , 2.9m long 2.9m Long- SS Connecting Rod Diameter 10mm, Double Hook 4 pcs (Pamir handpump) Pump head with cover Pump Head (Cover),19- 21kg, handpump 5 pcs (Pamir handpump) uPVC pressure pipe, Rising main. uPVC pressure pipe, 63mm diameter (OD), 4.7mm thick wall, to glue, 2.9m long 6 pcs (Pamir handpump) Cone plate, steel cone Thickness 3 mm 7 pcs Pamir handpump) Hex nut, Hex bolt, Flat washer Pamir handpump) Hex nut M16, Hex bolt M16 x 40mm long, Flat washer M16 8 pcs (Pamir handpump) Cylinder assembly containing cylinder, foot valve, rod and plunger. Complete ss, length,970 mm thickness,6mm 9 pcs (Pamir handpump) Pipe Centralizer Internal Dia 62 mm thickness 22 mm 10 pcs (Pamir handpump) Rod centralizer Slot length 29.5-30.5 mm O.D47.8-48.5 mm 11 pcs (Pamir handpump) Rubber cone Dia 62 mm 12 Roll Rope Rope, polypropylene, 10mm thickness, roll of 200m 13 pcs PVC Glue Weld-On PVC Glue, 470ml, for PVC pipe, “Weld-on 717 PVC” minimum 2 year expiry 14 pcs (Pamir handpump) Rubber flapper Thickness 6mm dia,97 mm hole dia 10 mm
Front End Loader. (FEL) Run Of Mine (ROM) Operation
Front End Loader. Employees holding a license or recognised Verification of Competence (VOC) and is directed by ▇▇▇▇▇▇ to operate a Front End Loader (FEL) to load tippers or to batch concrete via the weigh ▇▇▇▇▇▇, will be paid an allowance of $40.74 per week for any week or part thereof they have used the Front End Loader. The allowance rate in this clause is effective from 1 January 2024 and shall increase in accordance with the percentage wage increases in clause 14.1.
