For the Metro Area Sample Clauses

For the Metro Area. These goals were mutually developed by a “PMAP Public Health Goals” ad hoc work group, composed of members of the Metropolitan Local Public Health Association and the Minnesota Council of Health Plans. The goal statements for immunizations and tobacco use prevention were derived from local, state, and federal population health improvement goals:
AutoNDA by SimpleDocs

Related to For the Metro Area

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • Test method 3.3.1. The method used shall be that described in Annex 3, paragraph 3.1.

  • Heavy Blocks An employee shall not be required to lift a building block in excess of 20 kg in weight unless such employee is provided with a mechanical aid or with an assisting employee; provided that an employee shall not to manually lift any building block in excess of 20 kg weight to a height of more than 4 feet (1.2m) above the working platform.

  • ICE Method The method used to calculate One-Month LIBOR, as described in Section 3.05.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • We provide Message Boards for the use of Our Website users The Message Boards may not be used to promote Websites or any commercial or business activity. We are not responsible for any of the opinions expressed in the Message Boards. By posting a message to the message board You agree to take full legal responsibility and liability for your comments, including for offensive or defamatory statements. Feedback: Feedback is provided for the purpose of facilitating trading by You on Our Website. Feedback provided on other parties must not contain offensive, defamatory, retaliatory or inappropriate language or content. We may remove any feedback that is considered to be offensive, defamatory, retaliatory or inappropriate. You may only give feedback that relates to a specific transaction. You must not post feedback on a transaction that does not relate to that specific transaction. You must not post feedback about Yourself or include any contact details or Personal Information in Your feedback.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • CORRECTIVE MEASURE The contractor shall repair any deficiencies in excess of the performance guideline.

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

Time is Money Join Law Insider Premium to draft better contracts faster.