Common use of Fixing Clause in Contracts

Fixing. (i) All vertical pipes shall be fixed by M.S. clamps truly vertical. Branch pipes shall be connected to the stack at the same angle as that of the fittings. No collars shall be used on vertical stacks. Each stack shall be terminated at top with a cowl. (Terminal Guard). (ii) Horizontal pipes running along ceiling shall be fixed on structural adjustable clamps of special design shown on the drawings or as directed. Horizontal pipes shall be laid to uniform slope and the clamps adjusted to the proper levels so that the pipes fully rest on them. (iii) The Concessionaire shall provide all sleeves, openings, hangers, and inserts during the construction. All damages shall be made good to restore the surface.

Appears in 3 contracts

Sources: Concession Agreement, Concession Agreement, Concession Agreement