Eligible Projects. The following is a list of projects that may meet the Qualifying Parameters under Category II. This list is not inclusive of every project and there may be projects not listed below that meet the Qualifying Parameters and can be proposed by MDOT MAA and reviewed by Commission staff under Category II. ● Category I projects that fail to meet Category I threshold limits ● Buildings/structures - new, expansion of existing, replacement, relocation, in-kind, etc. ● Repairs to or replacement of MDOT MAA installations such as fuel storage facilities, navigational aids, and airfield pavement. ● New/Replacement shore erosion control measures (revetment, bulkheads, living shorelines) up to 500 linear feet in length ● Installation of new or modification of existing storm drain outfalls ● Installation of new or modification of existing inlets and storm drains ● Reconstruction, patching, and/or resurfacing of runways, taxiways/taxilanes, roadways, intersections, parking lots, and/or sidewalks where an increase in imperviousness is proposed ● Unimproved stone/asphalt shoulder and gravel roads - conversion to paved shoulder over Graded Aggregate Base where ground disturbance is proposed ● Widening of shoulder (permanent) ● Replacement of impervious surfaces with permeable surfaces ● Upgrades to existing facilities in order to meet requirements for Americans with Disabilities Act (ADA) ● Reconstruction of existing sidewalks and new or existing ADA ramps with more than 250 square feet of new imperviousness ● Installation of new utility lines and appurtenances (vaults, manholes, valves, hydrants) ● Directional boring associated with new utility lines ● Stormwater management facility maintenance and retrofit with over 20,000 square feet of cutting, clearing, or grubbing of woody vegetation within the existing footprint of the facility, including any maintenance easement for access to the facility ○ No clearing limit for woody vegetation, including in the Buffer ○ Written justification is required for impacts in the Buffer outside of the existing footprint of the facility, or for cutting, clearing, or grubbing of woody vegetation outside of the existing footprint of the facility, including any impacts to the Buffer or cutting, clearing, or grubbing of woody vegetation related to a new access road. Impacts outside the existing footprint of the facility, to the Buffer or to woody vegetation outside the Buffer, shall be mitigated at 1:1. ● Green infrastructure practices that are installed to treat previously untreated impervious surfaces and not otherwise required for a project that meet the following thresholds and requirements: ○ 20,000 square feet of tree clearing with no more than 5,000 square feet of clearing in the Buffer ○ Written justification is required if more than 20,000 square feet is proposed to be cleared ○ Mitigation is provided at 1:1 for all forest or developed woodland clearing, including Buffer clearing ● New areas of vegetative clearing required by FAA or DHS regulations which include, but are not limited to, the following: ○ Federal Aviation Regulation (FAR) Part 77 [49 Code of Federal Regulations (CFR) Part 77], which addresses regulated surfaces such as approach and departure airspace ○ FAA Order 8260.3D United States Standard for Terminal Instrument Procedures (TERPS) which also addresses regulated airspace protection surfaces ○ FAA Advisory Circular 150/5300-13 that provides airfield design standards including Safety Areas, Object Free Areas, Protection Zones and grade limitations ○ FAR Part 139 [14 (CFR), Part 139] and Transportation Security Administration (TSA) Guidelines for General Aviation Airport Operators and Users which address airport security ○ FAA Advisory Circular No. 150/5200-33, “Hazardous Wildlife Attractants on or Near Airports,” which provides wildlife management strategies for airport operators during development
Appears in 1 contract
Sources: Memorandum of Understanding
Eligible Projects. The following is a list of projects that may meet the Qualifying Parameters under Category II. This list is not inclusive of every project and there may be projects not listed below that meet the Qualifying Parameters and can be proposed by MDOT MAA SHA and reviewed by Commission staff CAC under Category II. ● Category I projects that fail to meet Category I threshold limits limits. ● Buildings/structures - new, expansion of existing, replacement, relocation, in-kind, etc. ● Repairs to or replacement of truck weigh stations, salt domes, rest areas, or MDOT MAA installations such as fuel storage facilities, navigational aids, and airfield pavementSHA installations. ● New/Replacement shore erosion control measures (revetment, bulkheads, living shorelines) up to 500 linear feet in length ). ● Installation of new or modification of existing storm drain outfalls ● Installation of new or modification of existing inlets and storm drains ● Installation of new bicycle lanes (except for multi-use paths - see Special Projects) or sidewalks ● Reconstruction, patching, and/or resurfacing of runways, taxiways/taxilanes, roadways, intersections, bicycle facilities, parking lots, and/or sidewalks where an increase in imperviousness is proposed proposed. ● Unimproved stone/asphalt shoulder and gravel roads - conversion to paved shoulder over Graded Aggregate Base where ground disturbance is proposed proposed. ● Widening of shoulder (permanent) ). ● Replacement of impervious surfaces with permeable surfaces surfaces. ● Upgrades to existing facilities in order to meet requirements for Americans with Disabilities Act (ADA) Act. ● Reconstruction of existing sidewalks and new or existing ADA ramps with more than 250 square feet sq ft of new imperviousness imperviousness. UTILITIES (electric, sewer, water, telephone, marine fuel and fiber optic lines) (10% not required) ● Installation of new utility lines and appurtenances (vaults, manholes, valves, hydrants) ● Replacement of utilities ● Replacement of access crossings ● Replacement of utility crossings ● Directional boring associated with new utility lines repair/replacement ● Repair of existing appurtenances (valves, hydrants, manholes) ● Redecking (no 10% required) ● Bank stabilization (no 10% required) ● Pier/pile (in-kind) (no 10% required) ● Bridge and small structure replacement within the same alignment (10% required) ● Stormwater management facility maintenance and retrofit with over 20,000 square feet sq ft of cutting, clearing, or grubbing of woody vegetation within the existing footprint of the facility, including any maintenance easement for access to the facility facility. ○ No clearing limit for woody vegetation, including in the Buffer ○ Written justification is required for impacts in the Buffer outside of the existing footprint of the facility, or for cutting, clearing, or grubbing of woody vegetation outside of the existing footprint of the facility, including any impacts to the Buffer or cutting, clearing, or grubbing of woody vegetation related to a new access road. Impacts outside the existing footprint of the facility, to the Buffer or to woody vegetation outside the Buffer, shall be mitigated at 1:1. ● Green infrastructure practices that are installed to treat previously untreated impervious surfaces and not otherwise required for a project that meet the following thresholds and requirements: ○ 20,000 square feet sq ft of tree clearing with no more than 5,000 square feet sq ft of clearing in the Buffer ○ Written justification is required if more than 20,000 square feet sq ft is proposed to be cleared ○ Mitigation is provided at 1:1 for all forest or developed woodland clearing, including Buffer clearing Due to the nature of the projects listed below, the threshold limits and mitigation requirements may be varied from that described above. Unless otherwise specified, the Qualifying Parameters in 3.1 above still apply. MDOT SHA may propose additional project types to be added to the eligible special project list below. Upon concurrence by Commission staff, the Chairman will update the Commission at the next Commission meeting of any addition. Nonstructural/Restoration Projects (10% not required) ● No threshold for limit of disturbance or clearing ● Impacts are permitted in the Buffer ● Coordination with DNR, MDE, MHT, USFWS, EPA, NMFS, and USACE occurs ● Planting is provided at a 1:1 ratio for clearing of forest and developed woodland ● Qualifying activities include: ○ Clearing/Removal of more than five (5) hazardous trees ○ Streambank stabilization ○ Revetment above mean high water ○ ▇▇▇▇ or dam construction/removal ○ Wetland creation and waterfowl impoundment construction, provided that no Habitat Protection Areas are impacted, other than the Buffer ○ Low-impact slope stabilization projects that utilize appropriate plantings, low retaining walls or other related landscape stabilization and restoration techniques ○ Stream Restoration Multi-Use Paths (10% is required) ● No threshold for limit of disturbance ● Permanent impacts are permitted in the Buffer of less than 5,000 square feet ● Consistent with DNR Wildlife and Heritage Service requirements and recommendations for Habitat Protection Areas other than the Buffer ● Clearing impacts to forest or developed woodland of no more than 20,000 square feet ● Wetland impacts are permitted, provided all MDE requirements have been met Solar or Photovoltaic Solar (PVS) System Installation (10% is not required if project meets MDE specifications) ● New areas installation, replacement, repair, or removal of vegetative clearing required by FAA solar or DHS regulations which includePVS systems, including interconnection to the power grid ● Directional boring associated with solar or PVS system installation ● Up to 5,000 square feet of new solar panels may be located in the Buffer but are may not limited tobe located further waterward into the Buffer than existing development ● No more than five (5) trees may be cleared, either inside or outside the following: ○ Federal Aviation Regulation Buffer
(FAR1) Part 77 [49 Code Affect a portion of Federal Regulations the Buffer
(CFR2) Part 77], which addresses regulated surfaces such as approach and departure airspace ○ FAA Order 8260.3D United States Standard for Terminal Instrument Procedures (TERPS) which also addresses regulated airspace protection surfaces ○ FAA Advisory Circular 150/5300-13 that provides airfield design standards including Safety Areas, Object Free Areas, Protection Zones and grade limitations ○ FAR Part 139 [14 (CFR), Part 139] and Transportation Security Administration (TSA) Guidelines for General Aviation Airport Operators and Users which address airport security ○ FAA Advisory Circular No. 150/5200-33, “Hazardous Wildlife Attractants on or Near Airports,” which provides wildlife management strategies for airport operators during developmentAlter Buffer vegetation; or
Appears in 1 contract
Sources: Memorandum of Understanding
Eligible Projects. The following is a list of projects that may meet the Qualifying Parameters under Category II. This list is not inclusive of every project and there may be projects not listed below that meet the Qualifying Parameters and can be proposed by MDOT MAA MTA and reviewed by Commission staff CAC under Category II. ● • Category I projects that fail to meet Category I threshold limits ● • Buildings/structures - – new, expansion of existing, replacement, relocation, in-kind, etc. ● • Repairs to salt domes, engine houses, maintenance sheds or replacement of MDOT MAA MTA installations such as fuel storage facilities, navigational aids, and airfield pavement. ● • New/Replacement shore erosion control measures (revetment, bulkheads, living shorelines) up to 500 linear feet in length ● • Installation of new or modification of existing storm drain outfalls ● • Installation of new or modification of existing inlets and storm drains ● • Installation of new bicycle lanes (except for multi-use paths - see Special Projects) or sidewalks • Reconstruction, patching, and/or resurfacing of runways, taxiways/taxilanes, roadways, intersections, bicycle facilities, parking lots, and/or sidewalks where an increase in imperviousness is proposed ● Unimproved stone/asphalt shoulder and gravel roads - conversion to paved shoulder over Graded Aggregate Base where ground disturbance is proposed ● Widening of shoulder (permanent) ● • Replacement of impervious surfaces with permeable surfaces ● • Upgrades to existing facilities in order to meet requirements for Americans with Disabilities Act (ADA) ● • Reconstruction of existing sidewalks and new or existing ADA ramps with more than 250 square feet sqft of new imperviousness ● UTILITIES (electric, sewer, water, telephone, marine fuel and fiber optic lines) (10% not required) • Installation of new utility lines and appurtenances (vaults, manholes, valves, hydrants) ● • Replacement of utilities • Replacement of access crossings • Replacement of utility crossings • Directional boring associated with new utility lines ● repair/replacement • Repair of existing appurtenances (valves, hydrants, manholes) • Redecking (no 10% required) • Bank stabilization (no 10% required) • Pier/pile (in-kind) (no 10% required) • Bridge and small structure replacement within the same alignment (10% required) • Stormwater management facility maintenance and retrofit with over 20,000 square feet sq ft of cutting, clearing, or grubbing of woody vegetation within the existing footprint of the facility, including any maintenance easement for access to the facility ○ facility. o No clearing limit for woody vegetation, including in the Buffer ○ o Written justification is required for impacts in the Buffer outside of the existing footprint of the facility, or for cutting, clearing, or grubbing of woody vegetation outside of the existing footprint of the facility, including any impacts to the Buffer or cutting, clearing, or grubbing of woody vegetation related to a new access road. Impacts outside the existing footprint of the facility, to the Buffer or to woody vegetation outside the Buffer, shall be mitigated at 1:1. ● • Green infrastructure practices that are installed to treat previously untreated impervious surfaces and not otherwise required for a project that meet the following thresholds and requirements: ○ o 20,000 square feet sq ft of tree clearing with no more than 5,000 square feet sq ft of clearing in the Buffer ○ o Written justification is required if more than 20,000 square feet s ft is proposed to be cleared ○ o Mitigation is provided at 1:1 for all forest or developed woodland clearing, including Buffer clearing Due to the nature of the projects listed below, the threshold limits and mitigation requirements may be varied from that described above. Unless otherwise specified, the Qualifying Parameters in 3.1 above still apply. MDOT MTA may propose additional project types to be added to the eligible special project list below. Upon concurrence by Commission staff, the Chairman will update the Commission at the next Commission meeting of any addition. Nonstructural/Restoration Projects (10% not required) ● No threshold for limit of disturbance or clearing ● Impacts are permitted in the Buffer ● Coordination with DNR, MDE, MHT, USFWS, EPA, NMFS, and USACE occurs ● Planting is provided at a 1:1 ratio for clearing of forest and developed woodland ● Qualifying activities include: ○ Clearing/Removal of more than five (5) hazardous trees ○ Streambank stabilization ○ Revetment above mean high water ○ ▇▇▇▇ or dam construction/removal ○ Wetland creation and waterfowl impoundment construction, provided that no Habitat Protection Areas are impacted, other than the Buffer ○ Low-impact slope stabilization projects that utilize appropriate plantings, low retaining walls or other related landscape stabilization and restoration techniques ○ Stream Restoration Multi-Use Paths (10% is required) ● No threshold for limit of disturbance ● Permanent impacts are permitted in the Buffer of less than 5,000 square feet ● Consistent with DNR Wildlife and Heritage Service requirements and recommendations for Habitat Protection Areas other than the Buffer ● Clearing impacts to forest or developed woodland of no more than 20,000 square feet. ● Wetland impacts are permitted, provided all MDE requirements have been met Solar or Photovoltaic Solar (PVS) System Installation (10% is not required if project meets MDE specifications) ● New areas installation, replacement, repair, or removal of vegetative clearing required by FAA solar or DHS regulations which includePVS systems, including interconnection to the power grid ● Directional boring associated with solar or PVS system installation ● Up to 5,000 square feet of new solar panels may be located in the Buffer but are may not limited tobe located further waterward into the Buffer than existing lot coverage ● No more than five (5) trees may be cleared, either inside or outside the following: ○ Federal Aviation Regulation (FAR) Part 77 [49 Code Buffer
1. Affect a portion of Federal Regulations (CFR) Part 77], which addresses regulated surfaces such as approach and departure airspace ○ FAA Order 8260.3D United States Standard for Terminal Instrument Procedures (TERPS) which also addresses regulated airspace protection surfaces ○ FAA Advisory Circular 150/5300-13 that provides airfield design standards including Safety Areas, Object Free Areas, Protection Zones and grade limitations ○ FAR Part 139 [14 (CFR), Part 139] and Transportation Security Administration (TSA) Guidelines for General Aviation Airport Operators and Users which address airport security ○ FAA Advisory Circular Nothe Buffer
2. 150/5200-33, “Hazardous Wildlife Attractants on or Near Airports,” which provides wildlife management strategies for airport operators during developmentAlter Buffer vegetation; or
3. Require establishment of a portion of the Buffer in vegetation.
Appears in 1 contract
Sources: Memorandum of Understanding
Eligible Projects. This category includes maintenance projects which exceed the thresholds of Category I projects as well as new minor construction projects. If required, stormwater management measures must be sufficient to achieve a 10% reduction in pollutant loadings below existing levels. Category II projects must be individually submitted to Commission staff for concurrence as a minor project. Comments from Commission staff must be received and addressed before the activity is commenced. The following is a list of projects that may meet the Qualifying Parameters under Category II. This list is not inclusive of every project and there may be projects not listed below that meet the Qualifying Parameters and can be proposed by MDOT MAA HSMCC and reviewed by Commission CAC staff under Category II. ● Category I projects that fail to meet Category I threshold limits ● Buildings/• New buildings and structures - new, expansion of existing, replacement, relocation, in-kind, etc. ● Repairs to • Expansion or replacement of MDOT MAA installations such as fuel storage facilities, navigational aids, existing buildings and airfield pavement. ● New/Replacement shore erosion control measures (revetment, bulkheads, living shorelines) up to 500 linear feet in length ● structures • Installation of new or modification of existing storm drain outfalls ● • Installation of new or modification of existing inlets and storm drains ● Reconstruction• Installation of new or modification of existing culverts • New or replacement shore erosion control measures (e.g., patchingrevetments, and/or bulkheads, living shorelines) • Reconstruction or resurfacing of runways, taxiways/taxilanes, roadways, intersections, parking lots, and/or sidewalks where an increase in imperviousness is proposed ● Unimproved stone/asphalt shoulder and gravel roads - conversion to paved shoulder over Graded Aggregate Base where ground disturbance is proposed ● Widening of shoulder (permanent) ● Replacement of impervious surfaces with permeable surfaces ● • Upgrades to existing facilities in order to meet requirements for of Americans with Disabilities Act (ADA) ● • Reconstruction of existing sidewalks and new or existing ADA ramps with more than 250 square feet • Reconstruction, patching, and/or resurfacing of new intersections, roads, parking lots, sidewalks, bicycle facilities or other surfaces where there is an increase in imperviousness ● or that does involve the conversion of one type of impervious to another • Installation of new utility lines and appurtenances (vaults, manholes, valves, hydrants) ● Directional boring associated with new • Replacement of existing utility lines ● Stormwater management facility maintenance when serving new development • Replacement of access crossings • Replacement of utility crossings • New pier and retrofit with over 20,000 square feet piles (MDE or Board of cuttingPublic Works authorization is required) • Clearing/Removal of more than five (5) hazardous trees • Streambank stabilization • Wetland creation and waterfowl impoundment construction, clearingprovided that no Habitat Protection Areas are impacted, other than the Buffer • Low-impact slope stabilization projects that utilize appropriate plantings, low retaining walls or grubbing of woody vegetation within other related landscape stabilization and restoration techniques Due to the existing footprint nature of the facilityprojects listed below, including any maintenance easement for access the threshold limits and mitigation requirements may be varied from that described above. Unless otherwise specified, the Qualifying Parameters in 3.1 above apply. HSMCC may propose additional project types to be added to the facility ○ No clearing limit for woody vegetation, including in the Buffer ○ Written justification is required for impacts in the Buffer outside of the existing footprint of the facility, or for cutting, clearing, or grubbing of woody vegetation outside of the existing footprint of the facility, including any impacts to the Buffer or cutting, clearing, or grubbing of woody vegetation related to a new access roadeligible special project list below. Impacts outside the existing footprint of the facility, to the Buffer or to woody vegetation outside the Buffer, shall be mitigated at 1:1. ● Green infrastructure practices that are installed to treat previously untreated impervious surfaces and not otherwise required for a project that meet the following thresholds and requirements: ○ 20,000 square feet of tree clearing with no more than 5,000 square feet of clearing in the Buffer ○ Written justification is required if more than 20,000 square feet is proposed to be cleared ○ Mitigation is provided at 1:1 for all forest or developed woodland clearing, including Buffer clearing ● New areas of vegetative clearing required Upon concurrence by FAA or DHS regulations which include, but are not limited toCommission staff, the following: ○ Federal Aviation Regulation (FAR) Part 77 [49 Code Chairman will update the Commission at the next Commission meeting of Federal Regulations (CFR) Part 77], which addresses regulated surfaces such as approach and departure airspace ○ FAA Order 8260.3D United States Standard for Terminal Instrument Procedures (TERPS) which also addresses regulated airspace protection surfaces ○ FAA Advisory Circular 150/5300-13 that provides airfield design standards including Safety Areas, Object Free Areas, Protection Zones and grade limitations ○ FAR Part 139 [14 (CFR), Part 139] and Transportation Security Administration (TSA) Guidelines for General Aviation Airport Operators and Users which address airport security ○ FAA Advisory Circular Noany addition. 150/5200-33, “Hazardous Wildlife Attractants on or Near Airports,” which provides wildlife management strategies for airport operators during development• Installation of new kayak/canoe launches
Appears in 1 contract
Sources: Memorandum of Understanding