Electrical Work. a. The Registered Practitioner shall (check one): b. If neither of these options is checked, the second option shall be deemed checked if electrical work is included in Exhibit A otherwise the first option shall be deemed checked.
Appears in 2 contracts
Sources: Contract to Plan and Install a Sewerage System, Contract to Install a Sewerage System
Electrical Work. a. The Registered Practitioner shall (check one):
b. If neither of these options is checked, the second option shall be deemed checked if electrical work is included in Exhibit A C otherwise the first option shall be deemed checked.
Appears in 1 contract