Earthing. 33.1 The Service Provider must comply with the earthing requirements set out in the LFC's earthing standards and requirements as published by the LFC on ▇▇▇.▇▇▇▇▇▇.▇▇▇.▇▇ or otherwise advised by the LFC to the Service provider from time to time. 33.2 The LFC will install a 95 or 120 mm2 green earth cable to an earth bar at the end of each row for the connection of Service Provider Equipment. 33.3 The Service Provider's racks and cabinets must be isolated from the building. Isolation must be tested and verified to be 5 Mohm at 100 Volts before connecting to the earth grid. 33.4 Every cabinet or rack must be joined to the earth grid cable by a 6 mm2 green cable. 33.5 Joints of 2 or 4 cabinet or rack cables must be made every 1,200 mm using a crimp tee or line tap connector. 33.6 All earthing schemes at a Central Office must be approved by the LFC. 33.7 All connections to existing earthing systems (including connections from cabinets, racks and signal cabling) must be to the earth bar. The LFC will approve cable sizes and quantities. 33.8 Cable screens must be earthed at the LFC end only, not at the Service Provider's end.
Appears in 2 contracts
Sources: Ufb Services Agreement, Ufb Services Agreement
Earthing. 33.1 The Service Provider must comply with the earthing requirements set out in the LFC's earthing standards and requirements as published by the LFC on ▇▇▇.▇▇▇▇▇▇▇▇▇.▇▇▇.▇▇ or otherwise advised by the LFC to the Service provider from time to time.
33.2 The LFC will install a 95 or 120 mm2 green earth cable to an earth bar at the end of each row for the connection of Service Provider Equipment.
33.3 The Service Provider's racks and cabinets must be isolated from the building. Isolation must be tested and verified to be 5 Mohm at 100 Volts before connecting to the earth grid.
33.4 Every cabinet or rack must be joined to the earth grid cable by a 6 mm2 green cable.
33.5 Joints of 2 or 4 cabinet or rack cables must be made every 1,200 mm using a crimp tee or line tap connector.
33.6 All earthing schemes at a Central Office must be approved by the LFC.
33.7 All connections to existing earthing systems (including connections from cabinets, racks and signal cabling) must be to the earth bar. The LFC will approve cable sizes and quantities.
33.8 Cable screens must be earthed at the LFC end only, not at the Service Provider's end.
Appears in 2 contracts
Sources: Ultrafast Fibre Ufb Services Agreement, Ufb Services Agreement
Earthing. 33.1 31.1 The Service Provider Access Seeker must comply with the earthing requirements set out in the LFC's earthing standards and requirements as published by the LFC on ▇▇▇.▇▇▇▇▇▇▇▇▇.▇▇▇.▇▇ or otherwise advised by the LFC to the Service provider from time to time.
33.2 31.2 The LFC will install a 95 or 120 mm2 green earth cable to an earth bar at the end of each row for the connection of Service Provider Access Seeker Equipment.
33.3 31.3 The Service ProviderAccess ▇▇▇▇▇▇'s racks and cabinets must be isolated from the building. Isolation must be tested and verified to be 5 Mohm at 100 Volts before connecting to the earth grid.
33.4 31.4 Every cabinet or rack must be joined to the earth grid cable by a 6 mm2 green cable.
33.5 31.5 Joints of 2 or 4 cabinet or rack cables must be made every 1,200 mm using a crimp tee or line tap connector.
33.6 31.6 All earthing schemes at a Central Office must be approved by the LFC.
33.7 31.7 All connections to existing earthing systems (including connections from cabinets, racks and signal cabling) must be to the earth bar. The LFC will approve cable sizes and quantities.
33.8 31.8 Cable screens must be earthed at the LFC end only, not at the Service ProviderAccess Seeker's end.
Appears in 1 contract
Sources: Wholesale Services Agreement
Earthing. 33.1 The Service Provider must comply with the earthing requirements set out in the LFC's earthing standards LFC document "Transmission Stations Earthing Connections" (reference 0033) and requirements as published by the LFC on ▇▇▇.▇▇▇▇▇▇.▇▇▇.▇▇ or otherwise advised by document "Earthing Systems for the LFC to the Service provider from time to timeSites" (reference ND0335).
33.2 The LFC will install a 95 or 120 mm2 green earth cable to an earth bar at the end of each row for the connection of Service Provider Equipment.
33.3 The Service Provider's racks and cabinets must be isolated from the building. Isolation must be tested and verified to be 5 Mohm at 100 Volts before connecting to the earth grid.
33.4 Every cabinet or rack must be joined to the earth grid cable by a 6 mm2 green cable.
33.5 . Joints of 2 or 4 cabinet or rack cables must be made every 1,200 mm using a crimp tee or line tap connector.
33.6 33.5 All earthing schemes at a Central Office must be approved by the LFC.
33.7 33.6 All connections to existing earthing systems (including connections from cabinets, racks and signal cabling) must be to the earth bar. The LFC will approve cable sizes and quantities.
33.8 33.7 Cable screens must be earthed at the LFC end only, not at the Service Provider's end.
Appears in 1 contract
Sources: Ufb Services Agreement
Earthing. 33.1 34.1 The Service Provider must comply with the earthing requirements set out in the LFC's earthing standards LFC document "Transmission Stations Earthing Connections" (reference 0033) and requirements as published by the LFC on ▇▇▇.▇▇▇▇▇▇.▇▇▇.▇▇ or otherwise advised by document "Earthing Systems for the LFC to the Service provider from time to timeSites" (reference ND0335).
33.2 34.2 The LFC will install a 95 or 120 mm2 green earth cable to an earth bar at the end of each row for the connection of Service Provider Equipment.
33.3 34.3 The Service Provider's racks and cabinets must be isolated from the building. Isolation must be tested and verified to be 5 Mohm at 100 Volts before connecting to the earth grid.
33.4 34.4 Every cabinet or rack must be joined to the earth grid cable by a 6 mm2 green cable.
33.5 . Joints of 2 or 4 cabinet or rack cables must be made every 1,200 mm using a crimp tee or line tap connector.
33.6 34.5 All earthing schemes at a Central Office must be approved by the LFC.
33.7 34.6 All connections to existing earthing systems (including connections from cabinets, racks and signal cabling) must be to the earth bar. The LFC will approve cable sizes and quantities.
33.8 34.7 Cable screens must be earthed at the LFC end only, not at the Service Provider's end.
Appears in 1 contract
Sources: Ufb Services Agreement
Earthing. 33.1 The Service Provider must comply with the earthing requirements set out in the LFC's earthing standards and requirements as published by the LFC on ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇.▇▇ or otherwise advised by the LFC to the Service provider from time to time.
33.2 The LFC will install a 95 or 120 mm2 green earth cable to an earth bar at the end of each row for the connection of Service Provider Equipment.
33.3 The Service Provider's racks and cabinets must be isolated from the building. Isolation must be tested and verified to be 5 Mohm at 100 Volts before connecting to the earth grid.
33.4 Every cabinet or rack must be joined to the earth grid cable by a 6 mm2 green cable.
33.5 Joints of 2 or 4 cabinet or rack cables must be made every 1,200 mm using a crimp tee or line tap connector.
33.6 All earthing schemes at a Central Office must be approved by the LFC.
33.7 All connections to existing earthing systems (including connections from cabinets, racks and signal cabling) must be to the earth bar. The LFC will approve cable sizes and quantities.
33.8 Cable screens must be earthed at the LFC end only, not at the Service Provider's end.
Appears in 1 contract
Sources: Ufb Services Agreement
Earthing. 33.1 31.1 The Service Provider must comply with the earthing requirements set out in the LFC's earthing standards and requirements as published by the LFC on ▇▇▇.▇▇▇▇▇▇▇▇▇.▇▇▇.▇▇ or otherwise advised by the LFC to the Service provider from time to time.
33.2 31.2 The LFC will install a 95 or 120 mm2 green earth cable to an earth bar at the end of each row for the connection of Service Provider Equipment.
33.3 31.3 The Service Provider's racks and cabinets must be isolated from the building. Isolation must be tested and verified to be 5 Mohm at 100 Volts before connecting to the earth grid.
33.4 31.4 Every cabinet or rack must be joined to the earth grid cable by a 6 mm2 green cable.
33.5 31.5 Joints of 2 or 4 cabinet or rack cables must be made every 1,200 mm using a crimp tee or line tap connector.
33.6 31.6 All earthing schemes at a Central Office must be approved by the LFC.
33.7 31.7 All connections to existing earthing systems (including connections from cabinets, racks and signal cabling) must be to the earth bar. The LFC will approve cable sizes and quantities.
33.8 31.8 Cable screens must be earthed at the LFC end only, not at the Service Provider's end.
Appears in 1 contract
Sources: Ufb Services Agreement