Earthing Sample Clauses

Earthing. Include system to be used (electrodes, deep earth mesh or other), as well as sizes and section of the elements to be used.
AutoNDA by SimpleDocs
Earthing. 33.1 The Service Provider must comply with the earthing requirements set out in the LFC's earthing standards and requirements as published by the LFC on xxx.xxxxxxxxx.xx.xx or otherwise advised by the LFC to the Service provider from time to time.
Earthing. All racks are earthed. The Service Provider is responsible for the provision, installation and maintenance of earthing of all their equipment within the NBI provided Co-Location rack space. NBI will be responsible for earthing the rack.
Earthing. Bonded to earth terminal in normal operation In “island operation” earth mat / rod neutral – earth contractor Generator winding – unearthed Generator winding – star connected Part 3 Annex 4 – Diagram of Customer’s Installation [Include schematic diagram] Part 4Location Plan
Earthing. System Appendix ' c' Page No-3 Supply, installation, commissioning and testing of the earthing system including cost of the following 3 meter long of 5/8"dia tinned copper electrodes. up-to water level including cost of boring and lowering complete with clamp and 2 X 25mm2 stranded copper conductor from copper rod to ground surface in 1-1/2” uPVC Pipe class D with watering cap manhole with cover as per detail complete in all respects. and the resistance should up to 1-3 Ohms. the installation / test should be conducted in presence of engineer inchage. Job 2 44138 4.2
Earthing. The Consumer shall not combine the neutral and protective functions in a single conductor at the Consumer’s installation. The Consumer is advised that the supply voltage, frequency and earthing are subject to the requirements specified by Electricity (Safety, Quality and Continuity) Regulations made by the Gazette Extraordinary No.1975/44 dated 2016.07.13 and any amendment thereto.
AutoNDA by SimpleDocs
Earthing. Testing Facilities, Cable boxes and painting: Each Tee-off fuse switch and main circuit disconnector switch shall be provided with facilities for carrying out applied high voltage tests and injected current tests on the feeder connected to the switch and this shall be effected by the insertion of a three phase plug in testing device when the switch is in the “Earth” position, to become effective when the switch is in the “OFF” position. Four sets of these test plugs shall be supplied under this contract the cost of which deemed to be included in the contract prices. Tests access covers shall be provided with padlocking facilities and fully water proofed. If SF6 R.M.U's where offered, gas pressure gage shall be supplied with test plug mentioned above. Each equipment shall be provided with a main earth bar of not less than 40 mm X 2.5 h.d.
Earthing. The maximum earth fault current shall be 3 kA for 1 second, all earthing connections shall be provided with M12 details.
Earthing. There shall be two independent earthing stations at least 3 meters away from the pump room. The earthing shall consist of an earth tape connected to an independent plate made of C.I. having a conductivity of not less than 100% international standard. All electrical apparatus, cable boxes and sheath/ armour clamps shall be connected to the main bar by means of branch earth connections of appropriate size. All joints in the main bar and branch bar shall have the lapping surface properly tinned to prevent oxidation. The joints shall be revetted and sweathed. Earth plates shall be buried in a pit 1.2 x 1.2 meter a minimum depth of 3 meter below the ground. The connections between the main bars shall be made by means of three 10 mm brass studs and fixed at 100 mm centres. The pit shall filled with coke breeze, rock salt and loose soil. A.G.I.Pipe of 20mm i/d. with perforationon the periphery shall be placed vertically over the plate to reach ground level for watering. A brick masonry manhole 30 x 30 x 30 cm. size shall be provided to surround the pipe for inspection. A bolted removable link connecting main bar outside the pit portion leading to the plate shall be accommodated in this manhole for testing.