Design Development/ Construction Documents Sample Clauses

Design Development/ Construction Documents. Upon release for design implementation, design drawings and specifications appropriate for bidding and construction of the project will be prepared. Drawings will be prepared utilizing existing CAD standards and procedures. We currently anticipate that the following drawings will be required: Architectural County of Santa Solid Waste Services CONSULTANTS 0306 • • • • • • • • • • • • • • Civil • • • • • Title sheet Handicap Compliance Building Code Compliance Site Plan Scale Bldg Floor Plan Scale Bldg Ceiling Plan Scale Bldg Roof Plan Details Scale Bldg Sections Scale Bldg Elevations Scale Bldg Exterior Detail Scale Bldg Interior Detail Public Recycle Plan Public Recycle Sections Elevations Title 24 Forms Civil General Notes Details Site Plan/ Grading Paving Site Utility Plan Sewage Treatment Plan Detail Civil Detail Structural • Structural General Notes Detail • Scale Bldg Framing Plans Elevations • Scale Bldg Foundation Plan Detail • Scale Bldg Details • Scales Plans Details • Public Recycle Plans Detail • Public Recycle Canopy Plan Detail Mechanical • HVAC Calculations • Equip Arrangement • Bldg Fire Protection Dwg • Site Utility • Plumbing Plan Isometric Electrical • One-Line Diagrams • Scale Bldg Powr • Scale Bldg Lighting • Yard Lighting • Code Compliance Documents Specified items will be identified in the drawings via call-outs and short notations. A review will be conducted at the completion of design development to confirm that the engineering meets the County of Santa
AutoNDA by SimpleDocs

Related to Design Development/ Construction Documents

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager:

  • Agreement Construction Headings or captions to the provisions of this Agreement are solely for the convenience of the parties, are not part of this Agreement, and shall not be used to interpret or determine the validity of this Agreement. Any ambiguity in this Agreement shall not be construed against the drafter, but rather the terms and provisions hereof shall be given their reasonable interpretation.

Time is Money Join Law Insider Premium to draft better contracts faster.