Description Requirement. Drawing Number(s) SV575SA Issue 1-Assembly SV323SA Issue 1 Assembly SV3413 Issue 2–Body SV3416 issue 2 - Lid Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 22 Inspection & Pre- preparation ▇▇▇ ▇▇▇▇ 81-102 – Section 2 & Section 3 Paragraph 8 Additional Work: Provisional leak test - submerge in water at ambient temperature for 30 seconds. Surface Preparation External ▇▇▇ ▇▇▇▇ 81-102 – Section 3 Paragraph 9.2 Including: Raw Material – Condition A 1. Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 is to be applied using metallic abrasives Finish – Sa2 as Table 1 BS EN ISO 8501-1:2007(E) Raw Material – Condition B Additional Work: 1. For Heavy Soiling -High Pressure Water Washing (Prior to abrasive cleaning – Method D2) and/or 2. For Powder Coating – Plastic Media Stripping or Aluminium Oxide/Silicone Carbide to Method D2 Surface Preparation Internal Raw Material – Condition A 1. Hand cloth cleaning and where necessary Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D5 Finish – St2 as Table 2 BS ISO EN8501-1:2007(E) 2. Final hand cloth cleaning Raw Material – Condition B Additional Work: 1. For Heavy Soiling - High Pressure Water Washing (Prior to D2 abrasive cleaning) and/or 2. For Corrosion - Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 using metallic abrasives Finish – Sa2 as Table 1 BS ISO EN8501-1:2007(E) Use Block Gauge to ensure the internal volumetrics of specified containers have not been compromised by previous damage, distortion and/or refurbishment. Sides of container are to be rendered square and the wings of the container lid are to be eased and any deflection removed. Painting – External ▇▇▇ ▇▇▇▇ 81-102 Section 3 Paragraph 10 Paint, Sprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY Table 2 – Stoving Process Painting – Internal Raw Material – Condition A 1. Light Paint Spray, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25/80-27 Raw Material – Condition B - subjected to D2 abrasive cleaning 2. Light Paint Spray, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY Testing Pressure Test to ▇▇▇ ▇▇▇▇ 81-102 Section 4 Post Refurbishment Inspection Visual comparison is to be made with the appropriate ‘master component’ Check wire locking tabs to ensure free from blockage. Check catches/hinges function and operation. Check handles for function and operation Inspect inside of the component to ensure that the coating is clean and free from dirt and dust. The lid is to be removed and placed loosely onto the container for transit purposes. Touch up paint work as required. Marking ▇▇▇ ▇▇▇▇ 81-102 Section 5 Paragraph 12 Quantity of refurbished containers per pallet 48
Appears in 1 contract
Description Requirement. Drawing Number(s) SV575SA Issue 1-Assembly SV323SA SV518A Issue 1 Assembly SV3413 Issue 2–Body SV3416 issue 2 - Lid Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 22 11 Inspection & Pre- preparation ▇▇▇ ▇▇▇▇ 81-102 – Section 2 & Section 3 Paragraph 8 Additional Work: Provisional leak test - submerge in water at ambient temperature for 30 secondsCheck integrity and service date of internal cushioning pads SV2958. Internal pads older than 5-years are to be replaced Remove split, torn, damaged components. Remove any foreign bodies located behind pads Surface Preparation External ▇▇▇ ▇▇▇▇ 81-102 – Section 3 Paragraph 9.2 Including: Raw Material – Condition A 1. Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 is to be applied using metallic abrasives Finish – Sa2 as Table 1 BS EN ISO 8501-1:2007(E) Raw Material – Condition B Additional Work: 1. For Heavy Soiling -High Pressure Water Washing (Prior to abrasive cleaning – Method D2) and/or 2. For Powder Coating – Plastic Media Stripping or Aluminium Oxide/Silicone Carbide to Method D2 Surface Preparation Internal Raw Material – Condition A 1. Hand cloth cleaning and where necessary Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D5 Finish – St2 as Table 2 BS EN ISO EN85018501-1:2007(E) 2. Final hand cloth cleaning Raw Material – Condition B Additional Work: 1. For Heavy Soiling - High -High Pressure Water Washing (Prior to D2 abrasive cleaning) and/or 2. For Corrosion - Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 using metallic abrasives D5 (non blasting because of historical grit ingress and entrapment in various areas of the container which is subsequently difficult to remove) Finish – Sa2 S2 as Table 1 2 BS EN ISO EN85018501-1:2007(E) Use Block Gauge to ensure the internal volumetrics of specified containers have not been compromised by previous damage, distortion and/or refurbishment. Sides of container are to be rendered square and the wings of the container lid are to be eased and any deflection removed. Painting – External ▇▇▇ ▇▇▇▇ 81-102 Section 3 Paragraph 10 Paint, Sprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY Table 2 – Stoving Process Painting – Internal Raw Material – Condition A 1. Light Paint SpraySprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25/80-27 2. Replace those cushioning pads identified missing or removed during inspection stage Raw Material – Condition B - subjected to D2 D5 abrasive cleaning 21. Light Paint SpraySprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY 2. Fit full set of replacement cushioning pads. Pads to be marked with part no and year of manufacture Testing Pressure Test to ▇▇▇ ▇▇▇▇ 81-102 Section 4 N/A Post Refurbishment Inspection Visual comparison is to be made with the appropriate ‘master component’ Check wire locking tabs to ensure free from blockage. Check catches/hinges function and operation. Check handles for function and operation Inspect inside of the component to ensure that the coating is clean and free from dirt and dust. The lid is to be removed and placed loosely onto the container for transit purposes. Touch up paint work as required. Marking ▇▇▇ ▇▇▇▇ 81-102 Section 5 Paragraph 12 Quantity of refurbished containers per pallet 4824
Appears in 1 contract
Description Requirement. Drawing Number(s) SV575SA SV547AAS Issue 1-Assembly SV323SA 4 W1093 Pad Issue 1 Assembly SV3413 SV2809 Guide Plate Issue 2–Body SV3416 issue 2 - Lid 5 Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 22 12 Inspection & Pre- preparation ▇▇▇ ▇▇▇▇ 81-102 – Section 2 & Section 3 Paragraph 8 - Additional Work: Provisional leak test - submerge in water at ambient temperature Check integrity and service date of internal cushioning pads W1093. Internal pads older than 5-years are to be replaced. Position double- sided pressure sensitive tapee to BS 7116 (F) as replacement for 30 secondsadhesive rubber no 5 to locate W1093 Pads. Remove split, torn, damaged components. Remove any foreign bodies located behind pads Check integrity of internal guide plates SV2809. Remove damaged or corroded components. New replacement guide plates are to be manufactured from electrolytic tin plate sheet to BS EN 10202:2001 BA thickness 0.3mm, coating 2.8/2.8, T48 and to be treated with application of clear lacquer Firwood 89. Surface Preparation External ▇▇▇ ▇▇▇▇ 81-102 – Section 3 Paragraph 9.2 9.2. Including: Raw Material – Condition A 1. Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 is to be applied using metallic abrasives Finish – Sa2 as Table 1 BS EN ISO 8501-1:2007(E) Raw Material – Condition B Additional Work: 1. For Heavy Soiling -High Pressure Water Washing (Prior to abrasive cleaning – Method D2) and/or 2. For Powder Coating – Plastic Media Stripping or Aluminium Oxide/Silicone Carbide to Method D2 Surface Preparation Internal Raw Material – Condition A 1. Hand cloth cleaning and where necessary Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D5 Finish – St2 as Table 2 BS ISO EN8501-1:2007(E) 2. Final hand cloth cleaning Raw Material – Condition B Additional Work: 1. For Heavy Soiling - – Remove all internal cushioning pads followed by High Pressure Water Washing (Prior to D2 abrasive cleaning) and/or 2. For Corrosion - Remove all internal cushioning pads followed by Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 using metallic abrasives Finish – Sa2 as Table 1 BS EN ISO EN85018501-1:2007(E) Use Block Gauge to ensure the internal volumetrics of specified containers have not been compromised by previous damage, distortion and/or refurbishment. Sides of container are to be rendered square and the wings of the container lid are to be eased and any deflection removed. Painting – External ▇▇▇ ▇▇▇▇ 81-102 Section 3 Paragraph 10 Paint, Sprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY - Table 2 – Stoving Process Painting – Internal Raw Material – Condition A 1. Light Paint Spray, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25/80-27 Raw Material – Condition B - subjected to D2 abrasive cleaning 2. Light Paint Spray, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY Testing Pressure Test to ▇▇▇ ▇▇▇▇ 81-102 Section 4 Post Refurbishment Inspection Visual comparison is to be made with the appropriate ‘master component’ Check wire locking tabs to ensure free from blockage. Check catches/hinges function and operation. Check handles for function and operation Inspect inside of the component to ensure that the coating is clean and free from dirt and dust. The lid is to be removed and placed loosely onto the container for transit purposes. Touch up paint work as required. Marking ▇▇▇ ▇▇▇▇ 81-102 Section 5 Paragraph 12 Quantity of refurbished containers per pallet 48Process
Appears in 1 contract