Description Requirement Sample Clauses

A Description Requirement clause obligates one or both parties to provide detailed and accurate descriptions of certain items, services, or obligations under the contract. This may involve specifying the characteristics, quality, or scope of goods to be delivered, or outlining the precise nature of services to be performed. By requiring clear and comprehensive descriptions, the clause helps prevent misunderstandings and disputes by ensuring all parties have a shared understanding of what is expected.
Description Requirement. Drawing Number(s) SV57AS1 & S2 Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 9 Inspection & Pre- preparation ▇▇▇ ▇▇▇▇ 81-102 – Section 2 Additional Work: Ensure End Plate (Item 3 of SV57A) is present Surface Preparation External ▇▇▇ ▇▇▇▇ 81-102 – Section 3 Paragraph 9.2 Including: Raw MaterialCondition A 1. Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 is to be applied using metallic abrasives Finish – Sa2 as Table 1 BS EN ISO 8501-1:2007(E) Raw Material – Condition B Additional Work: 1. For Heavy Soiling -High Pressure Water Washing (Prior to abrasive cleaning – Method D2) and/or 2. For Powder Coating – Plastic Media Stripping or Aluminium Oxide/Silicone Carbide to Method D2 Surface Preparation Internal Raw Material – Condition A 1. Hand cloth cleaning and where necessary Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D5 Finish – St2 as Table 2 BS ISO EN8501-1:2007(E) 2. Final hand cloth cleaning Raw Material – Condition B Additional Work: 1. For Heavy Soiling – High Pressure Water Washing (Prior to D2 abrasive cleaning) and/or 2. For Corrosion - Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 using metallic abrasives Finish – Sa2 as Table 1 BS EN ISO 8501-1:2007(E) Painting – External ▇▇▇ ▇▇▇▇ 81-102 Section 3 Paragraph 10 Paint, Sprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY Table 2 – Stoving Process Painting – Internal Raw Material – Condition A 1. Light Paint Sprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25/80-27 Raw Material – Condition B - subjected to D2 abrasive cleaning 2. Light Paint Sprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue Testing N/A Post Refurbishment Inspection Visual comparison is to be made with the appropriate ‘master component’ Check wire locking tabs to ensure free from blockage. Check catches/hinges function and operation. Check handles for function and operation Inspect inside of the component to ensure that the coating is clean and free from dirt and dust. Touch up paint work as required. Marking ▇▇▇ ▇▇▇▇ 81-102 Section 5 Paragraph 12 Quantity of refurbished containers per pallet 32 Drawing Number(s) SV504GA Issue 7 SV2783 Issue 2 SV3009 Issue 3 SV3005 Issue 6 Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 10 Inspection & Pre-preparation ▇▇▇ ▇▇▇▇ 81-102 – Section 2 Additional Work: Ensure Fixed End Plate and (removable end plate) SV2783 are present Check integrity and service date of internal cushioning pads SV3009. Internal pads older than 5-years are to be replaced. All new replacement ...
Description Requirement. There shall be a job description for each of the positions named in this CONTRACT which are to be maintained by the BOARD in the Human Resources Department. The ASSOCIATION shall be given a copy of each of these job descriptions.
Description Requirement. Drawing Number(s) W865 – Main Frame W903 – Frame Assembly (As used with Ammunition Container L30A4) W904 – Main Frame, Sub Assembly W907 – Rear Panel (Aluminium) SV695A Issue 2-Pallet with Beech Wood Bearers SV3789 – Pallet Bearer (Wooden) SV4096 – Pallet Bearer (Wooden) SV3565 Pallet Leg SV3568 Pallet Leg SV4097 Pallet Leg SV4098 Pallet Leg SV4099 Corner Plate SV4100 Corner Plate SV3564 Centre Plate SV4111 Issue 1-Board (Plywood) SV4081 Issue 1-Side Panel (Aluminium) W908 – Gate Assembly (As used with Ammunition Container L30A4) W910 – Gate Panel (Aluminium) SV384SA-Latch Gate SV4116-Bracket SV4117-Bolt SV4070-Pin SV3753-Retainer SV385SA-Latch Gate SV4114-Bracket SV4115-Bolt SV4070-Pin SV3753-Retainer SV749A Issue 2 – Helitubes (As used with Ammunition Container L30A2/A3) DT500049 –Reducing ▇▇▇▇ SV403SA – Helitube Body SV4386 – ▇▇▇▇ SV4387 – Diaphragm SV4388 - ▇▇▇▇ SV4122 Issue 1 – Base Board (As used with Ammunition Container L30A4) (Plywood) Material Steel/Wood/Aluminium Colour(s) BS381c - 499 Service Brown Contract Item Number 26 Inspection & Pre- preparation Check modification to SK500036 on frame and door has been carried out making it an L30A2/B2; exchange if not modified. Check integrity and condition of Frame Assembly -W903 including Board SV4111, Side Panel SV4081, Base Board SV4122 and Rear Panel W907. Those worst than the minimum pre refurbishment acceptable visual standard are to be rejected and exchanged or replaced. Those worse than the minimum pre refurbishment acceptable visual standard and fail integrity-check are to be rejected and exchanged or replaced. Any split, delaminated and or punctured wood is to be replaced. Check integrity and condition and ISPM 15 compliancy/marking of the bearers (SV3789/4096) on SV695A-Pallet Assembly and exchange or replace. As long as inherent cracks in wood are not aligned rivet to rivet the bearer can be conditioned fit for purpose. Those worse than the minimum pre refurbishment acceptable visual standard and fail integrity- check are to be rejected and exchanged or replaced. Checking integrity and function of Gate Assembly W908, including latches SV384SA & SV385SA and Gate Panel Aluminium W910. Those worse than the minimum pre refurbishment acceptable visual standard are to be rejected and exchanged or replaced. Remove Shell helitubes and check they are an L421A3 (SV749A). If any are an L421A2 or L421A4, replace. Check integrity and condition including presence of SV4387 Diaphragm, SV4388 ▇▇▇▇ and SV438...
Description Requirement. Drawing Number(s) SV575SA Issue 1-Assembly SV323SA Issue 1 Assembly SV3413 Issue 2–Body SV3416 issue 2 - Lid Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 22 Inspection & Pre- preparation ▇▇▇ ▇▇▇▇ 81-102 – Section 2 & Section 3 Paragraph 8 Additional Work: Provisional leak test - submerge in water at ambient temperature for 30 seconds. Surface Preparation External ▇▇▇ ▇▇▇▇ 81-102 – Section 3 Paragraph 9.2 Including: Raw MaterialCondition A 1. Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 is to be applied using metallic abrasives Finish – Sa2 as Table 1 BS EN ISO 8501-1:2007(E) Raw Material – Condition B Additional Work: 1. For Heavy Soiling -High Pressure Water Washing (Prior to abrasive cleaning – Method D2) and/or 2. For Powder Coating – Plastic Media Stripping or Aluminium Oxide/Silicone Carbide to Method D2 Surface Preparation Internal Raw Material – Condition A 1. Hand cloth cleaning and where necessary Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D5 Finish – St2 as Table 2 BS ISO EN8501-1:2007(E) 2. Final hand cloth cleaning Raw Material – Condition B Additional Work: 1. For Heavy Soiling - High Pressure Water Washing (Prior to D2 abrasive cleaning) and/or 2. For Corrosion - Abrasive Cleaning - ▇▇▇ ▇▇▇▇ 03-2 Method D2 using metallic abrasives Finish – Sa2 as Table 1 BS ISO EN8501-1:2007(E) Use Block Gauge to ensure the internal volumetrics of specified containers have not been compromised by previous damage, distortion and/or refurbishment. Sides of container are to be rendered square and the wings of the container lid are to be eased and any deflection removed. Painting – External ▇▇▇ ▇▇▇▇ 81-102 Section 3 Paragraph 10 Paint, Sprayed, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY Table 2 – Stoving Process Painting – Internal Raw Material – Condition A 1. Light Paint Spray, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25/80-27 Raw Material – Condition B - subjected to D2 abrasive cleaning 2. Light Paint Spray, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 - ONLY Testing Pressure Test to ▇▇▇ ▇▇▇▇ 81-102 Section 4 Post Refurbishment Inspection Visual comparison is to be made with the appropriate ‘master component’ Check wire locking tabs to ensure free from blockage. Check catches/hinges function and operation. Check handles for function and operation Inspect inside of the component to ensure that the coating is clean and free from dirt and dust. The lid is to be removed and placed loosely onto the container for transit purposes. Touch up paint work as r...
Description Requirement. Drawing Number(s) SV528A Issue 3 SV281SA - Body - including Items 1-5 (item 4 O seal) Issue 2 SV3000 – Cap issue 4 SV2616 – Issue 4 SV2519 – Issue 6 Material Polyethylene HD Colour(s) Green Contract Item Number 13a Inspection & Pre- preparation Inspected internally and externally for cracking, splits and deformation. Check integrity, fit, form and function of straps Remove and inspect carrying strap assembly (SV2616 & SV2519) for any signs of tearing or failure and replace as necessary. Inspect caps and integrity of nipples and top-pads Provisional leak test - submerge in water at ambient temperature for 30 seconds. Removal ‘O’ Ring seals. Rubber O seal to specification BS1806: Size 0S 64: Material BS 1154 Z40 Surface Preparation External The outer surfaces of the cap and body should have all extraneous coating removed including labels, stickers, adhesives and paint. Scraping is permissible as is pre-soaking in water to facilitate label removal. When the physical removal of the self adhesive label cannot be achieved by the agreed non-chemical process, only the use of Xylene is authorised to assist in the removal of any extraneous coating Surface Preparation Internal The inner surfaces of the cap and body should be cleaned and free from dirt and or staining. Warm water is acceptable for cleaning but component should be fully dried. No moisture is to be present following this operation. Detergents or Solvents are not be used. Painting – External N/A Painting – Internal N/A Testing Fit new rubber O seal to specification BS1806: Size 0S 64: Material BS 1154 Z40 Secure cap to body. Torque Setting 200 lb inches +15/-0 lbs Pressure Test - No Leaks with Pressure differential of 5lbs per square inch for 1 minute Post Refurbishment Inspection Refit carrying strap assembly Visual comparison is to be made with the appropriate ‘master component’ After testing item is to thoroughly dried and lids are adjusted to hand tight fixing. Marking Apply adhesive paper label - 15mm in diameter – green background. Lettering shall be white and include the following information in the order shown: Company monogram (two digits only) – height 4mm. The word ACCEPTED - height 3mm The last two digits of the year of testing/refurbishment – height 4mm. Quantity of refurbished containers per pallet 2 tube is to be housed inside item 13 (C375 Mk1 AC) prior to dispatch
Description Requirement. Drawing Number(s) VM433700001 Issue 3 Drg VM433700001 (Item 9) - Cushioning Pads Drg VM433700001 (Item 10 - Cushioning Pads Drg VM433700001 (item11) - Cushioning Pads Drg VM433700001 (item12) - Cushioning Pads Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 28 Inspection & Pre- preparation ▇▇▇ ▇▇▇▇ 81-102 – Section 2 Additional Work: Check integrity and service date of internal cushioning pads Items 9 to 12. Internal pads older than 5-years are to be replaced. Position double-sided pressure sensitive tape to BS 7116 (F), as replacement for rubber adhesive No5, prior to the location of the new pads. Pads are to be marked as follows: VM 433.700.001 - item 9&10 VM 433.700.001 - item 11 VM 433.700.001 - item 12 Remove split, torn, damaged components. Remove any foreign bodies located behind pads ▇▇▇ ▇▇▇▇ 81-116 Type GP Grade C
Description Requirement a) Type Battery Operated Self-Propelled Mast Boom Lift. (AWP is to be manuvered around intricate places, hence Mast Boom Lift is required. Articulated type AWP is not acceptable. b) Working Height (minimum) 11.8 m c) Platform Height (Elevated) (minimum) 9.8 m d) Horizontal Outreach (approx) 4 m
Description Requirement. Drawing Number(s) SV856GA Issue 1 RCD14380A RCD13635A DDL1633 Material Wood Colour(s) BS381c - 499 Service Brown Contract Item Number 5 & 5a Inspection & Pre- preparation Additional Work Remove inner tin plate body and lid checking condition and completeness in accordance with drawing numbers RCD14380A & RCD13635A. Body and lid should be free from rust and damage. Those worst than the minimum pre refurbishment acceptable visual standard are to be rejected. Remove inner wooden frame checking condition and completeness in accordance with Drg DDL1633 Inspect the C1 container for condition and the integrity of body, lid and carrying handle. Containers where screws are visibly protruding or visible as a result of damage to wood supports and batons are to be removed and replaced. All wood used in refurbishment should be ISPM treated. Worn, damaged, splintered and crushed wooden batons and supports are to be replaced. Missing and or damaged corner supports and handles are to be replaced. Comfort grips on handles are to be replaced if damaged and or torn by non-plastic components. Containers identified with excessive splits, cracks, mould and/or decay worst than the minimum pre refurbishment acceptable visual standard are considered to be beyond economic repair are to be rejected Surface Preparation External The outer surfaces of the C1 container should have all extraneous coating removed e.g. labels, stickers and/or adhesives. The existing painted surface is to be sanded and cleaned ensuring all previous munitions marking information, flaking or blistering paint is removed and the resultant surface prepared to ensure a uniform paint finish. Surface Preparation Internal The inner surfaces of the C1 container should have all extraneous coating removed e.g. labels, stickers and/or adhesives. Remove ▇▇▇▇▇ from surfaces. The existing painted surface is to be sanded and cleaned ensuring all previous munitions marking information, flaking or blistering paint is removed and the resultant surface prepared to ensure a uniform paint finish. Painting – External 2-Coats of Sprayed Paint, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 – Issue 5 Table 2 – Stoving Process Painting – Internal Light Paint Spray inner surface of the container lid, Semi-Gloss as ▇▇▇ ▇▇▇▇ 80-25 Testing Handle integrity - Load test - Minimum 300lb for period of 5 minutes – Specification L9708 Post Refurbishment Inspection Inspect inside the C1 Mk1 A1 Container to ensure that the coating is clean and free from dirt and ...
Description Requirement. Drawing Number(s) GA Drawing Number PD/0/41511 Issue 9 Material Steel Colour(s) BS381c – 537 Signal Red Contract Item Number 2 Inspection & Pre-preparation Additional Work: Provisional leak test - submerge in water at ambient temperature for 30 seconds. Testing Pressure Test to ▇▇▇ ▇▇▇▇ 81-102 Section 4 Quantity of refurbished containers per pallet 40 Drawing Number(s) PD/0/60640 Issue 3 Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 3 Inspection & Pre- preparation Additional Work: Provisional leak test - submerge in water at ambient temperature for 30 seconds. Testing Pressure Test to ▇▇▇ ▇▇▇▇ 81-102 Section 4 Quantity of refurbished containers per pallet 24 A980 Mk2 - Ammunition Container Description Requirement Drawing Number(s) PD/0/60640 Issue 3 material Steel Colour(s) BS381c – 537 Signal Red Contract Item Number 3a Inspection & Pre-preparation Additional Work: Provisional leak test - submerge in water at ambient temperature for 30 seconds. Testing Pressure Test to ▇▇▇ ▇▇▇▇ 81-102 Section 4 Quantity of refurbished containers per pallet 24
Description Requirement. Drawing Number(s) SV551A sheet 1 & 2 Issue 7 - SV3294 Issue 6 Material Steel Colour(s) BS381c - 499 Service Brown Contract Item Number 4 Inspection & Pre- preparation Additional Work: Check integrity and service date of internal cushioning pads. Internal pads older than 5-years are to be replaced. Locate double-sided pressure sensitive tape (BS 7116 (F)), which is a replacement for adhesive rubber No5, prior to locating new cushioning pads (SV3294) Remove split, torn, damaged components. Remove any foreign bodies located behind pads Painting – Internal Additional work: Condition A Locate double-sided pressure sensitive tape (BS 7116 (F)), which is a replacement for adhesive rubber No5, prior to locating new cushioning pads (SV3294) Replace those cushioning pads SV3294 identified missing or removed during inspection stage Condition B Locate double-sided pressure sensitive tape (BS 7116 (F)), which is a replacement for adhesive rubber No5, prior to locating new cushioning pads (SV3294) Fit full set of replacement cushioning pads SV3294. Pads to be marked with part no and year of manufacture Quantity of refurbished containers per pallet 32 Drawing Number(s) SV451AL issue 8 SV451A issue 7 SV3387 Issue 2 SV278SA Issue 8 SV2518 SV2519 Material Polyethylene HD Colour(s) Green Contract Item Number 4a Inspection & Pre- preparation Additional Work: Inspected internally and externally for cracking, splits and deformation. Inspect carrying strap assembly SV228SA for any signs of tearing, damage or failure. Ensure plastic ‘C’ clips (SV 2519) and comfort pad (SV2519) are located correctly and that the carrying strap is free from kinks. Removal wedge, strap, string assemblies. Provisional leak test - submerge in water at ambient temperature for 30 seconds. Removal ‘O’ Ring seal.