DC SYSTEM Sample Clauses

DC SYSTEM. This system must use a battery of 48 or 125 VDC to supply tripping energy to the generator circuit breaker. All such installations must isolate (trip) the generator in such a manner that: a manual operation or a time-delayed automatic synchro-check or voltage check supervised operation is required to close the generator or point-of-contact breaker (contactor) after the GPU Energy source has returned to normal. Under no circumstances is the generator contactor (breaker) to close immediately upon restoration of the GPU Energy source. An amber or yellow lamp shall provided to monitor the DC source and shall have a nameplate.
AutoNDA by SimpleDocs
DC SYSTEM. The Power Barge is equipped with a DC system which feeds DC power to the control, automation, protection and alarm systems needed to ensure safe operation and shutdown of the plant in case of a failure in the AC based station service system.
DC SYSTEM. The DC system shall consist of two 125V DC battery banks, two 100% chargers, and a distribution panel to provide power for controls, DC motors, and miscellaneous DC items. The DC system shall operate at a nominal 125 volts, ungrounded. A standard DC ground detection scheme utilizing a ground detector relay should be used. The station battery shall have sufficient capacity to supply the demand of the connected loads to permit an orderly and safe shutdown of the generating units. The capacity includes 45 minutes continuous operation for the connected load. The battery rack shall have capacity for 50% additional batteries to be added in the future. Recommended engineering practices for ventilation, containment, isolation, and corrosion protection for and from the battery system shall be followed in the design of the system. Design Criteria - RR EPC Contract, Exhibit C Rev 0 – 12/05/05
DC SYSTEM. Cable (set) 1 1 Cable racking and supports (lot) 1 1

Related to DC SYSTEM

  • PFPC System PFPC shall retain title to and ownership of any and all data bases, computer programs, screen formats, report formats, interactive design techniques, derivative works, inventions, discoveries, patentable or copyrightable matters, concepts, expertise, patents, copyrights, trade secrets, and other related legal rights utilized by PFPC in connection with the services provided by PFPC to the Fund.

  • Equipment and Software To use the Mobile Remote Deposit Services, you must obtain and maintain at your expense, compatible equipment and software that we may specify from time to time.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Supported Wage System 52.1. This clause defines the conditions which will apply to employees who because of the effects of a disability are eligible for a supported wage under the terms of this Agreement. In the context of this clause, the following definitions will apply:

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Security System The site and the Work area may be protected by limited access security systems. An initial access code number will be issued to the Contractor by the County. Thereafter, all costs for changing the access code due to changes in personnel or required substitution of contracts shall be paid by the Contractor and may be deducted from payments due or to become due to the Contractor. Furthermore, any alarms originating from the Contractor’s operations shall also be paid by the Contractor and may be deducted from payments due or to become due to the Contractor.

Time is Money Join Law Insider Premium to draft better contracts faster.