Common use of CONSTRUCTION MANAGEMENT PLAN FOR INDOOR AIR QUALITY Clause in Contracts

CONSTRUCTION MANAGEMENT PLAN FOR INDOOR AIR QUALITY. Contractor agrees to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and occupancy phases of the area being built out as follows: • During construction, meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3. • Protect stored on-site or installed absorptive materials from moisture damage. • If air handlers must be used during construction, use filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 at each return air grill, as determined by ASHRAE 52.2-1999. • Replace all filtration media immediately prior to occupancy. • Make every reasonable effort to minimize the off-gassing of volatile organic compounds used in construction materials within the Building. Efforts may include the use of no- and low-VOC products and materials, allowing products to off-gas before being brought into the Building, and flushing out the space with outside air or air purifiers.

Appears in 4 contracts

Samples: Office Lease Agreement (Spruce Biosciences, Inc.), Industrial Lease Agreement (Heritage Global Inc.), Office Lease Agreement (Spruce Biosciences, Inc.)

AutoNDA by SimpleDocs

CONSTRUCTION MANAGEMENT PLAN FOR INDOOR AIR QUALITY. Contractor agrees to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and occupancy phases of the area being built out as follows: During construction, meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings Under Construction, 19952008, Chapter 3. Protect stored on-site or installed absorptive materials from moisture damage. If air handlers must be used during construction, use filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 (MERV 8) at each return air grill, as determined by ASHRAE 52.2-19992017. Replace all filtration media immediately prior to occupancy. Make every reasonable effort to minimize the off-gassing of volatile organic compounds used in construction materials within the Buildingbuilding. Efforts may include the use of no- and low-VOC products and materials, allowing products to off-gas before being brought into the Buildingbuilding, and flushing out the space with outside air or air purifiers.

Appears in 1 contract

Samples: Office Lease Agreement (Sage Therapeutics, Inc.)

CONSTRUCTION MANAGEMENT PLAN FOR INDOOR AIR QUALITY. Contractor agrees to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and occupancy phases of the area being built out as follows: During construction, meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3. Protect stored on-site or installed absorptive materials from moisture damage. If air handlers must be used during construction, use filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 at each return air grill, as determined by ASHRAE 52.2-1999. Replace all filtration media immediately prior to occupancy. Make every reasonable effort to minimize the off-gassing of volatile organic compounds used in construction materials within the Buildingbuilding. Efforts may include the use of no- and low-VOC products and materials, allowing products to off-gas before being brought into the Buildingbuilding, and flushing out the space with outside air or air purifiers.

Appears in 1 contract

Samples: Office Lease Agreement (KalVista Pharmaceuticals, Inc.)

CONSTRUCTION MANAGEMENT PLAN FOR INDOOR AIR QUALITY. Contractor agrees to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and occupancy phases of the area being built out as follows: During construction, meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3. Protect stored on-site or installed absorptive materials from moisture damage. If air handlers must be used during construction, use filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 at each return air grill, as determined by ASHRAE 52.2-1999. Replace all filtration media immediately prior to occupancy. Make every reasonable effort to minimize the off-gassing of volatile organic compounds used in construction materials within the Building. Efforts may include the use of no- and low-VOC products and materials, allowing products to off-gas before being brought into the Building, and flushing out the space with outside air or air purifiers.

Appears in 1 contract

Samples: Lease Agreement (Bloom Energy Corp)

CONSTRUCTION MANAGEMENT PLAN FOR INDOOR AIR QUALITY. Contractor agrees to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and occupancy phases of the area being built out as follows: ¨ During construction, meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3. ¨ Protect stored on-site or installed absorptive materials from moisture damage. ¨ If air handlers must be used during construction, use filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 at each return air grill, as determined by ASHRAE 52.2-1999. ¨ Replace all filtration media immediately prior to occupancy. Make every reasonable effort to minimize the off-gassing of volatile organic compounds used in construction materials within the Buildingbuilding. Efforts may include the use of no- and low-VOC products and materials, allowing products to off-gas before being brought into the Buildingbuilding, and flushing out the space with outside air or air purifiers.

Appears in 1 contract

Samples: Office Lease Agreement (Kura Oncology, Inc.)

AutoNDA by SimpleDocs

CONSTRUCTION MANAGEMENT PLAN FOR INDOOR AIR QUALITY. Contractor agrees to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and occupancy phases of the area being built out as follows: Ø During construction, meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3. Ø Protect stored on-site or installed absorptive materials from moisture damage. Ø If air handlers must be used during construction, use filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 at each return air grill, as determined by ASHRAE 52.2-1999. Ø Replace all filtration media immediately prior to occupancy. Ø Make every commercially reasonable effort efforts to minimize the off-gassing of volatile organic compounds used in construction materials within the Buildingbuilding. Efforts may include the use of no- and low-VOC products and materials, allowing products to off-gas before being brought into the Buildingbuilding, and flushing out the space with outside air or air purifiers.

Appears in 1 contract

Samples: Industrial Lease Agreement (Solid Power, Inc.)

CONSTRUCTION MANAGEMENT PLAN FOR INDOOR AIR QUALITY. Contractor agrees to develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and occupancy phases of the area being built out as follows: · During construction, meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings Under Construction, 1995, Chapter 3. · Protect stored on-site or installed absorptive materials from moisture damage. · If air handlers must be used during construction, use filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 at each return air grill, as determined by ASHRAE 52.2-1999. · Replace all filtration media immediately prior to occupancy. Make every reasonable effort to minimize the off-gassing of volatile organic compounds used in construction materials within the Buildingbuilding. Efforts may include the use of no- and low-VOC products and materials, allowing products to off-gas before being brought into the Buildingbuilding, and flushing out the space with outside air or air purifiers.

Appears in 1 contract

Samples: Office Lease Agreement (Akcea Therapeutics, Inc.)