Construction Loads. The integrity of the structures will be maintained without use of temporary framing struts or ties and cable bracing insofar as possible. However, construction or crane access considerations may dictate the use of temporary structural systems. -------------------------------------------------------------------------------- Proprietary Information Page 6 AES IRONWOOD CONTRACT FINAL ISSUE - OCTOBER 30, 1998 -------------------------------------------------------------------------------- 2x1 501G REFERENCE PLANT APPLICATION HANDBOOK -------------------------------------------------------------------------------- STRUCTURAL ENGINEERING DESIGN CRITERIA -------------------------------------------------------------------------------- Estimated Loads Loading imposed by equipment will be specifically determined or estimated before detailed structural design. Estimated loading will be noted as such in hand calculations or computer input and verified as information is made final. Wheel and Crawler Loads Loads exerted on roadway pavements, railroad trackwork, buried piping, box culverts, and embankments will be reviewed and selected prior to design of the underlying items. Typically, ▇▇▇▇▇▇ E80 and HS20 loads will be utilized for the design of railroad and roadway subgrades. However, where appropriate, loading such as loaded scrapers, crawler cranes, stator transport trailers, etc., often exceed the more typical E80 or HS20 loading and therefore must be considered. Loading Combinations
Appears in 3 contracts
Sources: Engineering, Procurement and Construction Services Agreement (Aes Ironwood LLC), Engineering, Procurement and Construction Services Agreement (Aes Ironwood LLC), Engineering, Procurement and Construction Services Agreement (Aes Ironwood LLC)