Common use of Construction Force Majeure Events Clause in Contracts

Construction Force Majeure Events. If a Construction Force Majeure Event that results in, or could reasonably be expected to result in, a Force Majeure Loss (including any losses that result from a Construction Force Majeure Event that prevents, or could reasonably be expected to prevent, the Construction Agent from completing Construction prior to the Scheduled Construction Termination Date) occurs, the Construction Agent shall promptly provide the Lessor with written notice thereof within ten (10) Business Days of the Construction Agent's knowledge of the occurrence thereof (the "Construction Force Majeure Declaration"). Upon receipt of the Construction Force Majeure Declaration, Lessor and the Construction Agent shall consult with each other as to what steps, if any, are to be taken to remediate such Construction Force Majeure Event, including consulting as to the appropriateness of an extension of the Scheduled Construction Termination Date. The Construction Agent shall take all reasonable and practical steps to minimize the disruption of the construction process and all steps reasonably necessary to prevent further damage arising from such Construction Force Majeure Event. The Construction Agent shall be entitled to reimbursement from Lessor for any costs directly related to minimizing the disruption and to preventing further damage of such Construction Force Majeure Event through the proceeds of Fundings pursuant to, and subject to the terms and conditions of, the Master Agreement. The Construction Agent shall, within thirty (30) days of the delivery of the Construction Force Majeure Declaration, submit to the Lessor a budget detailing the costs that would be incurred in remediating such Construction Force Majeure Event and a schedule for effecting the same. The Construction Agent will commence such remediation only upon receipt of written authorization from the Lessor to do so, which authorization (or denial thereof) shall be given by written notice to Construction Agent not later than fifteen (15) Business Days after Lessor's receipt of the budget referred to in the preceding sentence. The Lessor in its sole discretion may elect to continue Construction and make Advances for such remediation or terminate this Agreement with respect to the affected Leased Property. If the Lessor elects to terminate this Agreement with respect to the affected Leased Property, subject to Construction Agent's right to purchase such Leased Property in accordance with Section 5.5 hereof, the Construction Agent shall within thirty (30) days of receipt of written notice of termination return the affected Leased Property to the Lessor in accordance with the procedures set forth in Section 5.6. In the event the Lessor elects to continue Construction after receipt of a Construction Force Majeure Declaration, the Lessor shall make available to the Construction Agent, so long as no Construction Agency Event of Default shall have occurred and be continuing, all insurance proceeds payable to the Lessor with respect to such event to the extent necessary to remediate such event.

Appears in 1 contract

Samples: Construction Agency Agreement (Concord Efs Inc)

AutoNDA by SimpleDocs

Construction Force Majeure Events. If a Construction Force Majeure Event that results in, or could reasonably be expected to result in, a Force Majeure Loss (including any losses that result from a Construction Force Majeure Event that prevents, or could reasonably be expected to prevent, the Construction Agent from completing Construction prior to the Scheduled Construction Termination Date) occurs, the Construction Agent shall promptly provide the Lessor with written notice thereof within ten (10) Business Days of the Construction Agent's ’s knowledge of the occurrence thereof (the "Construction Force Majeure Declaration"). Upon receipt of the Construction Force Majeure Declaration, Lessor and the Construction Agent shall consult with each other as to what steps, if any, are to be taken to remediate such Construction Force Majeure Event, including consulting as to the appropriateness of an extension of the Scheduled Construction Termination Date. The Construction Agent shall take all reasonable and practical steps to minimize the disruption of the construction process and all steps reasonably necessary to prevent further damage arising from such Construction Force Majeure Event. The Construction Agent shall be entitled to reimbursement from Lessor for any costs directly related to minimizing the disruption and to preventing further damage of such Construction Force Majeure Event through the proceeds of Fundings pursuant to, and subject to the terms and conditions of, the Master Agreement. The Construction Agent shall, within thirty (30) days of the delivery of the Construction Force Majeure Declaration, submit to the Lessor a budget detailing the costs that would be incurred in remediating such Construction Force Majeure Event and a schedule for effecting the same. The Construction Agent will commence such remediation only upon receipt of written authorization from the Lessor to do so, which authorization (or denial thereof) shall be given by written notice to Construction Agent not later than fifteen (15) Business Days after Lessor's ’s receipt of the budget referred to in the preceding sentence. The Lessor in its sole discretion may elect to continue Construction and make Advances for such remediation or terminate this Agreement with respect to the affected Leased Property. If the Lessor elects to terminate this Agreement with respect to the affected Leased Property, subject to Construction Agent's ’s right to purchase such Leased Property in accordance with Section 5.5 hereof, the Construction Agent shall within thirty (30) days of receipt of written notice of termination return the affected Leased Property to the Lessor in accordance with the procedures set forth in Section 5.6. In the event the Lessor elects to continue Construction after receipt of a Construction Force Majeure Declaration, the Lessor shall make available to the Construction Agent, so long as no Construction Agency Event of Default shall have occurred and be continuing, all insurance proceeds payable to the Lessor with respect to such event to the extent necessary to remediate such event.

Appears in 1 contract

Samples: Construction Agency Agreement (Concord Efs Inc)

Construction Force Majeure Events. If a Construction Force Majeure Event that results in, or could reasonably be expected to result in, a Force Majeure Loss (including any losses that result from a Construction Force Majeure Event that prevents, or could reasonably be expected to prevent, the Construction Agent from completing Construction prior to the Scheduled Construction Termination Date) occurs, the Construction Agent shall promptly provide the Lessor with written notice thereof within ten (10) Business Days of the Construction Agent's ’s knowledge of the occurrence thereof (the "Construction Force Majeure Declaration"). Upon receipt of the Construction Force Majeure Declaration, Lessor and the Construction Agent shall consult with each other as to what steps, if any, are to be taken to remediate such Construction Force Majeure Event, including consulting as to the appropriateness of an extension of the Scheduled Construction Termination Date. The Construction Agent shall take all reasonable and practical steps to minimize the disruption of the construction process and all steps reasonably necessary to prevent further damage arising from such Construction Force Majeure Event. The Construction Agent shall be entitled to reimbursement from Lessor for any costs directly related to minimizing the disruption and to preventing further damage of such Construction Force Majeure Event through the proceeds of Fundings pursuant to, and subject to the terms and conditions of, the Master Agreement. The Construction Agent shall, within thirty (30) days of the delivery of the Construction Force Majeure Declaration, submit to the Lessor a budget detailing the costs that would be incurred in remediating such Construction Force Majeure Event and a schedule for effecting the same. The Construction Agent will commence such remediation only upon receipt of written authorization from the Lessor to do so, which authorization (or denial thereof) shall be given by written notice to Construction Agent not later than fifteen (15) Business Days after Lessor's ’s receipt of the budget referred to in the preceding sentence. The Lessor in its sole discretion may elect to continue Construction and make Advances for such remediation or terminate this Agreement with respect to the affected Leased Property. If the Lessor elects to terminate this Agreement with respect to the affected Leased Property, subject to Construction Agent's ’s right to purchase such Leased Property in accordance with Section 5.5 hereof, the Construction Agent shall within thirty (30) days of receipt of written notice of termination return the affected Leased Property to the Lessor in accordance with the procedures set forth in Section 5.65.6 and pay to the Lessor the Construction Failure Payment (subject to the last sentence of Section 3.2), in which event, Section 5.6 shall be applicable, or, if the Construction Agent exercises the Construction Default Remarketing Option, Section 5.7 shall be applicable. In the event the Lessor elects to continue Construction after receipt of a Construction Force Majeure Declaration, the Lessor shall make available to the Construction Agent, so long as no Construction Agency Event of Default shall have occurred and be continuing, all insurance proceeds payable to the Lessor with respect to such event to the extent necessary to remediate such event.

Appears in 1 contract

Samples: Construction Agency Agreement (Checkfree Corp \Ga\)

Construction Force Majeure Events. If a Construction Force Majeure Event that results in, or could reasonably be expected to result in, a Force Majeure Loss (including any losses that result from a Construction Force Majeure Event that prevents, or could reasonably be expected to prevent, the Construction Agent from completing Construction prior to the Scheduled Construction Termination Date) occurs, the Construction Agent shall promptly provide the Lessor with written notice thereof within ten (10) Business Days of the Construction Agent's knowledge of the occurrence thereof (the "Construction Force Majeure Declaration"). Upon receipt of the Construction Force Majeure Declaration, Lessor and the Construction Agent shall consult with each other as to what steps, if any, are to be taken to remediate such Construction Force Majeure Event, including consulting as to the appropriateness of an extension of the Scheduled Construction Termination Date. The Construction Agent shall take all reasonable and practical steps to minimize the disruption of the construction process and all steps reasonably necessary to prevent further damage arising from such Construction Force Majeure Event. The Construction Agent shall be entitled to reimbursement from Lessor for any costs directly related to minimizing the disruption and to preventing further damage of such Construction Force Majeure Event through the proceeds of Fundings pursuant to, and subject to the terms and conditions of, the Master Agreement. The Construction Agent shall, within thirty (30) days of the delivery of the Construction Force Majeure Declaration, submit to the Lessor a budget detailing the costs that would be incurred in remediating such Construction Force Majeure Event and a schedule for effecting the same. The Construction Agent will commence such remediation only upon receipt of written authorization from the Lessor to do so, which authorization (or denial thereof) shall be given by written notice to Construction Agent not later than fifteen (15) Business Days after Lessor's receipt of the budget referred to in the preceding sentence. The Lessor in its sole discretion may elect to continue Construction and make Advances for such remediation or terminate this Agreement with respect to the affected Leased Property. If the Lessor elects to terminate this Agreement with respect to the affected Leased Property, subject to Construction Agent's right to purchase such Leased Property in accordance with Section 5.5 hereof, the Construction Agent shall within thirty (30) days of receipt of written notice of termination return the affected Leased Property to the Lessor in accordance with the procedures set forth in Section 5.65.6 and pay to the Lessor the Construction Failure Payment (subject to the last sentence of Section 3.2), in which event, Section 5.6 shall be applicable, or, if the Construction Agent exercises the Construction Default Remarketing Option, Section 5.7 shall be applicable. In the event the Lessor elects to continue Construction after receipt of a Construction Force Majeure Declaration, the Lessor shall make available to the Construction Agent, so long as no Construction Agency Event of Default shall have occurred and be continuing, all insurance proceeds payable to the Lessor with respect to such event to the extent necessary to remediate such event.

Appears in 1 contract

Samples: Construction Agency Agreement (Choicepoint Inc)

Construction Force Majeure Events. If a Construction Force Majeure --------------------------------- Event that results in, or could reasonably be expected to result in, a Force Majeure Loss (including any losses that result from a Construction Force Majeure Event that prevents, or could reasonably be expected to prevent, the Construction Agent from completing Construction prior to the Scheduled Construction Termination Date) occurs, the Construction Agent shall promptly provide the Lessor with written notice thereof within ten (10) Business Days of the Construction Agent's knowledge of the occurrence thereof (the "Construction ------------ Force Majeure Declaration"). Upon receipt of the Construction Force Majeure ------------------------- Declaration, Lessor and the Construction Agent shall consult with each other as to what steps, if any, are to be taken to remediate such Construction Force Majeure Event, including consulting as to the appropriateness of an extension of the Scheduled Construction Termination Date. The Construction Agent shall take all reasonable and practical steps to minimize the disruption of the construction process and all steps reasonably necessary to prevent further damage arising from such Construction Force Majeure Event. The Construction Agent shall be entitled to reimbursement from Lessor for any costs directly related to minimizing the disruption and to preventing further damage of such Construction Force Majeure Event through the proceeds of Fundings pursuant to, and subject to the terms and conditions of, the Master Agreement. The Construction Agent shall, within thirty (30) days of the delivery of the Construction Force Majeure Declaration, submit to the Lessor a budget detailing the costs that would be incurred in remediating such Construction Force Majeure Event and a schedule for effecting the same. The Construction Agent will commence such remediation only upon receipt of written authorization from the Lessor to do so, which authorization (or denial thereof) shall be given by written notice to Construction Agent not later than fifteen (15) Business Days after Lessor's receipt of the budget referred to in the preceding sentence. The Lessor in its sole discretion may elect to continue Construction and make Advances for such remediation or terminate this Agreement with respect to the affected Leased Property. If the Lessor elects to terminate this Agreement with respect to the affected Leased Property, subject to Construction Agent's right to purchase such Leased Property in accordance with Section 5.5 hereof, the ----------- Construction Agent shall within thirty (30) days of receipt of written notice of termination return the affected Leased Property to the Lessor in accordance with the procedures set forth in Section 5.6. In the event the Lessor elects to continue Construction after receipt of a Construction Force Majeure Declaration, the Lessor shall make available to the Construction Agent, so long as no Construction Agency Event of Default shall have occurred 5.6 and be continuing, all insurance proceeds payable pay to the Lessor with respect to such event to the extent necessary to remediate such Construction ----------- Failure Payment, in which event., Section 5.6 shall be applicable, or, if the ----------- Construction Agent exercises the Construction Default Remarketing Option,

Appears in 1 contract

Samples: Construction Agency Agreement (Hughes Supply Inc)

AutoNDA by SimpleDocs

Construction Force Majeure Events. (a) If a Construction Force Majeure Event that results in, or could reasonably be expected to result in, a Force Majeure Loss (including any losses that result from a Construction Force Majeure Event that prevents, or could reasonably be expected to prevent, the Construction Agent from completing Construction the Improvements prior to the Scheduled Construction Termination Outside Completion Date) occurs, the Construction Agent shall promptly provide the Lessor Landlord with written notice thereof within ten fifteen (1015) Business Days days of the Construction Agent's ’s knowledge of the occurrence thereof (the "Construction Force Majeure Declaration"). Upon receipt of the Construction Force Majeure Declaration, Lessor Landlord and the Construction Agent shall consult with each other as to what steps, if any, are to be taken to remediate such Construction Force Majeure Event, including consulting as to the appropriateness of an extension of the Scheduled Outside Completion Date to the extent reasonably necessary to address such Construction Termination DateForce Majeure Event. The Construction Agent shall take all commercially reasonable and practical steps lawful measures in its role as Construction Agent necessary to minimize the disruption of the construction process and all steps reasonably necessary to prevent further damage arising from such Construction Force Majeure Event. The Construction Agent shall be entitled to reimbursement from Lessor for any costs directly related to minimizing the disruption and to preventing further damage of such Construction Force Majeure Event through the proceeds of Fundings pursuant toEvent, and subject Landlord shall authorize Escrow Agent to fund such reimbursement from the terms and conditions of, the Master AgreementEscrow Funds. The Construction Agent shall, within thirty twenty (3020) days of the delivery of the Construction Force Majeure Declaration, submit to the Lessor Landlord a budget detailing the costs that would be incurred in remediating such Construction Force Majeure Event and a schedule for effecting the same. The Landlord may object to the Construction Agent’s remediation plan only for the reasons Landlord could object to the Plans and Specification as set forth in Section 2.2. Construction Agent will commence such remediation only upon receipt of written authorization from the Lessor to do so, which authorization (or denial thereof) shall be given by written notice to Construction Agent not later than fifteen (15) Business Days after Lessor's receipt Landlord’s approval of the budget referred to in the preceding sentence. The Lessor in its sole discretion may elect to continue Construction and make Advances for such remediation or terminate this Agreement with respect to the affected Leased Property. If the Lessor elects to terminate this Agreement with respect to the affected Leased Property, subject to Construction Agent's right to purchase such Leased Property in accordance with Section 5.5 hereof, the Construction Agent shall within thirty (30) days of receipt of written notice of termination return the affected Leased Property to the Lessor in accordance with the procedures set forth in Section 5.6. In the event the Lessor elects to continue Construction after receipt of a Construction Force Majeure Declaration, the Lessor shall make available to the Construction Agent, so long as no Construction Agency Event of Default shall have occurred and be continuing, all insurance proceeds payable to the Lessor with respect to such event to the extent necessary to remediate such eventplan.

Appears in 1 contract

Samples: Construction Agency Agreement (Spirit AeroSystems Holdings, Inc.)

Construction Force Majeure Events. (a) If a Construction Force Majeure Event that results in, or could reasonably be expected to result in, a Force Majeure Loss (including any losses that result from a Construction Force Majeure Event that prevents, or could reasonably be expected to prevent, the prevent Construction Agent from completing Construction causing the Final Completion Date to occur prior to the Outside Scheduled Construction Termination Completion Date) occurs, the Construction Agent shall promptly provide the Lessor Landlord with written notice thereof within ten (10) Business Days of the Construction Agent's ’s knowledge of the occurrence thereof (the "Construction Force Majeure Declaration"). Upon receipt of the Construction Force Majeure Declaration, Lessor Landlord and the Construction Agent shall consult with each other as to what steps, if any, are to be taken to remediate such Construction Force Majeure Event, including consulting as to the appropriateness of an extension of the Outside Scheduled Construction Termination Completion Date. The Construction Agent shall take all reasonable and practical steps to minimize the disruption of the construction process and all steps reasonably necessary to prevent further damage and delay arising from such Construction Force Majeure Event. The Construction Agent shall be entitled to reimbursement from Lessor Landlord for any costs directly related to minimizing the disruption and to preventing further damage and delay of such Construction Force Majeure Event through the proceeds of Fundings pursuant toEvent, and subject but only to the terms extent such payment is provided for under any contingency line item under the Construction Budget and conditions of, to be paid from the Master AgreementMaximum Improvements Amount. The Construction Agent shall, within thirty (30) days of the delivery of the Construction Force Majeure Declaration, submit to the Lessor Landlord a budget detailing Construction Agent’s estimate of the costs that would be incurred in remediating such Construction Force Majeure Event and a schedule for effecting the samesame (the “Remediation Plan”). The Any Remediation Plan (including an extension of the Outside Scheduled Completion Date) must adequately address the following, as determined in Landlord’s reasonable discretion: (i) provide for the payment of all additional costs included in the Remediation Plan either (a) from contingency line items under the existing Construction Agent will commence Budget or (b) by Construction Agent, (ii) there shall be no increase in the Maximum Improvements Amount resulting therefrom and (iii) either (y) following the payment of such remediation only upon receipt of written authorization costs from the Lessor Maximum Improvements Amount, sufficient funds will remain available under the Construction Budget and Maximum Improvements Amount to do so, which authorization complete the Improvements in accordance with the Plans and Specifications or (or denial thereofz) such costs shall be given by written notice to Construction Agent not later than considered Cost Overruns and addressed in accordance with the terms of this Agreement. Within fifteen (15) Business Days after Lessor's Landlord’s receipt of the budget referred to in the preceding sentence. The Lessor in its sole discretion may elect to continue Construction Remediation Plan and make Advances for such remediation or terminate this Agreement with respect to the affected Leased Property. If extent the Lessor elects to terminate this Agreement with respect to Remediation Plan satisfies the affected Leased Propertyforegoing conditions, subject Landlord, by written notice to Construction Agent's right to purchase such Leased Property in accordance with Section 5.5 hereof, the Construction Agent shall within thirty (30) days of receipt of written notice of termination return the affected Leased Property to the Lessor in accordance with the procedures set forth in Section 5.6. In the event the Lessor elects to continue Construction after receipt of a Construction Force Majeure Declaration, the Lessor shall make available to the authorize Construction Agent, so long as no Construction Agency Event of Default shall have occurred and be continuing, all insurance proceeds payable to the Lessor with respect to such event to the extent necessary to remediate such event.’s Remediation Plan. DMEAST #39698570 v7 18

Appears in 1 contract

Samples: Construction Agency Agreement (Progress Energy Inc)

Construction Force Majeure Events. If a Construction Force Majeure --------------------------------- Event that results in, or could reasonably be expected to result in, a Force Majeure Loss (including any losses that result from a Construction Force Majeure Event that prevents, or could reasonably be expected to prevent, the Construction Agent from completing Construction prior to the Scheduled Construction Termination Date) occurs, the Construction Agent shall promptly provide the Lessor with written notice thereof within ten (10) Business Days of the Construction Agent's knowledge of the occurrence thereof (the "Construction ------------ Force Majeure Declaration"). Upon receipt of the Construction Force Majeure ------------------------- Declaration, Lessor and the Construction Agent shall consult with each other as to what steps, if any, are to be taken to remediate such Construction Force Majeure Event, including consulting as to the appropriateness of an extension of the Scheduled Construction Termination Date. The Construction Agent shall take all reasonable and practical steps to minimize the disruption of the construction process and all steps reasonably necessary to prevent further damage arising from such Construction Force Majeure Event. The Construction Agent shall be entitled to reimbursement from Lessor for any costs directly related to minimizing the disruption and to preventing further damage of such Construction Force Majeure Event through the proceeds of Fundings pursuant to, and subject to the terms and conditions of, the Master Agreement. The Construction Agent shall, within thirty (30) days of the delivery of the Construction Force Majeure Declaration, submit to the Lessor a budget detailing the costs that would be incurred in remediating such Construction Force Majeure Event and a schedule for effecting the same. The Construction Agent will commence such remediation only upon receipt of written authorization from the Lessor to do so, which authorization (or denial thereof) shall be given by written notice to Construction Agent not later than fifteen (15) Business Days after Lessor's receipt of the budget referred to in the preceding sentence. The Lessor in its sole discretion may elect to continue Construction and make Advances for such remediation or terminate this Agreement with respect to the affected Leased Property. If the Lessor elects to terminate this Agreement with respect to the affected Leased Property, subject to Construction Agent's right to purchase such Leased Property in accordance with Section 5.5 hereof, the ----------- Construction Agent shall within thirty (30) days of receipt of written notice of termination return the affected Leased Property to the Lessor in accordance with the procedures set forth in Section 5.65.6 and pay to the Lessor the Construction ----------- Failure Payment, in which event, Section 5.6 shall be applicable, or, if the ----------- Construction Agent exercises the Construction Default Remarketing Option, Section 5.7 shall be applicable. ----------- In the event the Lessor elects to continue Construction after receipt of a Construction Force Majeure Declaration, the Lessor shall make available to the Construction Agent, so long as no Construction Agency Event of Default shall have occurred and be continuing, all insurance proceeds payable to the Lessor with respect to such event to the extent necessary to remediate such event.

Appears in 1 contract

Samples: Construction Agency Agreement (Hughes Supply Inc)