CONCRETE TESTING. Coordinate and perform sampling and testing of concrete and monitor concrete test reports to ascertain specified strengths are achieved. Follow up non-passing tests and evaluate to determine structural implications for the affected construction.
AutoNDA by SimpleDocs
CONCRETE TESTING. This item also includes all costs associated with concrete testing (slump, air, and cylinder samples complete with associated breaks) as per CAN/CSA A23.3 and CAN/CSA A23.2 latest edition for each unit. Note the following regarding concrete tests:
CONCRETE TESTING. The Contractor will prepare test cylinders in sets of three for each 100 cubic yards in the mat pour, or day’s pour for subsequent concreting. Slump tests are to be made at the time the cylinders are cast. Care in preparation, storage, labeling, and subsequent transportation of the test cylinders is required. ACCEPTED BY: /s/ Dxxxxxx Xxxxxx /s/ Sxxxx Xxxxx Dxxxxxx Xxxxxx Title: General Manager President One Earth Energy Hxxxxxxx Construction Company Date of Acceptance: December 26, 2007
CONCRETE TESTING. (a) Slump tests shall be made in accordance with CSA Standard Test Method A23.2- 5C-04, "Slump of Concrete". If the measured slump falls outside the limits in E20.3.2 of this Specification, a second test shall be made. In the event of a second failure, the Contract Administrator reserves the right to refuse the use of the batch of concrete represented.

Related to CONCRETE TESTING

  • Repair Testing At the time of repair of a LIS trunk group, at no additional charge, tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Inspection/Testing All Products sold pursuant to this Agreement will be subject to inspection/testing by or at the direction of H- GAC and/or the ordering Customer, either at the delivery destination or the place of manufacture. In the event a Product fails to meet or exceed all requirements of this Agreement, and unless otherwise agreed in advance, the cost of any inspection and/or testing, will be the responsibility of the Contractor.

  • Alcohol Testing Alcohol testing will be conducted by using an evidential breath testing device (EBT) approved by the National Highway Traffic Safety Administration. Non-EBT devices may be used for initial screening tests. A screening test will be conducted first. If the result is an alcohol concentration level of less than 0.02, the test is considered a negative test. If the alcohol concentration level is 0.02 or more, a second confirmation test will be conducted. Levels of .04 or greater on the confirmation test will be considered positive.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.