Completion Drawings. On completion of works and before issuance of completion certificate, the contractor submit completion drawings in the form of three complete set of originals (reproducible). i) As built GA and schematic drawings of MV panels, distributions boards, fire alarm panels, etc. showing material and size of sheet steel/bus bars/ connections and make and rating of switchgear i/c details of protection, meter indicating and interlocks etc. ii) Technical literature, test certificates and operation and maintenance manuals required.
Completion Drawings a) On completions of work the Concessionaire shall submit one complete sets of original tracings and two prints of “as built” drawings to the employer. These drawings shall have the following information: I. Run of all piping and diameters on all floors and vertical stacks. II. Ground and invert levels of all drainage pipes together with location of all manholes and connections upto outfall III. Run of all water supply lines with diameters, locations, of control valves, access panels IV. Locations of all mechanical equipment with layout and piping connections. b) The Concessionaire shall provide four sets of catalogues performances data and list of spare parts together with the name and address of the manufacturer for all electrical and mechanical equipment provided by him.
Completion Drawings. The Contractor shall submit and obtain approval of the Engineer-in-charge for the Drawings before execution of work.
Completion Drawings. 18.1 Completion drawings of all the completed works for showing the layout of the area with dimensions, slopes and details of building, reinforcements used, pavement, drain, cable trenches, machine foundations, etc, shall be prepared by the contractor at his own cost. 18.2 Contractor will supply three copies of completion drawings along with soft copy in CD / Pen-drive with the final bill. In case contractor does not submit the completion drawing within 30 days of completion of the work or alongwith submission of final bill (whichever is later), he shall be liable to pay a sum as prescribed in Schedule F and in this respect the decision of the Engineer-in-charge shall be final and binding on the contractor.
Completion Drawings. Two sets each of final drawings of the project on completion and detailed layout plans of all services shall be prepared by <PWO> and handed over all the <Organisation> as and when called for. This must be provided while making any AIP or final bill on completion of job. The FSTR should be self explanatory w.r.t. sanctioned amount, expenditure incurred, firm liability and anticipated liability if any for entire project. All the financial records of <PWO> relevant to the contract will be open to scrutiny and inspection by the authorized representatives of