Clearing site Sample Clauses
Clearing site. The description of clearing site shall be deemed to include clearing and removing from the site of all loose debris and rubbish, bushes, scrub, undergrowth, vegetation and small trees (i.e. not exceeding 600 mm girth), and grubbing up their roots.
Clearing site. 2.1 The area proposed for lining, as a whole shall be cleared of all objectionable material. Any waste materials obtained from such site clearance shall be disposed off in a manner directed by the Engineer- in-charge. The cost of this operation shall be deemed to have been covered under the rated quoted for canal lining.
Clearing site. The site on which the structure is to be built as shown on the plan and the area required for setting out and other operations should be cleared and all obstructions, loose stones, materials and rubbish of all kinds, stumps, brush wood and trees removed as directed, roots being entirely grubbed up. The materials obtained will be the property of the Government and materials pronounced useful by the Engineer will be conveyed and properly stacked as directed. Useless materials shall be disposed off the site as directed by the Engineers.
Clearing site. THE FOLLOWING IS ADDED: Clearing site includes removal and disposal of all items, materials, debris, trees, vegetation growth, etc. required to properly perform the work specified under this Contract and not so identified for removal in other parts of these specifications. Clearing site will also include the complete removal restoration of area of all trees within 10 feet of the structure and approach roadways that are designated by the RE to be removed. The structure under this subsection is defined as all bridge components, such as superstructure, substructure, including wingwalls, beam guide rails, lighting, sign supports, etc. Clearing site shall also include the cleanup and restoration of any yard location chosen by the Contractor for staging of equipment and materials.
Clearing site. THE FOLLOWING IS ADDED: Remove trees and branches within 15 feet of the end of JCP&L pole cross arms. If the resulting tree is rendered hazardous, then remove the entire tree according to SECTION 802.
Clearing site. During performance of the work under this Agreement and upon termination or completion thereof, Contractor shall remove all debris and waste materials and keep and leave the site of the work in a condition satisfactory to INEOS KOH. If INEOS KOH desires Contractor to use INEOS KOH’s disposal sites or methods, Contractor’s obligation concludes upon disposition of such debris and waste materials in accordance with INEOS KOH’s directive.
Clearing site. Preliminary work are required to be done before laying of pipes including pegging out, clearing and disposal of shrubs, grasses, bushes, ▇▇▇▇▇▇, boulders, debris from the route. This shall also include the removal of stumps, etc. or parts thereof lying along the alignment of pipe. The Contractor should inform the Engineer in charge before removing shrubs, grasses, etc. well in advance. The alignment of the mains shall be so fixed as to avoid cutting of any trees.
Clearing site. CLEARING SITE
Clearing site. Clearance of the site shall also include the demolition and removal of all articles, objects, trees, shrubs and obstructions, which are expressly required to be cleared. The Concessionaire shall ensure that the parts of the site to be occupied by the permanent works are clear and shall maintain the remainder of the site as may be required for access and temporary works areas. The Concessionaire shall remove the material arising from such clearance and dispose it off in a manner and at a location, on or off the site. The Concessionaire shall fill and make good with appropriate materials dispose cavities and loses of soil, which result from clearing the parts of the site not subsequently to be occupied by the works.