Common use of CALL-OFF CONTRACT PERFORMANCE Clause in Contracts

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 5 contracts

Samples: assets.crowncommercial.gov.uk, assets.crowncommercial.gov.uk, assets.crowncommercial.gov.uk

AutoNDA by SimpleDocs

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where the Parties agreed in the Order Form (or elsewhere in this Call Off Contract) that an Implementation Plan has not been agreed and included (or parts thereof) shall be provided in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that draft by the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Order Form (or elsewhere in this Call Off Order FormContract). The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved chieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 3 contracts

Samples: assets.crowncommercial.gov.uk, www.contractsfinder.service.gov.uk, data.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Goods and/or Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Goods and/or Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 3 contracts

Samples: assets.crowncommercial.gov.uk, assets.crowncommercial.gov.uk, www.whatdotheyknow.com

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Products and/or Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Products and/or Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 2 contracts

Samples: assets.crowncommercial.gov.uk, assets.webuat.crowncommercial.gov.uk

CALL-OFF CONTRACT PERFORMANCE. 6. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Goods and/or Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Goods and/or Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 2 contracts

Samples: Contract For, www.contractsfinder.service.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where the Parties agreed in the Order Form (or elsewhere in this Call Off Contract) that an Implementation Plan has not been agreed and included (or parts thereof) shall be provided in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that draft by the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Goods and/or Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Order Form (or elsewhere in this Call Off Order FormContract). The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Goods and/or Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 2 contracts

Samples: assets.crowncommercial.gov.uk, assets.crowncommercial.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Goods and/or Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Goods and/or Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 1 contract

Samples: assets.crowncommercial.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Goods and/or Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.27.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Goods and/or Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 1 contract

Samples: assets.crowncommercial.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where the Parties agreed in the Order Form (or elsewhere in this Call Off Contract) that an Implementation Plan has not been agreed and included (or parts thereof) shall be provided in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that draft by the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Goods and/or Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Order Form (or elsewhere in this Call Off Order FormContract). The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Goods and/or Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default breach of a condition unless the Parties expressly agree otherwise.

Appears in 1 contract

Samples: assets.crowncommercial.gov.uk

AutoNDA by SimpleDocs

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where the Parties agreed in the Order Form (or elsewhere in this Call Off Contract) that an Implementation Plan has not been agreed and included (or parts thereof) shall be provided in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that draft by the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Order Form (or elsewhere in this Call Off Order FormContract). The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 1 contract

Samples: assets.crowncommercial.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Services, the Supplier’s Suppliers draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's Suppliers ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 1 contract

Samples: www.contractsfinder.service.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved Achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.211.1.6, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 1 contract

Samples: assets.crowncommercial.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where an Implementation Plan has not been agreed and included in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the ServicesGoods and delivery of purchased Goods, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Call Off Order Form. The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.27.1.7, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the ServicesGoods and delivery of purchased Goods. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 1 contract

Samples: assets.crowncommercial.gov.uk

CALL-OFF CONTRACT PERFORMANCE. IMPLEMENTATION PLAN Formation of Implementation Plan Where the Parties agreed in the Order Form (or elsewhere in this Call Off Contract) that an Implementation Plan has not been agreed and included (or parts thereof) shall be provided in Call Off Schedule 4 (Implementation Plan) on the Call Off Commencement Date, but the Customer has specified in the Call Off Order Form that draft by the Supplier shall provide a draft Implementation Plan prior to the commencement of the provision of the Services, the Supplier’s draft must contain information at the level of detail necessary to manage the implementation stage effectively and as the Customer may require. The draft Implementation Plan shall take account of all dependencies known to, or which should reasonably be known to, the Supplier. The Supplier shall submit the draft Implementation Plan to the Customer for Approval (such decision of the Customer to Approve approve or not shall not be unreasonably delayed or withheld) within such period as specified by the Customer in the Order Form (or elsewhere in this Call Off Order FormContract). The Supplier shall perform each of the Deliverables identified in the Implementation Plan by the applicable date assigned to that Deliverable in the Implementation Plan so as to ensure that each Milestone identified in the Implementation Plan is achieved on or before its Milestone Date. The Supplier shall monitor its performance against the Implementation Plan and Milestones (if any) and any other requirements of the Customer as set out in this Call Off Contract and report to the Customer on such performance. Control of Implementation Plan Subject to Clause 6.2.2, the Supplier shall keep the Implementation Plan under review in accordance with the Customer’s instructions and ensure that it is maintained and updated on a regular basis as may be necessary to reflect the then current state of the provision of the Services. The Customer shall have the right to require the Supplier to include any reasonable changes or provisions in each version of the Implementation Plan. Changes to the Milestones (if any), Milestone Payments (if any) and Delay Payments (if any) shall only be made in accordance with the Variation Procedure and provided that the Supplier shall not attempt to postpone any of the Milestones using the Variation Procedure or otherwise (except in the event of a Customer Cause which affects the Supplier's ability to achieve a Milestone by the relevant Milestone Date). Where so specified by the Customer in the Implementation Plan or elsewhere in this Call Off Contract, time in relation to compliance with a date, Milestone Date or period shall be of the essence and failure of the Supplier to comply with such date, Milestone Date or period shall be a material Default unless the Parties expressly agree otherwise.

Appears in 1 contract

Samples: www.contractsfinder.service.gov.uk