Common use of Bulk/Packed Bitumen Clause in Contracts

Bulk/Packed Bitumen. (1) 60/70, grade bit6umen as specified in respective items shall be used. (2) Bitumen brought on site confirm to the requirement of the pertinent grade in I.S. 73 - 1992. (With latest Amendments) (3) Testing has to be arranged by the contractor from recognised laboratory at his own cost for all tests mentioned in I.S. 73 - 1992. (With latest Amendments) (4) The material brought by the agency will be open to check by Executive Engineer or his representative at all times. The agency should draw the D.D. on the refinery on account of Executive Engineer. He should submit bill from the refinery itself only. No. other bill than refinery unit will be accepted by department and no claim of contractor will be admissible. For other activities, like storage, weighments, specification number RD 42, Page 216 referred. Contractor has to arrange static tanks for storage of bulk bitumen. If it is decided to procure bulk bitumen contractor shall intimate Engineer in charge well in advance. Consignment will not be allowed to unload until its weight is checked on Weigh Bridge by department persons. Bitumen shall be procured from Govt. Refinery only.

Appears in 1 contract

Sources: Construction Contract

Bulk/Packed Bitumen. (1) 60/70, grade bit6umen bitumen as specified in respective items shall be used. (2) Bitumen brought on site confirm to the requirement of the pertinent grade in I.S. 73 - 1992. (With latest Amendments) (3) Testing has to be arranged by the contractor from recognised 68ituminize laboratory at his own cost for all tests mentioned in I.S. 73 - 1992. (With latest Amendments) (4) The material brought by the agency will be open to check by Executive Engineer or his representative at all times. The agency should draw the D.D. on the refinery on account of Executive Engineer. He should submit bill ▇▇▇▇ from the refinery itself only. No. other bill ▇▇▇▇ than refinery unit will be accepted by department and no claim of contractor will be admissible. For other activities, like storage, weighments, specification number RD 42, Page 216 referred. Contractor has to arrange static tanks for storage of bulk bitumen. If it is decided to procure bulk bitumen contractor shall intimate Engineer in charge well in advance. Consignment will not be allowed to unload until its weight is checked on Weigh Bridge by department persons. Bitumen shall be procured from Govt. Refinery only. (5) Rejection of Materials not conforming to specification:

Appears in 1 contract

Sources: Construction Contract