Bridges. 31 Developer shall provide rustication patterns on all new bridge barrier walls, bridge piers, and 32 bridge abutment walls in ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ in accordance with Exhibits L2.30, L2.31, 33 and L2.33 of the LAADCR. The final designs shall resemble these simulations. Developer shall 34 paint the existing ▇▇▇▇ ▇▇▇▇▇▇ bridge with the ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ base color. If the 63rd 35 Avenue bridge is replaced, it shall have the same rustication as the existing structure, and
Appears in 1 contract
Sources: Design Build Maintain Agreement
Bridges. 31 22 Developer shall provide rustication patterns on all new bridge barrier walls, bridge piers, and 32 bridge 23 abutment walls in ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ Aesthetic Area 4 in accordance with Exhibits L2.30L2.26, L2.31L2.27, 33 and L2.33 L2.29 of the LAADCR. The final designs shall resemble these simulations. Developer shall 34 paint the existing ▇▇▇▇ ▇▇▇▇▇▇ bridge with the ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ base color. If the 63rd 35 Avenue bridge is replaced, it shall have the same rustication as the existing structure, andthe
Appears in 1 contract
Sources: Design Build Maintain Agreement
Bridges. 31 35 Developer shall provide rustication patterns on all new bridge barrier walls, bridge piers, and 32 bridge 36 abutment walls in ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ Aesthetic Area 2 in accordance with Exhibits L2.30L2.18, L2.31L2.19, 33 and L2.33 L2.21 of the LAADCR. The final designs shall resemble these simulations. Developer shall 34 paint the existing ▇▇▇▇ ▇▇▇▇▇▇ bridge with the ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ base color. If the 63rd 35 Avenue bridge is replaced, it shall have the same rustication as the existing structure, andthe
Appears in 1 contract
Sources: Design Build Maintain Agreement
Bridges. 31 34 Developer shall provide rustication patterns on all new bridge barrier walls, bridge piers, and 32 bridge 35 abutment walls in ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ Aesthetic Area 2 in accordance with Exhibits L2.30L2.18, L2.31L2.19, 33 and L2.33 L2.21 of the LAADCR. The final designs shall resemble these simulations. Developer shall 34 paint the existing ▇▇▇▇ ▇▇▇▇▇▇ bridge with the ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ base color. If the 63rd 35 Avenue bridge is replaced, it shall have the same rustication as the existing structure, andthe
Appears in 1 contract
Sources: Design Build Maintain Agreement
Bridges. 31 35 Developer shall provide rustication patterns on all new bridge barrier walls, bridge piers, and 32 bridge 36 abutment walls in ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ CharacterAesthetic Area 1 in accordance with Exhibits L2.30L2.14, L2.31L2.15, 33 and L2.33 37 L2.17 of the LAADCR. The final designs shall resemble these simulations. Developer shall 34 paint the existing The ▇▇▇▇ ▇▇▇▇▇▇ 38 bridge with does not need to be painted to match the ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ base color. If Aesthetic Area unless the 63rd 35 Avenue bridge is replaced, it shall have the same rustication as the existing structure, andmodified by
Appears in 1 contract
Sources: Design Build Maintain Agreement
Bridges. 31 19 Developer shall provide rustication patterns on all new bridge barrier walls, bridge piers, and 32 bridge 20 abutment walls in ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ Aesthetic Area 1 in accordance with Exhibits L2.30L2.14, L2.31L2.15, 33 and L2.33 L2.17 of the 21 LAADCR. The final designs shall resemble these simulations. Developer shall 34 paint the existing The ▇▇▇▇ ▇▇▇▇▇▇ bridge with does not 22 need to be painted to match the ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ base color. If Aesthetic Area unless the 63rd 35 Avenue bridge is replaced, it shall have the same rustication as the existing structure, andmodified by Developer’s 23 design.
Appears in 1 contract
Sources: Design Build Maintain Agreement
Bridges. 31 18 Developer shall provide rustication patterns on all new bridge barrier walls, bridge piers, and 32 bridge 19 abutment walls in ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ Aesthetic Area 1 in accordance with Exhibits L2.30L2.14, L2.31L2.15, 33 and L2.33 L2.17 of the 20 LAADCR. The final designs shall resemble these simulations. Developer shall 34 paint the existing The ▇▇▇▇ ▇▇▇▇▇▇ bridge with does not 21 need to be painted to match the ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇ base color. If Aesthetic Area unless the 63rd 35 Avenue bridge is replaced, it shall have the same rustication as the existing structure, andmodified by Developer’s 22 design.
Appears in 1 contract
Sources: Design Build Maintain Agreement