Common use of Borrow pits Clause in Contracts

Borrow pits. If because of an insufficiency of suitable material for use in back filling of trenches, road formation or if because of other circumstances the Engineer so agrees or orders, the Contractor shall supply such materials from borrow pits. The Contractor shall obtain the approval of the Engineer to the location of borrow pits and shall adhere to instructions in regard to the area, width, depth and slope of the borrow pits and also to the depth of overburden if any, which has to be removed. Prior to excavating materials from borrow pits, the Contractor shall strip all unsuitable overburden and lay it aside. The use as fill of this and other unsuitable material will not be permitted. After the use of a borrow pit has been finally discontinued, the overburden and any other unsuitable material previously laid aside shall be replaced in the pits, spread and levelled as required. The sides of the borrow pits shall be graded and the whole area shall be left in a tidy, regular and self-draining state, all to satisfaction of the Engineer. In case of payment for imported fill such fill will be measured solid, after compaction net as shown on Drawings. Supply of material from borrow pits shall, except where otherwise specified, be deemed to cover supply, spreading and compaction of the fill in the works and any other costs the Contractor might have including negotiations with owners, stripping and handling of overburden and the satisfactory reinstatement after completion.

Appears in 4 contracts

Samples: www.fao.org, www.fao.org, www.fao.org

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.