BLOCKING AND REINFORCING FOR WALL-HUNG ITEMS Sample Clauses

BLOCKING AND REINFORCING FOR WALL-HUNG ITEMS. A. Provide cut sections or runner channel, zinc coated steel backing plates, doubled and nested studs, load bearing studs and other items, as indicated, for the support of wall-hung fixtures, shelving, cabinets, hand rails and toilet accessories. Cut ends of runner and backing plates to each stud. Fasten studs carrying the weight of wall-hung items to the bottom runner channel.
AutoNDA by SimpleDocs

Related to BLOCKING AND REINFORCING FOR WALL-HUNG ITEMS

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Archiving and Reuse Self-Archiving: The Publisher permits the Rights Holder to archive the Contribution in accordance with the Publisher's guidelines, the current version of which is set out in the Appendix "Author's Self-Archiving Guidelines".

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Monitoring and Recording COMMUNICATIONS - We may monitor and record communications between you and us, including telephone conversations, electronic messages, electronic records, or other data transmissions that affect your accounts or other products and services. Except as otherwise prohibited by applicable law, you agree we may monitor and record such communications without your approval or further notice to you.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

Time is Money Join Law Insider Premium to draft better contracts faster.