Bioslopes. Bioslope drains are paid for at the Contract Unit Price per each. The outlet control structure, any outlet pipe, any pretreatment, any signage, and any outlet apron and/or other energy dissipation devices are paid for in the overall cost of the bioslope. Payment is full compensation for: Furnishing the material and labor Preparation and grading required to construct bioslopes Installation of the drainage aggregate, collector pipes, bioslope soil media, nonwoven filter fabric, and turf reinforcement matting 1, as shown in the details for construction of bioslope drains Any incidentals such as but not limited to pipe fittings and connections required to construct the bioslope
Appears in 1 contract
Sources: Amendment to Advertised Contract
Bioslopes. Bioslope drains are paid for at the Contract Unit Price per eachlump sum. The outlet control structure, any outlet pipe, any pretreatment, any signage, and any outlet apron and/or other energy dissipation devices are paid for in as a lump sum for the overall cost of the bioslope. Payment is full compensation for: Furnishing the material and labor Preparation and grading required to construct bioslopes Installation of the drainage aggregate, collector pipes, bioslope soil media, nonwoven filter fabric, and turf reinforcement matting 1, as shown in the details for construction of bioslope drains Any incidentals such as but not limited to pipe fittings and connections required to construct the bioslope
Appears in 1 contract
Sources: Amendment to Advertised Contract