Related References Sample Clauses

Related References. A. Standard Specifications Section 104Scope of Work Section 107Legal Regulations and Responsibility to the Public Section 108Prosecution and Progress Section 205—Roadway Excavation Section 207—Excavation and Backfill for Minor Structures Section 210—Grading Complete Section 400—Hot Mix Asphaltic Concrete Construction Section 444—Sawed Joints in Existing Pavements Section 500—Concrete Structures Section 600—Controlled Low Strength Flowable Fill Section 611—Relaying, Reconstructing or Adjusting to Grade of Miscellaneous Roadway Structures Section 615—Jacking or Boring Pipe Section 810—Roadway Materials
Related References. A. Standard Specifications Section 800—Coarse Aggregate B. Referenced Documents AASHTO T 11 AASHTO T 27 AASHTO T 193 ASTM C 295 ASTM D 3042 FL DOT Method FM5-515 SOP–1 QPL-2 GDT 63 EPA Method 3050/6010 EPA Method 1311 EPA Polarized Light Microscopy Method EPA Transmission Electron Microscopy Method 815.2 Materials
Related References. A. Standard Specifications General Provisions 101 through 150. B. Referenced Documents AASHTO T 44 AASHTO T 48 AASHTO T 49 AASHTO T 51 AASHTO T 55 AASHTO T 78 AASHTO T 79 AASHTO T 201 821.2 Materials
Related References. A. Standard Specifications Section 108Prosecution and Progress Section 214—Mitigation Site Construction Section 700—Grassing Section 882—Lime Section 891—Fertilizers Section 893—Miscellaneous Planting Materials
Related References. A. Drawings and general provisions of this Contract including General and Supplementary Conditions and Division 1 specification sections apply to this section.
Related References. General Provisions 101 through 150.
AutoNDA by SimpleDocs
Related References. A. Standard Specifications Section 500—Concrete Structures Section 504—Twenty-Four Hour Accelerated Strength Concrete Section 511Reinforcement Steel Section 853—Reinforcement and Tensioning Steel Section 886—Epoxy Resin Adhesives Section 934—Rapid Setting Patching Materials for Portland Cement Concrete B. Referenced Documents QPL 10 QPL 27
Related References. A. Standard Specifications Section 109 - Measurement and Payment B. Referenced Documents ACI 440.2R-17 ASTM C1583 ASTM D3039 ASTM D4541 ICC ES Acceptance Criteria (AC125) ICRI CSP - 5 – Guideline No. 03732
Related References. A. Standard Specifications Section 105Control of Work Section 106Control of Materials Section 107Legal Regulations and Responsibility to the Public Section 109Measurement and Payment Section 160—Reclamation of Material Pits and Waste Areas Section 162—Erosion Control Check Dams Section 163—Miscellaneous Erosion Control Items Section 166—Restoration or Alteration of Lakes and Ponds Section 170—Silt Retention Barrier Section 171—Temporary Silt Fence Section 205—Roadway Excavation Section 434—Sand Asphalt Paved Ditches Section 441—Miscellaneous Concrete Section 603—Rip Rap Section 700—Grassing Section 710—Permanent Soil Reinforcing Mat Section 715—Bituminous Treated Roving Section 716—Erosion Control Mats (Blankets) Erosion control measures contained in the Specifications include: Erosion Control Measure Section Temporary Check Dams 163.3.05.J Bituminous Treated Mulch 700.3.05.G Concrete Paved Ditches 441 Bituminous Treated Roving 715 Erosion Control Mats (Blankets) 716 Erosion Control Check Dams 162 Grassing 700 Maintenance of Temporary Erosion Control Devices 165 Permanent Soil Reinforcing Mat 710 Reclamation of Material Pits and Waste Areas 160 Rip Rap 603 Restoration or Alteration of Lakes and Ponds 166 Sand-Asphalt Ditch Paving 434 Sediment Basin 163.3.05.C Silt Control Gate 163.3.05.A Silt Retention Barrier 170 Sod 700.3.05.H & 700.3.05.l Mulch 163 Temporary Grassing 163.3.05.F Temporary Silt Fence 171 Temporary Slope Drains 163.3.05.B Triangular Sediment Barrier 720 Silt Filter Bag 719 Organic & Synthetic Material Fiber Blanket 713 B. Referenced Documents Erosion and Sedimentation Pollution Control Plans (ESPCP)
Time is Money Join Law Insider Premium to draft better contracts faster.