Battenkill Substation Sample Clauses

Battenkill Substation. All modifications shall be completed in the Battenkill Substation yard and control house.
Battenkill Substation. All modifications at the Battenkill Substation will be completed in its yard and control enclosure. a) Line 310 Protection Packages 6-1 SERVICE AGREEMENT NO. 2557 The existing Line 310 protection is a POTT for the ‘A’ package and step distance for the ‘B’ package. The existing relays (‘A’ package SEL-311C and ‘B’ package ERL Phase LPRO) will be reused and reset to accommodate the generation. DTT transmit and receive to the ▇▇▇▇▇▇▇▇▇ Solar Collector Substation will be added. DTT will be sent to the ▇▇▇▇▇▇▇▇▇ Solar Collector Substation for a line relay operation, R309 breaker failure. DTT for breaker failure will be received from the ▇▇▇▇▇▇▇▇▇ Solar Collector Substation. A SEL-351-6 will be added for DTT receive supervision and will be used to trip and drive reclosing to lockout. A GARD 8000 will be added for DTT to and from the ▇▇▇▇▇▇▇▇▇ Solar Collector Substation. An on/off switch for the DTT scheme shall be installed. A new relay panel is required for installation of the new protection equipment. b) Controls and Integration The existing RTUs are sufficient for the scope of this project. Spare I/O points will be used to accommodate the additions required. The new relays shall be connected to the existing Ruggedcom ethernet switch to allow for remote access of relay fault logs.
Battenkill Substation