Other System Upgrade Facilities Sample Clauses

Other System Upgrade Facilities. To integrate the new Astoria Annex Substation with the New York State Transmission System, upgrades are required at Con Edison’s East 13th Street Substation and Farragut Substation. Developer will design and procure the System Upgrade Facilities, and Con Edison will perform this upgrade work for Developer as follows:
AutoNDA by SimpleDocs
Other System Upgrade Facilities. The Connecting Transmission Owner will design, procure, construct, install, and own the Other System Upgrade Facilities.
Other System Upgrade Facilities. 1. 115 kV Transmission Work at the Point of Interconnection The Connecting Transmission Owner will engineer the Point of Interconnection Line 953 Tap Work which includes reconfiguring the 115 kV transmission line for connecting the new Xxxxxxx Xxxx Substation.
Other System Upgrade Facilities. The interconnection of the Small Generating Facility will require the following System Upgrade Facilities at the Connecting Transmission Owner’s Meco and Rotterdam Substations.
Other System Upgrade Facilities. The Developer shall perform its responsibilities described in this Section 2(b) of Appendix A in accordance with the Connecting Transmission Owner’s requirements, as described above in Section 1(a) of this Appendix A, and the other provisions of this Agreement applicable to System Upgrade Facilities to be engineered, designed, procured, constructed and installed by Developer, including Article 5.2.
Other System Upgrade Facilities. The interconnection of the Small Generating Facility will be accommodated by modifications at Connecting Transmission Owner’s existing Battenkill and Schaghticoke Substations.
Other System Upgrade Facilities. Interconnection Customer will design, procure, and construct the System Upgrade Facilities at the Bethlehem 115kV Substation owned and operated by Brookfield Renewable Partners. These System Upgrade Facilities will be designed, procured, and constructed in accordance with a separate Engineering, Procurement, and Construction Agreement among Brookfield Renewable Partners, KCE NY 6, LLC, and the NYISO. The System Upgrade Facilities for the Bethlehem 115kV Substation will include the following major electrical equipment and facilities: • dedicated communication line for transfer trip; • 19” rack to be located in the battery/maintenance room that will house the following: o XXX XXXX0000 Teleprotection Channel;
AutoNDA by SimpleDocs
Other System Upgrade Facilities i. Coopers Corners Substation New York State Electric & Gas Corporation (“NYSEG”) will design, procure, and construct the System Upgrade Facilities at its Coopers Corners 345 kV Substation. These System Upgrade Facilities will be designed, procured, and constructed in accordance with a separate Engineering, Procurement, and Construction Agreement among NYSEG, the Developer, and the NYISO. The System Upgrade Facilities for the Coopers Corners 345 kV Substation will include the following major electrical and physical equipment associated with the line segment from Coopers Corners to Xxxxxx Avenue Substation: • Conduit; • Control cabling; • Redundant A & B relay systems; • A & B pilot schemes; • A & B breaker failure systems; • Communication equipment for remote communication to relays; • Control House expansion for relaying panels, control and communication; • Control House expansion foundation; • Relay panels.
Other System Upgrade Facilities. The Large Generating Facility will interconnect via the Xxxxxxx Avenue Substation. The Connecting Transmission Owner shall engineer, design, and procure all materials, and construct and install modifications or additions to expand the existing Xxxxxxx Avenue Substation from a 5-breaker right bus to a 6-breaker ring bus configuration. The expansion of the Xxxxxxx Avenue Substation will include the following major electrical equipment: • demolition of existing breaker and disconnect switch foundations; • foundations: bus support structures, equipment structures, and circuit breakers; • grounding: SUF grounding shall be in accordance with IEEE Std. 80 and Connecting Transmission Owner standards and would be an expansion of the grounding system existing in Xxxxxxx Ave Substation, and be coordinated with the CTOAF grounding work in the yard. A grounding study shall be conducted to ensure that grounding requirements of Connecting Transmission Owner are met; • conduit and cable trench systems; • one (1) 145 kV, 3000 A, 63 kA SF6 circuit breaker and accessories (approved manufacturer: ABB); • two (2) 138 kV, 3000 A, TPST, vertical break disconnect switches, with arcing horns and auxiliary switch contacts (approved manufacturers: Xxxxxxxxxx Price, Southern States); • three (3) 138 kV PTs, relay accuracy (approved manufacturers: ITEC, Trench); • 138 kV bus structures; • disconnect switch and PT structures; • salvage, and relocation of one 145 kV, 3000A, SF6 gas filled circuit breaker; • salvage, and relocation of one 138 kV, 3000 A, TPST, vertical break disconnect switch; • two (2) bus differential and breaker failure protection panels; • protection relays and control switches; and • power, protection, control, and communication cables.
Other System Upgrade Facilities. 1. Luther Forest Substation All modifications at the Luther Forest Substation will be completed in its yard and control enclosure.