Common use of ASPHALT PAVEMENTS - SUPERPAVE Clause in Contracts

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 8-16-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-6, Subarticle 607-5(A), Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F I19.0B, C, D 35°F SF9.5A, S9.5B 40°FA S9.5C, S12.5C 45°FA S9.5D, S12.5D 50°F

Appears in 5 contracts

Samples: Proposal Item Sheet, Proposal Item Sheet, connect.ncdot.gov

AutoNDA by SimpleDocs

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 84-1621-1615) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A), Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. 3 FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), ) Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 DESIGN MIXING TEMPERATURE AT THE ASPHALT PLANT PLANTA Binder Grade HMA JMF Mix Temperature PG 58-28; WMA JMF Temperature Range PG 64-22 250 300ºF 225 - 290ºF 275ºF PG 70-22 275- 305ºF 315ºF 240 - 290ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F I19.0B, C, D 35°F SF9.5A, S9.5B 40°FA S9.5C, S12.5C 45°FA S9.5D, S12.5D 50°F335ºF 260 - 310ºF

Appears in 5 contracts

Samples: Proposal Item Sheet, connect.ncdot.gov, connect.ncdot.gov

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 81-1619-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A)3, Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F 35F I19.0B, C, D 35°F 35F SF9.5A, S9.5B 40°FA 40FA S9.5C, S12.5C 45°FA 45FA S9.5D, S12.5D 50°F50F A. For the final layer of surface mixes containing recycled asphalt shingles (RAS), the minimum surface and air temperature shall be 50ºF. Page 6-23, Subarticle 610-5(A), General, lines 33-34, replace the last sentence of the third paragraph with the following: Produce the mixture at the asphalt plant within ±25 ºF of the JMF mix temperature. The temperature of the mixture, when discharged from the mixer, shall not exceed 350ºF. Page 6-26, Article 610-8, SPREADING AND FINISHING, line 34, add the following new paragraph: As referenced in Section 9.6.3 of the HMA/QMS Manual, use the automatic screed controls on the paver to control the longitudinal profile. Where approved by the Engineer, the Contractor has the option to use either a fixed or mobile string line. the following after the first sentence in the first paragraph: Smoothness acceptance testing using the inertial profiler is not required on ramps, loops and turn lanes. The interval at which relative profile elevations are reported shall be 2”. Operate the profiler at any speed as per the manufacturer’s recommendations to collect valid data. After testing, transfer the profile data from the profiler portable computer’s hard drive to a write once storage media (Flash drive, USB, DVD-R or CD-R) or electronic media approved by the Engineer. Submit a report with the documentation and electronic data of the evaluation for each section to the Engineer within 10 days after completion of the smoothness testing. The report shall be in the tabular format for each 0.10 segment or a portion thereof with a summary of the MRI values and the localized roughness areas including corresponding project station numbers or acceptable reference points. Calculate the pay adjustments for all segments in accordance with the formulas in Sections (1) and (2) shown below. The Engineer shall review and approval all pay adjustments unless corrective action is required. The price adjustment will apply to each 0.10-mile section or prorated for a portion thereof, based on the Mean Roughness Index (MRI), the average IRI values from both wheel paths. Areas of localized roughness shall be identified through the “Smoothness Assurance Module (XXX)” provided in the ProVAL software. Use the XXX report to optimize repair strategies by analyzing the measurements from profiles collected using inertial profilers. The ride quality threshold for localized roughness shall be 165 in/mile for any sections that are 15 ft. to 100 ft. in length at the continuous short interval of 25 ft. Submit a continuous roughness report to identify each section with project station numbers or reference points outside the threshold and identify all localized roughness, with the signature of the Operator included with the submitted IRI trace and electronic files. If the Engineer does not require corrective action, the pay adjustment for each area of localized roughness shall be based on the following formula: PA = (165 – LR#) 5 Where: PA = Pay Adjustment (dollars) LR# = The Localized Roughness number determined from XXX report for the ride quality threshold Page 6-41, Subarticle 650-3(B), Mix Design Criteria, replace Table 650-1 with the following: TABLE 650-1 OGAFC GRADATION CRITERIA Sieve Size (mm) Type FC-1 Type FC-1 Modified Type FC-2 Modified

Appears in 5 contracts

Samples: Power Equipment Operators, Proposal Item Sheet, Proposal Item Sheet

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 8-16-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-6, Subarticle 607-5(A), Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-607- 5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F 35F I19.0B, C, D 35°F 35F SF9.5A, S9.5B 40°FA 40FA S9.5C, S12.5C 45°FA 45FA S9.5D, S12.5D 50°F50F A. For the final layer of surface mixes containing recycled asphalt shingles (RAS), the minimum surface and air temperature shall be 50ºF. Page 6-23, Subarticle 610-5(A), General, lines 33-34, replace the last sentence of the third paragraph with the following: Produce the mixture at the asphalt plant within ±25 ºF of the JMF mix temperature. The temperature of the mixture, when discharged from the mixer, shall not exceed 350ºF. Page 6-26, Article 610-8, SPREADING AND FINISHING, line 34, add the following new paragraph: As referenced in Section 9.6.3 of the HMA/QMS Manual, use the automatic screed controls on the paver to control the longitudinal profile. Where approved by the Engineer, the Contractor has the option to use either a fixed or mobile string line. the following after the first sentence in the first paragraph: Smoothness acceptance testing using the inertial profiler is not required on ramps, loops and turn lanes. The interval at which relative profile elevations are reported shall be 2”. Operate the profiler at any speed as per the manufacturer’s recommendations to collect valid data. After testing, transfer the profile data from the profiler portable computer’s hard drive to a write once storage media (Flash drive, USB, DVD-R or CD-R) or electronic media approved by the Engineer. Submit a report with the documentation and electronic data of the evaluation for each section to the Engineer within 10 days after completion of the smoothness testing. The report shall be in the tabular format for each 0.10 segment or a portion thereof with a summary of the MRI values and the localized roughness areas including corresponding project station numbers or acceptable reference points. Calculate the pay adjustments for all segments in accordance with the formulas in Sections (1) and (2) shown below. The Engineer shall review and approval all pay adjustments unless corrective action is required. The price adjustment will apply to each 0.10-mile section or prorated for a portion thereof, based on the Mean Roughness Index (MRI), the average IRI values from both wheel paths. Areas of localized roughness shall be identified through the “Smoothness Assurance Module (XXX)” provided in the ProVAL software. Use the XXX report to optimize repair strategies by analyzing the measurements from profiles collected using inertial profilers. The ride quality threshold for localized roughness shall be 165 in/mile for any sections that are 15 ft. to 100 ft. in length at the continuous short interval of 25 ft. Submit a continuous roughness report to identify each section with project station numbers or reference points outside the threshold and identify all localized roughness, with the signature of the Operator included with the submitted IRI trace and electronic files. If the Engineer does not require corrective action, the pay adjustment for each area of localized roughness shall be based on the following formula: PA = (165 – LR#) 5 Where: PA = Pay Adjustment (dollars) LR# = The Localized Roughness number determined from XXX report for the ride quality threshold Page 6-41, Subarticle 650-3(B), Mix Design Criteria, replace Table 650-1 with the following: TABLE 650-1 OGAFC GRADATION CRITERIA Sieve Size (mm) Type FC-1 Type FC-1 Modified Type FC-2 Modified

Appears in 2 contracts

Samples: connect.ncdot.gov, connect.ncdot.gov

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 8-16-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-6, Subarticle 607-5(A), Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf https://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20Mix% 20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F I19.0B, C, D 35°F SF9.5A, S9.5B 40°FA S9.5C, S12.5C 45°FA S9.5D, S12.5D 50°F

Appears in 2 contracts

Samples: Proposal Item Sheet, connect.ncdot.gov

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 81-1619-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A)3, Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F 35F I19.0B, C, D 35°F 35F SF9.5A, S9.5B 40°FA 40FA S9.5C, S12.5C 45°FA 45FA S9.5D, S12.5D 50°F50F A. For the final layer of surface mixes containing recycled asphalt shingles (RAS), the minimum surface and air temperature shall be 50ºF. Page 6-23, Subarticle 610-5(A), General, lines 33-34, replace the last sentence of the third paragraph with the following: Produce the mixture at the asphalt plant within ±25 ºF of the JMF mix temperature. The temperature of the mixture, when discharged from the mixer, shall not exceed 350ºF. Page 6-26, Article 610-8, SPREADING AND FINISHING, line 34, add the following new paragraph: As referenced in Section 9.6.3 of the HMA/QMS Manual, use the automatic screed controls on the paver to control the longitudinal profile. Where approved by the Engineer, the Contractor has the option to use either a fixed or mobile string line. the following after the first sentence in the first paragraph: Smoothness acceptance testing using the inertial profiler is not required on ramps, loops and turn lanes. The interval at which relative profile elevations are reported shall be 2”. Operate the profiler at any speed as per the manufacturer’s recommendations to collect valid data. Page 6-31, Subarticle 610-13(A), Option 1 – Inertial Profiler, lines 11-13, replace the first sentence of the third paragraph with the following: After testing, transfer the profile data from the profiler portable computer’s hard drive to a write once storage media (Flash drive, USB, DVD-R or CD-R) or electronic media approved by the Engineer. Submit a report with the documentation and electronic data of the evaluation for each section to the Engineer within 10 days after completion of the smoothness testing. The report shall be in the tabular format for each 0.10 segment or a portion thereof with a summary of the MRI values and the localized roughness areas including corresponding project station numbers or acceptable reference points. Calculate the pay adjustments for all segments in accordance with the formulas in Sections (1) and (2) shown below. The Engineer shall review and approval all pay adjustments unless corrective action is required. The price adjustment will apply to each 0.10-mile section or prorated for a portion thereof, based on the Mean Roughness Index (MRI), the average IRI values from both wheel paths. Areas of localized roughness shall be identified through the “Smoothness Assurance Module (XXX)” provided in the ProVAL software. Use the XXX report to optimize repair strategies by analyzing the measurements from profiles collected using inertial profilers. The ride quality threshold for localized roughness shall be 165 in/mile for any sections that are 15 ft. to 100 ft. in length at the continuous short interval of 25 ft. Submit a continuous roughness report to identify each section with project station numbers or reference points outside the threshold and identify all localized roughness, with the signature of the Operator included with the submitted IRI trace and electronic files. If the Engineer does not require corrective action, the pay adjustment for each area of localized roughness shall be based on the following formula: PA = (165 – LR#) 5 Where: PA = Pay Adjustment (dollars) LR# = The Localized Roughness number determined from XXX report for the ride quality threshold Page 6-41, Subarticle 650-3(B), Mix Design Criteria, replace Table 650-1 with the following: TABLE 650-1 OGAFC GRADATION CRITERIA Sieve Size (mm) Type FC-1 Type FC-1 Modified Type FC-2 Modified 19.0 - - 100 12.5 100 100 80 - 100 9.50 75 - 100 75 - 100 55 - 80 4.75 25 - 45 25 - 45 15 - 30 2.36 5 - 15 5 - 15 5 - 15 0.075 1.0 - 3.0 1.0 - 3.0 2.0 - 4.0 SHOULDER WEDGE: (9-20-11) (Rev. 8-21-12) 610 SP6 R03R Revise the 2012 Standard Specifications as follows: Page 6-26, Article 610-8, add the following after line 43: Attach a device, mounted on screed of paving equipment, capable of constructing a shoulder wedge with an angle of 30 degrees plus or minus 4 degrees along the outside edge of the roadway, measured from the horizontal plane in place after final compaction on the final surface course. Use an approved mechanical device which will form the asphalt mixture to produce a wedge with uniform texture, shape and density while automatically adjusting to varying heights. Payment for use of this device will be incidental to the other pay items in the contract.

Appears in 1 contract

Samples: connect.ncdot.gov

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 810-1621-1614) 605, 609, 610, 650 650, 660 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A), Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. 3 FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), ) Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 DESIGN MIXING TEMPERATURE AT THE ASPHALT PLANT PLANTA Binder Grade HMA JMF Mix Temperature PG 58-28; WMA JMF Temperature Range PG 64-22 250 300ºF 225 - 290ºF 275ºF PG 70-22 275- 305ºF 315ºF 240 - 290ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F I19.0B, C, D 35°F SF9.5A, S9.5B 40°FA S9.5C, S12.5C 45°FA S9.5D, S12.5D 50°F335ºF 260 - 310ºF

Appears in 1 contract

Samples: Proposal Item Sheet

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 81-1619-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A)3, Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F I19.0B, C, D 35°F SF9.5A, S9.5B 40°FA S9.5C, S12.5C 45°FA S9.5D, S12.5D 50°F

Appears in 1 contract

Samples: connect.ncdot.gov

AutoNDA by SimpleDocs

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 81-1619-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A)3, Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F 35F I19.0B, C, D 35°F 35F SF9.5A, S9.5B 40°FA 40FA S9.5C, S12.5C 45°FA 45FA S9.5D, S12.5D 50°F50F A. For the final layer of surface mixes containing recycled asphalt shingles (RAS), the minimum surface and air temperature shall be 50ºF. Produce the mixture at the asphalt plant within ±25 ºF of the JMF mix temperature. The temperature of the mixture, when discharged from the mixer, shall not exceed 350ºF. Page 6-26, Article 610-8, SPREADING AND FINISHING, line 34, add the following new paragraph: As referenced in Section 9.6.3 of the HMA/QMS Manual, use the automatic screed controls on the paver to control the longitudinal profile. Where approved by the Engineer, the Contractor has the option to use either a fixed or mobile string line. the following after the first sentence in the first paragraph: Smoothness acceptance testing using the inertial profiler is not required on ramps, loops and turn lanes. The interval at which relative profile elevations are reported shall be 2”. Operate the profiler at any speed as per the manufacturer’s recommendations to collect valid data. After testing, transfer the profile data from the profiler portable computer’s hard drive to a write once storage media (Flash drive, USB, DVD-R or CD-R) or electronic media approved by the Engineer. Submit a report with the documentation and electronic data of the evaluation for each section to the Engineer within 10 days after completion of the smoothness testing. The report shall be in the tabular format for each 0.10 segment or a portion thereof with a summary of the MRI values and the localized roughness areas including corresponding project station numbers or acceptable reference points. Calculate the pay adjustments for all segments in accordance with the formulas in Sections (1) and (2) shown below. The Engineer shall review and approval all pay adjustments unless corrective action is required. The price adjustment will apply to each 0.10-mile section or prorated for a portion thereof, based on the Mean Roughness Index (MRI), the average IRI values from both wheel paths. Areas of localized roughness shall be identified through the “Smoothness Assurance Module (XXX)” provided in the ProVAL software. Use the XXX report to optimize repair strategies by analyzing the measurements from profiles collected using inertial profilers. The ride quality threshold for localized roughness shall be 165 in/mile for any sections that are 15 ft. to 100 ft. in length at the continuous short interval of 25 ft. Submit a continuous roughness report to identify each section with project station numbers or reference points outside the threshold and identify all localized roughness, with the signature of the Operator included with the submitted IRI trace and electronic files. If the Engineer does not require corrective action, the pay adjustment for each area of localized roughness shall be based on the following formula: PA = (165 – LR#) 5 Where: PA = Pay Adjustment (dollars) LR# = The Localized Roughness number determined from XXX report for the ride quality threshold Page 6-41, Subarticle 650-3(B), Mix Design Criteria, replace Table 650-1 with the following: TABLE 650-1 OGAFC GRADATION CRITERIA Sieve Size (mm) Type FC-1 Type FC-1 Modified Type FC-2 Modified

Appears in 1 contract

Samples: connect.ncdot.gov

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 8-16-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-6, Subarticle 607-5(A), Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F I19.0B, C, D 35°F SF9.5A, S9.5B 40°FA S9.5C, S12.5C 45°FA S9.5D, S12.5D 50°F

Appears in 1 contract

Samples: connect.ncdot.gov

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 81-1619-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A)3, Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F 35F I19.0B, C, D 35°F 35F SF9.5A, S9.5B 40°FA 40FA S9.5C, S12.5C 45°FA 45FA S9.5D, S12.5D 50°F50F A. For the final layer of surface mixes containing recycled asphalt shingles (RAS), the minimum surface and air temperature shall be 50ºF. Produce the mixture at the asphalt plant within ±25 ºF of the JMF mix temperature. The temperature of the mixture, when discharged from the mixer, shall not exceed 350ºF. Page 6-26, Article 610-8, SPREADING AND FINISHING, line 34, add the following new paragraph: As referenced in Section 9.6.3 of the HMA/QMS Manual, use the automatic screed controls on the paver to control the longitudinal profile. Where approved by the Engineer, the Contractor has the option to use either a fixed or mobile string line. the following after the first sentence in the first paragraph: Smoothness acceptance testing using the inertial profiler is not required on ramps, loops and turn lanes. The interval at which relative profile elevations are reported shall be 2”. Operate the profiler at any speed as per the manufacturer’s recommendations to collect valid data. sentence of the tenth paragraph. After testing, transfer the profile data from the profiler portable computer’s hard drive to a write once storage media (Flash drive, USB, DVD-R or CD-R) or electronic media approved by the Engineer. Submit a report with the documentation and electronic data of the evaluation for each section to the Engineer within 10 days after completion of the smoothness testing. The report shall be in the tabular format for each 0.10 segment or a portion thereof with a summary of the MRI values and the localized roughness areas including corresponding project station numbers or acceptable reference points. Calculate the pay adjustments for all segments in accordance with the formulas in Sections (1) and (2) shown below. The Engineer shall review and approval all pay adjustments unless corrective action is required. The price adjustment will apply to each 0.10-mile section or prorated for a portion thereof, based on the Mean Roughness Index (MRI), the average IRI values from both wheel paths. Areas of localized roughness shall be identified through the “Smoothness Assurance Module (XXX)” provided in the ProVAL software. Use the XXX report to optimize repair strategies by analyzing the measurements from profiles collected using inertial profilers. The ride quality threshold for localized roughness shall be 165 in/mile for any sections that are 15 ft. to 100 ft. in length at the continuous short interval of 25 ft. Submit a continuous roughness report to identify each section with project station numbers or reference points outside the threshold and identify all localized roughness, with the signature of the Operator included with the submitted IRI trace and electronic files. If the Engineer does not require corrective action, the pay adjustment for each area of localized roughness shall be based on the following formula: PA = (165 – LR#) 5 Where: PA = Pay Adjustment (dollars) LR# = The Localized Roughness number determined from XXX report for the ride quality threshold Page 6-41, Subarticle 650-3(B), Mix Design Criteria, replace Table 650-1 with the following: TABLE 650-1 OGAFC GRADATION CRITERIA Sieve Size (mm) Type FC-1 Type FC-1 Modified Type FC-2 Modified 19.0 - - 100 12.5 100 100 80 - 100 9.50 75 - 100 75 - 100 55 - 80 4.75 25 - 45 25 - 45 15 - 30 2.36 5 - 15 5 - 15 5 - 15 0.075 1.0 - 3.0 1.0 - 3.0 2.0 - 4.0 SHOULDER WEDGE: (9-20-11) (Rev. 8-21-12) 610 SP6 R03R Revise the 2012 Standard Specifications as follows: Page 6-26, Article 610-8, add the following after line 43: Attach a device, mounted on screed of paving equipment, capable of constructing a shoulder wedge with an angle of 30 degrees plus or minus 4 degrees along the outside edge of the roadway, measured from the horizontal plane in place after final compaction on the final surface course. Use an approved mechanical device which will form the asphalt mixture to produce a wedge with uniform texture, shape and density while automatically adjusting to varying heights. Payment for use of this device will be incidental to the other pay items in the contract.

Appears in 1 contract

Samples: Proposal Item Sheet

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 84-1621-1615) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A), Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. 3 FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), ) Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20Mix%20Asph alt%20Approved%20List.pdf Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 DESIGN MIXING TEMPERATURE AT THE ASPHALT PLANT PLANTA Binder Grade HMA JMF Mix Temperature PG 58-28; WMA JMF Temperature Range PG 64-22 250 300ºF 225 - 290ºF 275ºF PG 70-22 275- 305ºF 315ºF 240 - 290ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F I19.0B, C, D 35°F SF9.5A, S9.5B 40°FA S9.5C, S12.5C 45°FA S9.5D, S12.5D 50°F335ºF 260 - 310ºF

Appears in 1 contract

Samples: connect.ncdot.gov

ASPHALT PAVEMENTS - SUPERPAVE. (6-19-12) (Rev. 81-1619-16) 605, 609, 610, 650 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. TABLE 605-1 APPLICATION RATES FOR TACK COAT Existing Surface Target Rate (gal/sy) Emulsified Asphalt New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. TABLE 605-2 APPLICATION TEMPERATURE FOR TACK COAT Asphalt Material Temperature Range Asphalt Binder, Grade PG 64-22 350 - 400°F Emulsified Asphalt, Grade RS-1H 130 - 160°F Emulsified Asphalt, Grade CRS-1 130 - 160°F Emulsified Asphalt, Grade CRS-1H 130 - 160°F Emulsified Asphalt, Grade HFMS-1 130 - 160°F Emulsified Asphalt, Grade CRS-2 130 - 160°F Page 6-67, Subarticle 607Article 609-5(A)3, Milled Asphalt Pavement, line 25, add the following to the end of the paragraph: Areas to be paid under these items include mainline, turn lanes, shoulders, and other areas milled in conjunction with the mainline and any additional equipment necessary to remove pavement in the area of manholes, water valves, curb, gutter and other obstructions. Page 6-6, Subarticle 607-5(C), Incidental Milling, lines 42-48, replace the paragraph with the following: Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas and intersections milled as a separate operation from mainline milling and re-mill areas that are not due to the Contractor’s negligence whose length is less than 100 feet. Measurement will be made as provided in Subarticle 607-5(A) for each cut the Contractor is directed to perform. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling. FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS, lines 35-37, delete the second sentence of the second paragraph. Page 6-18, Article 610-1 DESCRIPTION, lines 40-41, delete the last sentence of the last paragraph. Page 6-19, Subarticle 610-3(A), Mix Design-General, line 5, add the following as the first paragraph: Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: xxxxx://xxxxxxx.xxxxx.xxx/resources/Materials/MaterialsResources/Warm%20 Mix%20Asphalt%20Approved%20List.pdf Page 6-20, Subarticle 610-3(C), Job Mix Formula (JMF), lines 47-48, replace the last sentence of the third paragraph with the following: The JMF mix temperature shall be within the ranges shown in Table 610-1 unless otherwise approved. Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), replace Table 610-1 with the following: TABLE 610-1 MIXING TEMPERATURE AT THE ASPHALT PLANT Binder Grade JMF Mix Temperature PG 58-28; PG 64-22 250 - 290ºF PG 70-22 275- 305ºF PG 76-22 300- 325ºF Page 6-21, Subarticle 610-3(C) Job Mix Formula (JMF), lines 1-2, in the first sentence of the first paragraph, delete “and compaction”. Lines 4-7, delete the second paragraph and replace with the following: When RAS is used, the JMF mix temperature shall be established at 275ºF or higher. FOR PRODUCING AND PLACING ASPHALT MIXTURES, lines 15-17, replace the second sentence of the first paragraph with the following: Do not place asphalt material when the air or surface temperatures, measured at the location of the paving operation away from artificial heat, do not meet Table 610-5. Page 6-23, Article 610-4, WEATHER, TEMPERATURE AND SEASONAL LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES, replace Table 610-5 with the following: TABLE 610-5 PLACEMENT TEMPERATURES FOR ASPHALT Asphalt Concrete Mix Type Minimum Surface and Air Temperature B25.0B, C 35°F I19.0B, C, D 35°F SF9.5A, S9.5B 40°FA S9.5C, S12.5C 45°FA S9.5D, S12.5D 50°F

Appears in 1 contract

Samples: Proposal Item Sheet