Antelope Substation Sample Clauses
Antelope Substation. 1. Install dead-end structure, insulators and line drop, as necessary, to terminate the Antelope – Western Antelope Dry Ranch 66 kV Transmission Line.
2. Three (3) voltage transformers with steel pedestal support structures.
3. Install the following relays for the Antelope – Western Antelope Dry Ranch 66 kV Transmission Line
a. One GE L90 line current differential relay with dual dedicated digital communication channels to the Small Generating Facility.
b. One SEL-311 line current differential relay with dual dedicated digital communication channels to the Small Generating Facility.
4. Install new telecommunication equipment to support the Antelope - Western Antelope Dry Ranch 66 kV Transmission Line protection, SCADA and the Participating TO’s applicable voice and data requirements.
Antelope Substation. Implement the following upgrades at the Antelope 66kV Substation to support interconnection for the Western Antelope Dry Ranch Project and termination of the Antelope - Western Antelope Dry Ranch 66 kV Transmission Line.
Antelope Substation. Equip 220 kV Position 6 with two 220 kV circuit breakers and four sets of 220 kV disconnect switches to terminate the Antelope-Windhub 500 kV line initially energized at 220 kV.
Antelope Substation. Implement the following upgrades at the Antelope 66kV Substation to support interconnection for the Western Antelope Dry Ranch Project and termination of the Antelope - Western Antelope Dry RanchPlainview 66 kV Transmission Line.
a. Circuit Breakers – Two (2) 2000 A 40 kA 66 kV circuit breakers
b. Disconnect Switches – Four (4) 2000 A 40 kA horizontal-mounted group-operated disconnect switches
c. Bay position conductor
d. Power System Controls: Modify points on existing RTU to account for new gen-tie
Antelope Substation a. Protection relays to match relays installed at Q628 66 kV Substation
b. Three potential transformers
c. Power System Controls: Modification of points on existing RTU to account for new system topology
Antelope Substation. Install one set of N60 relays to add the generation to the ▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇ ▇▇ SPS.
Antelope Substation. Install one (1) set of N60 relays to add the generation to the Northern Area 500 kV SPS.