Tracking and Reporting definition

Tracking and Reporting means, but is not limited to, the tracking of versions, advertising design time, premedia processing and consumables, all Service Levels, etc.
Tracking and Reporting. Track expected results and expenditures measure progress against identified objectives and report outcomes on a regular basis.

Examples of Tracking and Reporting in a sentence

  • The OAG’s Contract Administrator is responsible for all aspects of Contract administration including but not limited to creation and maintenance of the Contract file, managing changes to the Contract, maintaining financial information, and entering Contract information into the OAG’s Contract Tracking and Reporting System (CTRS).

  • Tracking and Reporting on Existing Sites‌ Ecology staff will continue to offer technical and financial assistance for existing prioritized sites.

  • Tracking and Reporting provides for real-time reporting of Precision eMail® deliverability and tracking of user interaction per Precision eMail® message.

  • There will not be an option to substitute calculated savings or another deemed savings number from the RTF reporting system (PTR (Planning, Tracking, and Reporting System)).

  • The detailed work plan (which in NH is formed through the combination of the P&C List, a comprehensive work plan generated from the NHDES Measures Tracking and Reporting System [MTRS], and other separate grant work plans, a significant portion of which is funded with USEPA dollars through the PPG and other funding sources), is the result of a robust negotiations process between NHDES and EPANE Senior Leadership and Program Managers.

  • Both initiatives use the Regional Technical Forum’s (RTF) Planning, Tracking, and Reporting (PTR) System (▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇▇▇.▇▇▇/), its list of qualifying measures, verification protocols, and custom project approval processes.

  • OCLA will: Provide Attorney with a Case Status Tracking and Reporting Form.

  • It is also integral to the process of negotiating the two-year P&C Lists and the comprehensive work plans generated through the NHDES’ Measures Tracking and Reporting System (MTRS) Database.

  • Tracking and Reporting Covered Individual Utilization, Performance Standards, and Pricing Guarantees.

  • PTCS™: Performance Tested Comfort Systems PTR: Planning, Tracking, and Reporting System for utilities to report conservation activity.

Related to Tracking and Reporting

  • Monitoring and reporting requirements means one or more of

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • National Ambient Air Quality Standards or “NAAQS” means national ambient air quality standards that are promulgated pursuant to Section 109 of the Act, 42 U.S.C. § 7409.

  • Water quality means the chemical, physical and biological condition of water.

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);